Title: Introduction. to Asbestos Practices -1 hr.
1Introduction. to Asbestos Practices -1 hr.
- DOS Course 49-5108
- In-service 68110MMYY0000
- By Dan Coyle
2Registration Cards
- County Location
- Course 49-5108
- FDID City Code
- Completion Date MM-YY
- Instructor blank
- County Code relates to FDID
3Registration Cards (cont.)
- Instructor Code
- County Code
- In-service Number
- 681100MMYY0000
4Contact
- NYS Dept. of Labor
- DOSH-ACB, Room 202
- 450 S. Salina St.
- Syracuse 13202
- (315) 479-3215
- www.labor.state.ny.us, labor.ny.gov
- www.alternativemodelingsolution.com
5Talk Choices
- One Hour
- general basics, code independent
- Two Hour
- extreme work practices details ICR56
6Major CEO Points
- Always Licensed Contractors Certified People
- Survey or ID Friable Non-friable ACMs
- Notifications - Building, DOL, EPA
- Clearance Visual Inspection
- Written Assurance of Removal Performed for Work
Area Associated ACMs
7Talk Agenda
- I. Asbestos Background - preliminary
- II. Regulatory Jurisdictions govt
- III. General Project Life Cycle - phases
- IV. Statutory Credentials - permits
- V. Project Oversight who, what
- VI. Project Abatement Basics - jargon
8Talk Agenda (cont.)
- VII. Common Abatement Methods ACM types
- VIII. Variances alternatives, difficulties
- IX. Enforcement agencies, issues
- X. Web Pages more information
- XI. Conclusion good ideas
- XII. Proposed ICR56 Revisions ?
9I. Asbestos Background
- A Properties why what asbestos is
- B. Health concerns damage diseases
- C. Applications materials where found
- D. Concept of asbestos project abatement
10A. Properties
- Fibrous mineral ? small micron size
- Various types ? Canadian chrysotile, amosite,
others - Common nice to use
- Heat insulator
- Material binder
11B. Adverse Health Effects
- Lung Cancer Smoking Risks
- Synergistic, multipied gt X
- Mesothelioma of pleural lining fatal
- Asbestosis (lung capacity)- chronic
- General Fibrosis (alveoli scarring)- respirable
dusts, not acute - Gastrointestinal problems skin?
12C. Applications
- Common in older (Thermal System Insulation)
TSIs, fireproofing - Common in older plasters, tiles
- Common in built-in roofing, shingles
- Common in newer glues, mastics, sealants
- Many construction uses!
13Why Excessive Exposure Risks
- Adverse Health Effects in Long Term ? 20 years
(smokers, contaminations?) - Common in Construction Practices
- Exists in many places insulation, walls,
flooring, ceilings, patches - Improper controls for exposure risks
- Friable vs non-friable ACMs breaking
14ACM Types
- Asbestos Containing Materials
- Friable easily crumbled by hand- TSIs,
fireproofing, plasters, severely damaged - Non-friables fibers encapsulated difficult to
break up, VAT, asphalt, organically bound - Cementatious can be pulverized easily
-
15D. Concept of Asbestos Project
- Inspect for damaged and undamaged ACM
- Survey- ACMs discovered
- In conjunction w/ demolition or renovation
- Project management options of removal, repair,
enclosure, or encapsulation - Project completion clearance
16Abatement Options
- Removal ACMs all gone
- Enclosure air tight construction around
- Encapsulation surface or bridging
- All require same project procedures!
- Repair substrate spot removal sealant
- Operations Maintenance housekeeping, repairs
17Renovations
- Survey for Impacted Suspect Materials
- Portions built before 01January1974
- Employees to be Notified of ACMs
- All Materials Presumed ACMs
- All Waste is assumed Regulated ACM (RACM) w/o
survey
18Demolitions
- New Definition? Remove load bearing member?
- Survey Required 5.1, p41 LL Section 241
Paragraph 10, built before 01 Jan. 1974 - CEO, ACB, Site copies
- Structurally unsound Ag bldgs.-no survey
- Abatement Clearance Normally
19II. Jurisdictions
- A. USEPA Air pollutants, schools
- B. OSHA Industry, construction, etc.
- C. NYSDEC Solid Waste Facilities Transporter
Permits- transfer stations also - D. NYSDOL Asbestos projects
20 A. USEPA 40CFR Part 763 AHERA schools
- Asbestos Hazard Emergency Response Act from Clean
Air Act - Survey test building interiors
- Renovation surveys management plans for
response actions to maintain ACMs
21AHERA (cont.)
