2Basic Causes of Variation
- Assignable causes
- Common causes
-
- Key
3Types of Control Charts
- Attribute (Go or no-go information)
- Defectives
- p-chart application
- Variable (Continuous)
- Usually measured by the mean and the standard
deviation. - X-bar and R chart applications
4Types of Statistical Quality Control
Statistical
Statistical
Quality Control
Quality Control
Process
Acceptance
Process
Acceptance
Control
Sampling
Control
Sampling
Variables
Attributes
Variables
Attributes
Variables
Attributes
Variables
Attributes
Charts
Charts
Charts
Charts
5Statistical Process Control (SPC) Charts
6Control Limits
- We establish the Upper Control Limits (UCL) and
the Lower Control Limits (LCL) with plus or minus
3 standard deviations. Based on this we can
expect 99.7 of our sample observations to fall
within these limits.
99.7
7Example of Constructing a p-Chart Required Data
8Statistical Process Control FormulasAttribute
Measurements (p-Chart)
Given
Compute control limits
9Example of Constructing a p-chart Step 1
1. Calculate the sample proportions, p (these
are what can be plotted on the p-chart) for each
sample.
10Example of Constructing a p-chart Steps 23
2. Calculate the average of the sample
proportions.
3. Calculate the standard deviation of the sample
proportion
11Example of Constructing a p-chart Step 4
4. Calculate the control limits.
12Example of Constructing a p-Chart Step 5
5. Plot the individual sample proportions, the
average of the proportions, and the control
limits
13R Chart
- Type of variables control chart
- Interval or ratio scaled numerical data
- Shows sample ranges over time
-
- Monitors variability in process
- Example Weigh samples of coffee compute ranges
of samples Plot
14R Chart Control Limits
From Table (function of sample size)
Sample Range in sample i
Samples
15R Chart Example
- Youre manager of a 500-room hotel. You want to
analyze the time it takes to deliver luggage to
the room. For 7 days, you collect data on 5
deliveries per day. Is the process in control?
16R Chart Hotel Data
- Sample
- Day Delivery Time Mean Range
- 1 7.30 4.20 6.10 3.45 5.55 5.32
17R Chart Hotel Data
- Sample
- Day Delivery Time Mean Range
- 1 7.30 4.20 6.10 3.45 5.55 5.32 3.85
18R Chart Hotel Data
- Sample
- Day Delivery Time Mean Range
- 1 7.30 4.20 6.10 3.45 5.55 5.32 3.85 2 4.60 8.7
0 7.60 4.43 7.62 6.59 4.27 3 5.98 2.92 6.20 4.20
5.10 4.88 3.28 4 7.20 5.10 5.19 6.80 4.21 5.70
2.99 5 4.00 4.50 5.50 1.89 4.46 4.07 3.61 6 10
.10 8.10 6.50 5.06 6.94 7.34 5.04 7 6.77 5.08 5.
90 6.90 9.30 6.79 4.22
19R Chart Control Limits Solution
From Table (n 5)
20R Chart Control Chart Solution
UCL
R-bar
21?X Chart
- Type of variables control chart
- Interval or ratio scaled numerical data
- Shows sample means over time
- Monitors process average
- Example Weigh samples of coffee compute means
of samples Plot
22?X Chart Control Limits
From Table
Mean of sample i
Range of sample i
Samples
23?X Chart Example
- Youre manager of a 500-room hotel. You want to
analyze the time it takes to deliver luggage to
the room. For 7 days, you collect data on 5
deliveries per day. Is the process in control?
24 X Chart Hotel Data
- Sample
- Day Delivery Time Mean Range
- 1 7.30 4.20 6.10 3.45 5.55 5.32 3.85 2 4.60 8.7
0 7.60 4.43 7.62 6.59 4.27 3 5.98 2.92 6.20 4.20
5.10 4.88 3.28 4 7.20 5.10 5.19 6.80 4.21 5.70
2.99 5 4.00 4.50 5.50 1.89 4.46 4.07 3.61 6 10
.10 8.10 6.50 5.06 6.94 7.34 5.04 7 6.77 5.08 5.
