APS - PowerPoint PPT Presentation

1 / 13
About This Presentation
Title:

APS

Description:

L ekine eaccept etrigger ereco etrack-match. L : Luminosity 4.8 pb-1 ... ekine: only simulate muons which reach muon chamber. eaccept: inactive material, etc. ... – PowerPoint PPT presentation

Number of Views:48
Avg rating:3.0/5.0
Slides: 14
Provided by: chunh2
Category:
Tags: aps | kine

less

Transcript and Presenter's Notes

Title: APS


1
Inclusive J/? Production at DØ
Chunhui Luo
2
Outline
  • D0 detector elements crucial for the J/? cross
    section measurement
  • Summary of Run I Results
  • J/ ? signal in Run II
  • Cross Section Determination
  • Future Polarization Measurement
  • Aims
  • Test of Quantum Chromodynamics (QCD)
  • Test of the Detector performance

3
The Run II DØ Detector
antiprotons
4
DØ Tracker
125 cm
5
Muon System
  • Central and Forward regions, coverage up to ?
    2
  • Three layers one inside (A), two outside (B, C)
    the toroid magnets
  • Consists of scintillators and drift tubes
  • Central Proportional Drift Tubes (PDTs)
  • 6624 drift cells (10.1 ? 5.5 cm) in 94 three-
    and four-deck chambers
  • Central Scintillation Counters
  • 360 cosmic ray counters outside the toroid (??
    22.5?)
  • 630 A?? counters inside (?? 4.5?), ?? 0.1
  • Forward Mini Drift Tubes (MDTs)
  • 6080 8-cell tubes in 8 octants per layer on
    North and South side, cell cross-section 9.4 ?
    9.4 mm
  • Forward Scintillation Counters (Pixels)
  • 4214 counters on the North and South side
  • ?? 4.5? matches the MDT sector size

Fully commissioned
6
Muon System Performance
Matching of central tracks to ?s improves
momentum resolution
J/? invariant mass
Muon stand alone system
Muon plus central tracking
CHEP02 31st International Conference on High
Energy Physics, Amsterdam, 24 31 July, 2002
7
DØs First J/? Candidates
  • 5 pb-1
  • J/???? vertex
  • pT(track)gt2 GeV/c, matched to a muon
  • Positive decay length

8
Run I J/? production cross section
9
Run II J/? production cross section
N(J/?)
s(J/?)
L ekine eaccept etrigger ereco etrack-match
L Luminosity 4.8 pb-1
eaccept inactive material, etc.
ekine only simulate muons which reach muon
chamber
etrigger di-muon trigger.
ereco muon system only
etrack-match muons matched to central track
10
Run II J/? production cross section
4.8 pb-1 of data

30 systematic uncertainty
region not measured in Run I
11
Jpsi Signal
  • By January 2003, 129K J/? s are collected
  • Integrated Luminosity
  • 50 Pb-1

J/? 129K Upsilon17K
s(J/?) 78 3 MeV
N(J/?) 129,024
Invariant Mass (GeV)
12
Future measurements J/? polarization
? angle(J/?lab,µJ/?) I(?) 3/2/(a3)
(1 a cos2 ?)
MC
a (sT -2sL)/(sT 2sL)
This distribution is Monte template to use to
find J/ ? polarization.
13
Conclusion
  • First measurement in the new kinematic range.
  • Rapidity Range 0.0-1.8
  • Energy of Central Mass 1.98 TeV
  • Consistent with Run I measurement
  • Near Future
  • Cross Section measurement using full statistics
    and improved reconstruction software for Jpsi
    and upsilon states
  • Reconstruct ?c -gt J/? ? decay
  • J/?, upsilon Polarization measurement will be
    measured
Write a Comment
User Comments (0)
About PowerShow.com