- Final air clearances for large scale / long
duration projects in schools - NYS Education Dept. DOH enforcement agents
- Compliance w/ OSHA, state abatement, all
applicable regulations
22 USEPA 40CFR Part 61 NESHAP air quality
- National Emission Standards for Hazardous Air
Pollutants - Demolition surveys
- Qualified supervisor
- Notifications for demolitions renovations of
major quantity RACMs (friables) - Special disposal of RACMs
23NESHAP ACM Types
- Regulated Asbestos Containing Materials
- Friable (RACM) surfacing- TSI, plasters,
fireproofing trowelled joint compound? - Category II Non-friables transite
- Category I Non-friables VAT, built-up roofing,
shingles, glues /mastics, window glazing
/caulks?
24B. OSHA
- 1. General Industry Standard
- 2. Construction Standard- 29CFR 1926.1101
- 3. Other S H Standards
251. General Industry Standard
- 29CFR 1910.1001 Asbestos
- Employee Communication- surveys, exposure
notification, training - Medical surveillance records
- Regulated areas of exposure risks
- Special work practices to suit industry
26General Industry Standard (cont.)
- Engineering controls low risk containment
- PPE - hygiene, respirators
- Housekeeping janitorial, OM
- Administrative measures employee rotations,
common sense, etc.
272. Construction Standard
- 29CFR 1926.1101 Asbestos
- Starting point for project methods
- Basic work practices for 4 project classes
- By ACM types amounts- classes
- Abatement industry
28OSHA Project Class I
- friables (TSI, surface coatings) ?
- NPEs (Negative Pressure Enclosures),
- Wet removals stripping of surfaces
- Disposal in leak tight packages (e.g.
bags) - Greater than 10 square 25 linear feet
29Class II
- non-friables (NOBs transite) ? bulk removals,
not strips - Caulking, glazing, glues, shingles, tiles,
- critical barriers indoors
- Housekeeping prompt clean up
- And disposal in leak tight containers (e.g.
dumpsters)
30Class III
- OM (Operations Maintenance)-
- Minor projects or disturbances
- Limited isolations short duration
- Glove bags, mini-enclosures, tents
31Class IV
- Clean up of ACM debris, dust, etc.
- Sealed bags for dust debris
- Basic Housekeeping janitorial!
- Generally, OSHA classes simply range from a
sealed area stripping, reduced emissions from
bulk removals, minor scale operations, and
clean-ups.
323. Other OSHA Standards
- 29CFR 1910.134 Respiratory Protection
- 1926.450 Scaffolds
- 1926.500 Fall Protection
- 1926.1053 Ladders
- PPE gloves, helmets, feet, clothing
- Confined spaces
33C. DEC
- Disposal transport jurisdiction
- Construction debris for unpackaged non-friables
and - Special handling /packaging for friables
(RACMs), e.g. no surveys - Title 6 Part 360 Solid Waste Management
Facilities, 364 Waste Transporter Permits
34D Labor
- Legislative intent - Labor Law Article 30,
Section 900 - Contractor licenses, worker certifications,
project notifications credentials permits - Chapter 520 of the Laws of 1989- In-Plant
- Excessive Exposure Risks due to improper asbestos
projects (poor Life Cycle)
35Labor Guidelines
- Public protection from fibre releases due to bad
contractors - Labor Law Article 30 asbestos project
- Removal, encapsulation, enclosure, or disturbance
of friable asbestos or handling any ACM which may
cause fiber release - 12NYCRR Part 56, Industrial Code Rule 56
(notifications, surveys, work practices)
36Labor (cont.)
- Any visible ACM (dust, debris, etc.) is a project
- Removal of all ACMs before renovations
demolitions - NPEs for all indoor projects except In-Plant
Operations (OSHA coverage)
37Labor (cont.)
