AMS-02: Offline and Analysis Software (Status) J.Alcaraz. July 28, 2005. AMS TIM at CERN ... cardreader. CERN networking. Star point. CERN Prevessin Bldg.892 wing SA ...
AMS is allocated 33 offices/labs in buildings 892 and 974 on the Prevessin site, ... For Click Wallsystem, Systemwall, galvanized framework, covered on both sides ...
Test beams at DESY. Bologna - 31 Mar. 2006. G. Cibinetto. 3. Neutrino energy spectrum ... synchrotron DESY II. The photons are converted to electron/positron ...
... final racks destined for USC55 operational as test bed in B904 ... (Opto inputs or simu test frames) running continuously 'soaking' with central Tracker DAQ ...
14.05 Computing rules Denise Hegarty. 14.15 AIS and e-business applications James Purvis ... J. Richards (DPO) F. Gagliardi (EU proj.) L. Robertson (LCG) 24 June 2004 ...
... report. Wim de Boer, Chan Hoon Chung*, Florian Hauler, Levin Jungermann, Mike Schmanau, ... JINF = data concentrator and link to higher DAQ for TRD. UHVG ...
ECAL Safety System (ESS) and the ECAL Precision Temperature and Humidity Monitoring (PTM/HM) ... Sensor production, calibration, installation in SMs (ESS, PTM/HM) ...
Mise en place de ronde par la TCR afin de surveiller la bonne marche de la station 3-4. ... Pas d 'effet sur le SPS car celui ci d j arr t auparavant. ...
Video cards - 50% shipment arrives today and 50 ... Server at FCC - installed and operational (hardware failure being ... Mac Pro for Outreach - needs to ...
A UPS supplying the PLCs for the demi water stations had tripped due to water infiltration ... seen when compensator in BB3 tripped. SPS stopped for 1h each ...
Experiment orchestra director - all mastership in a single module. Channel A/B - TTC encoding ... All mastership in one module. Provides a lot of flexibility ...
Link local track segments into distinct 3D tracks (FPGA logic) ... Software may be in good shape since DDU already supported by EMU in XDAQ environment ...
... properties due to manufacturing process, non-uniform field ... Energy stored. The total energy stored in the magnetic field of each dipole is = 7 MJ ...
Manuel Aguilar-Ben tez, CIEMAT, Madrid - Spain. AMS-MOU: Status of the Signatories ... Memorandum of Understanding for Collaboration in the Integration, Testing and ...
P2 Cavern. P2 Access. shaft. Optical Fibre. 200 meters. LDC. P. Vande Vyvre CERN/EP ... the distance from the detector in the cavern to the ALICE computing room in the ...
Designed by the Laboratoire de Physique Corpusculaire, Clermont-Ferrand for use ... for Improving the performance of DC Beam Transformers, CERN/PS 97-57 (BD) & Proc. ...
BST ... All necessary real-time information is regrouped and transmitted in a so-called BST message. ... BST based on TTC technology and will use the message ...
1 school from Gran Sasso (left over from first ... November 2005 : 18 chambers to Bologna, Catania, Cagliari, Gran Sasso, Lecce,Torino (transport company) ...
1. a preparatory group constituted of scientists selected 'ad hominem' (I am a member of this) ... 3. representatives of the main institutions/laboratories ...
Electronics work in 2006-7. Finish & Test Master Clock ... Monte Carlo studies of new conditions, validate with present data. Respond to changing apparatus ...
Used for HCAL, ECAL, SLB, Global Calorimeter Trigger integration tests ... in radiation, in crate w/ 7 Trigger Motherboards connected to Sector Processor ...
International collaboration to construct a gamma-ray satellite, with members from ... EGRET = Energetic Gamma-ray. Experiment Telescope. LAT status ...