90 6.90 9.30 6.79 4.22
25?X Chart Control Limits Solution
26?X ChartControl Chart Solution
UCL
X-bar
LCL
27X AND R CHART EXAMPLEIN-CLASS EXERCISE
- The following collection of data represents
samples of the amount of force applied in a
gluing process - Determine if the process is in control
- by calculating the appropriate upper and lower
- control limits of the X-bar and R charts.
28X AND R CHART EXAMPLEIN-CLASS EXERCISE
29Example of x-bar and R charts Step 1. Calculate
sample means, sample ranges, mean of means, and
mean of ranges.
30Example of x-bar and R charts Step 2. Determine
Control Limit Formulas and Necessary Tabled Values
31Example of x-bar and R charts Steps 34.
Calculate x-bar Chart and Plot Values
32Example of x-bar and R charts Steps 56
Calculate R-chart and Plot Values
33SOLUTIONExample of x-bar and R charts
- 1. Is the process in Control?
- 2. If not, what could be the cause for the
process being out of control?
34Process Capability
- Process limits -
- Tolerance limits -
-
35Process Capability
- How do the limits relate to one another?
36Process Capability Measurement
Cp index Tolerance range / Process range What
value(s) would you like for Cp?
37(No Transcript)
38UTL
LTL
39- While the Cp index provides useful information on
process variability, it does not give information
on the process average relative to the tolerance
limits. Note -
UTL
LTL
40Cpk Index
s
Together, these process capability Indices show
how well parts being produced conform to design
specifications.
41Since Cp and Cpk are different we can conclude
that the process is not centered, however the Cp
index tells us that the process variability is
very low
42An example of the use of process capability
indices
The design specifications for a machined slot is
0.5 .003 inches. Samples have been taken and
the process mean is estimated to be .501. The
process standard deviation is estimated to be
.001. What can you say about the capability of
this process to produce this dimension?
43Process capability
Machined slot (inches)
0.497 inches LTL
0.503 inches UTL
? 0.001 inches
Process mean 0.501 inches
44Sampling Distributions(The Central Limit Theorem)
- Regardless of the underlying distribution, if the
sample is large enough (gt30), the distribution of
sample means will be normally distributed around
the population mean with a standard deviation of
45Computing Process Capability Indexes Using
Control Chart Data
- Recall the following info from our in class
exercise -
-
- Since A2 is calculated on the assumption of three
sigma limits
46- From the Central Limit Theorem
- So,
- Therefore,
47- Suppose the Design Specs for the Gluing Process
were 10.7 ? .2, Calculate the Cp and Cpk
Indexes - Answer
48Note, multiplying each component of the Cpk
calculation by 3 yields a Z value. You can use
this to predict the of items outside the
tolerance limits From Appendix E we would
expect non-conforming product from this process
.002 or .2 of the curve
.02 or 2 of the curve
49Capability Index In Class Exercise
- You are a manufacturer of equipment. A drive
shaft is purchased from a supplier close by. The
blueprint for the shaft specs indicate a
tolerance of 5.5 inches .003 inches. Your
supplier is reporting a mean of 5.501 inches.
And a standard deviation of .0015 inches. - What is the Cpk index for the suppliers process?
50(No Transcript)
51- Your engineering department is sent to the
suppliers site to help improve the capability on
the shaft machining process. The result is that
the process is now centered and the CP index is
now .75. On a percentage basis, what is the
improvement on the percentage of shafts which
will be unusable (outside the tolerance limits)?
52To answer this question we must determine the
percentage of defective shafts before and after
the intervention from our engineering department
53Before
54After
Since the process is centered then Cpk Cp Cp
UTL-LTL / 6s, so the tolerance limits are .75
x 6s 4.5s apart each 2.25s from the mean
-4
55So the percentage decrease in defective parts is
56Basic Forms of Statistical Sampling for Quality
Control
- Sampling to accept or reject the immediate lot of
product at hand - Sampling to determine if the process is within
acceptable limits
57Acceptance Sampling
58Acceptance Sampling
59Risk
- Acceptable Quality Level (AQL)
-
- a (Producers risk)
-
- Lot Tolerance Percent Defective (LTPD)
-