- Package (bags) all non-friable and friable ACMs
unless outdoors
38III. General Project Life Cycle
- Idea of abatement expands project concept
- Derived from AHERA ICR56
- Project procedures dependent upon ACM
- Public protection ? Monies
- 3 Phases- Pre-abate, abate, clear
39Phase I ? Pre-Abatement
- Survey
- Plan
- Design
- Background air sampling
40Phase II ? Abatement
- A. Pre-abatement enclosure construction
- B. Removals waste baggage w/ air Monitoring
project controls - C. Multiple cleaning sequences
41Phase III ? Clearance
- Extremely Clean
- Final Visual Inspection
- Final Air Clearance (indoors)
42DOL Project Exemption
- Owner Occupied
- Single Family House
- Work Performed by Owner
- Survey Contractor required for Demolition
43IV. Statutory Credentials
- A. Asbestos Contractor Licenses
- B. Asbestos Certificates
- C. Asbestos Project Notifications
44A. Asbestos Contractor License
- LL Article 30, Section 902
- Title 12 Part 56-2.1 ? 3.1, p20
- Business Registration
- Insurances workers comp, unemployment
- At least 1 Certified Supervisor
- Plus Certified Workers
45B. Asbestos Certifications
- LL Article 30, Section 902 56-2.2(b) ? 3.2, p22
- USEPA Equivalent Worker Training
- Model Accreditation state reciprocity
- Inspector- surveys
- Management Planner- response actions
- Project Designer- abatements
46Certs cont.
- Supervisor- watch control projects
- Handler- all abatements
- Operations Maintenance- minors
- Allied Trades- constructions or exposures
- Air Monitor- pumps cassettes
- Project Monitor- watch, assess, suggest
47C. Asbestos Project Notifications
- Licensed contractor
- Large Project (gt 160 square or 260 linear
footage) - Project fee (4,000 max)
- Schedule 200, 400, 1000, 2000
-
48V. Project OverSight
- A. Survey
- B. Air Monitoring
- C. Project Monitor
- D. Enforcement
49A. Survey
- AHERA- required for all schools
- ICR 56- required for structures built before 1974
- Agricultural condemned (structurally unsound)
buildings exempt - Licensed contractor w/ certified inspector
- Locations, type, conditions, amounts, fri?
50Surveys (cont.)
- Non-friable- 2 samples minimum
- Significant damage, damaged, good
- Homgenous areas- 3(lt1000 sqft), 5 (1000-5000
sqft), 9 (gt5000 sqft) for friables - Surfacing material, TSI, Miscellaneous
- Text to CEO, NYS
51B. Air Monitoring
- Licensed contractor w/ certified air monitoring
technician - Backgrounds (Pre-abatements) inside outside
work area - Finals same
- Daily decon units, 2 in building, 1 outside,
trap exhausts for large projects
52Airs (cont.)
- Minor Projects Finals (1 in /1 out) and for
Tent/Glovebag Breaches - Small Backgrounds, Pre-abatements, Final
Clearances (3 in/ 3 out) - Large (5 in / 5 out) plus Daily Environmentals
53Sample Analysis
- Air Phase Contrast Microscopy (PCM) or
Transmission Electron (TEM) - Bulk Polarized Light Microscopy (PLM) or TEM
- Cost versus Specificity (TEM)!
- Backgrounds- 0.10 fibres/millelitre, 70
structures /square millimetre
54C. Project Monitor
- Inspect for contractual regulatory compliance
- Owners agent limited from consultant to prorject
superintendent - Possible duties- air bulk sampling, site
inspections, final visual inspections
55D. Enforcement
- Government inspectors or officers
- DEC, DOL, DOH, OSHA, USEPA
- Statutory regulatory compliance
- Possible duties- air bulk sampling, site
inspections, final visual inspections - Legal adjudication w/ penalties
56VI. Project Abatement Basics
- A. Project Types
- B. Common Work Practices
- C. Project Size Dependencies
- D. Full Code Requirements
- E. Project Life Cycle Checks
57A. Project Types
- 56-1.4 (au), (bs), (aw)? 2.1(w). p9
- Large 160 Square or 260 Linear Feet
- Small 10 Square or 25 Linear
- Minor less than small
- To Differentiate Notification, Work Practices,
Air Monitoring
58B. Common Work Practices-
- Project Size Dependent
- Full Code General Requirements
- Special Projects In-Plant Operations
- Applicable Variances (AVs)
- Project Site Specific Variances
59C. Project Size Dependent
- Large Full Code w/ Daily Air Monitoring
- Small Full Code, Smaller Decon Unit
- Minor Tents or GloveBags w/no air monitoring
- Large small require final airs
60D. Full Code Requirements
- Personal Decontamination Unit
- Waste
- Harded Walled Openings
- Plasticized Walls, Floors, Ceilings, Objects,
Criticals - Relative Negative Air Pressure
- Most tedious costly
61 E. Project Life Cycle Checks
- Licensed Certified
- Scope- demolition vs. renovation
- Survey Plan
- Design or code
- Notifications? DOL, occupant
- Work Air Monitoring?
- Final Clearances
62VII. Common Abatement Methods
- A. Special Project Highlights
- B. Other New Changes
- C. Special Project Descriptions
63A. Special Projects Highlights
- Old AVs included in new ICR
- Tents for Non-friables and small friables
- Glovebags/tents for TSI
- No containments for outdoor projects
- Limited relief for demos- 1 plastic layer!
- Controlled demos
- Wrap Cut TSI in good shape
64B. Other New Changes
- Tents for OSHA Class 2, glove bag TSI, small
Class I projects (2 layer large) 7.11f - GC Supervision HazComm 1.4
- Renovation survey 5.1
- AV92- Overlays AV107 Demos gone
- Clearance by TEMs. 4.11
- NOBs now In-Plant Operations w/o airs
65 Related Information
- Owner must clean up disturbances! 1.5
- hire air project monitors.
4.3 - 1 2 Family owners are exempt from 9.1d project
monitor inspections (if outdoors?). - Some outdoor projects are exempt from final air
clearances (visual inspections). 9.2e - Manometers 7.8(a)(4) for NPEs
66 C. Special Projects 56-11
- In-Plant- NOBs?
- Emergencies Minor Clean-ups
- Minors- glovebags or tents?
- Pre-Demolition relief
- Controlled Demos like AV106
67Special Projects (cont.)
- 6. External NOBs roofs, windows, siding,
- 7. Non-friable flooring mastic- like AV120,
- 8. TSI Wrap Cut
68Changes to In-Plant
- NOBs only
- Galbestos transite deleted
- See Sub Section 6 for exterior projects
- Air monitoring may not be required outdoors
692. Emergencies Minor Clean-ups
- For ACM debris disturbances
- Incidental disturbance notification
- Tents decon unit required
- Final visual inspections airs required
70VIII. Variances
- A. Applicable Variances added to ICR
- B. Site Specific Variances by petition
- C. AV Archive method progressions
71A. Applicable Variances
- Routine Relief Cases from Full Code
- Limited or No Project Enclosures
- Relief from Sheeting/ Cleaning Sequence
- Include Outdoor Work, Special Methods
- Remote Decontamination Units
- Window Critical Barriers
72AVs General
- Buffer Areas
- Or Administrative Procedure Relief
- Some Outdated and Replaced earlier AV83 (Roof),
AV91 (GloveBags), AV93 (Certification), AV97
(Decons for In-Plant), AV100 (Demo) - Fix oversights, mistakes, etc.
73New AVs
- AV A-1 Controlled Demolition of Municipally-
Owned Vacant Residential Buildings/Structures Up
to 3 Stories in Height similar to AV107,
survey, no - friables, final airs
- AV A-2 Negative Air Ventilation Exhaust Greater
than 25 Foot in Length! 14 inch - ducts or booster fans
74New AVs (cont.)
- AV A-3 VAT Mastic Removal using Chemical
Methods Low Speed Buffers - 4 foot plastic splash guard (1 layer)
- AV-A-4 Removal or Cleanup of Intact VAT ?
minor size (10 sq.ft.), manual - methods, decon area, final visual
- inspection
75B. Site Specific Variance
- LL Article 2, Section 30
- Hardship with Full Code Compliance
- Alternate Work Proposal w/ Application
- For Equivalent Public Protection
- (e.g. Exotic Outdoors, Demolition, Complex,
Series of Partial Removals) - Practical Difficulties!
76C. AV Archive
- Evolution of ICR 56
- 2 Series of outdated procedures
- First set in late 80s
- Second set around late 90s?
- Incorporated in latest code revision special
projects - Help to craft site specific variances
77IX. Enforcement-
- Routine Notification Inspections
- LL Art.2, Sect.25 Power to Enter Inspect
- LL Art.2, Sect.26 Exam. of Books Papers
- LL Art.2, Sect.31 Duty to Furnish Information
and Facilitate Inspections - LL Art.2, Sect.32 Interference with Officer or
Employee of Dept. Prohibited
78IX. Enforcement (cont.)
- LL Art.30, Sect.907 Complaints Investigations-
jurisdiction - NOVs- resulting violations
- Art.30, Sect.908 Injunctions stop work
- Sect. 909 Civil Penalties Revocation-
Hearings Fines- administrative - Compliance Conferences- negotiate
79IX. Enforcement (cont.)
- Administrative- w/o hearing 1500 each for
- for license or certification, 2nd offense
- 2500 each, may now be higher?
- Civil Hearing- all other NOVs, up to 5000
- per or 25 of contract, up to 25000 per or
- 50 of contract 2nd time, whichever is
- higher
80X. Web Pages
- http//www.labor.state.ny.us or
http//www.labor.ny.gov - Worker Protection/DOSH
- Possible Links WorkPlace Safety, then
- LC, ACB, ESU, or ICRs
81Other Web Pages
- http//www.epa.gov
- - NARS, ACTS, NESHAP, AHERA
- National Asbestos Registry/ Asbestos Contractor
Tracking System - National Ombudsman to order books from USEPA
- http//www.osha.gov
82More Web Pages
- http//www.dec.ny.gov ? Permits Licenses,
Solid Hazardous Waste Management Permits in
Permits section - http//www.nyhealth.gov or
- http//health.state.ny.us ? Health safety in
home, Work place or outdoors then Health safety
indoors then Asbestos
83XI. Conclusion
- A. Talk Summary
- B. Project Check List
- C. Rationalization
- D. Final Visual Inspections
- E. Key Considerations
- F. Common Recommendations
- G. Related Information
84A. Talk Summary
- I. Asbestos Background
- II. Regulatory Jurisdictions
- III. General Project Life Cycle
- IV. Statutory Credentials
- V. Project Oversight
- VI. Project Abatement Basics
85Talk Summary (cont.)
- VII. Common Abatement Methods
- VIII. Variances
- IX. Enforcement
- X. Web Pages
- XI. Conclusion
86B. Project Check List
- License Certification
- Employee, Occupant, State Notifications
- Surveys or ACM Identified
- Final Visual Inspection
- Final Air Clearance- 0.1f/cc, 70 structures/
sq.mm - Written Contractor Release?
87C. Rationalization
- Various Health Considerations
- Work Practices Air Sampling to Abate Risk
- Outreach Awareness, then Enforcement,
Compliance if necessary! -
88D. Final Visual Inspection
- ASTM (American Society for Testing Materials)
Standard E1368 - Practice for Visual Inspection of Asbestos
Abatement Projects - By both supervisor consultant!
- Except single two family (no project monitor)!?
89E. Key Basic Considerations
- Renovation Notifications to USEPA except for
residential - No visible emissions w/ housekeeping
- Containerization of ACM
- Proper landfill disposal of friables
- Additional rules for schools (AHERA)
90F. Common Recommendations
- Controlled demos if possible
- Or site specific w/ friables survey
- Not full survey w/ selective abatement
- Possible problems w/ transite, windows, joint
compound? may become friable
91 G. Related Information
- Owner must clean up disturbances! 1.5
- hire air project monitors.
4.3 - 1 2 Family owners are exempt from 9.1d project
monitor inspections (if outdoors?). - Some outdoor projects are exempt from final air
clearances (visual inspections). 9.2e - Manometers 7.8(a)(4) for NPEs
92Common Abatement Types
- External non-friable removals (roofs, siding,
windows, etc.) - Controlled demolition
- Tent glovebag
- Wrap cut TSI lines
- NPEs- full or modified (e.g. flooring)
- Incidental disturbance clean up
93XII. Proposed ICR56 Revisions
- Timeframe was Summer 2012
- Fire Life Safety Issues many are firefighter
death related - Other Noteworthy Revisions corrections of old
technical problems - Anticipated Proposed AVs to Special Projects
SubPart
94Fire Life Safety Issues
- Required Means of Egress maintained marked,
e.g. halls, stairs, signs - Fire Protection Systems maintained , e.g.
alarms, standpipes, sprinkers, detectors - Structural elements not compromised, e.g. load
bearing - Pre-demolition building standpipes to work
95Fire Life Safety Issues cont.2
- Fire Ratings maintained, repaired, restored, or
replaced for non-demolitions - Pre-fire Plans given to CEO Fire Chief
- CEO Approvals Permits to be kept on site and
submitted to Fire Chief - Negative Air ShutOff Switch for projects gt 15000
sqft floor area
96Fire Life Safety Issues cont.3
- Fire Retardant (or non-combustible) Sheathing for
decons isolation barriers, 3/8 inch thickness
min. - Isolation Barrier Framing the same
- Alternate Work Area Exits, Emergency Lighting,
Fire Extinguishers (2-A or 40-BC) required - Notification Information about CEO review
97Other Noteworthy Revisions
- Variances require CEO certifications
- Transmittal of Project Certificate of Completion
(removed ACMs, signed statement, certification)
for work areas - Work Area Decks, Decons, Tunnels, Scaffolding
- Personal Hygiene Sections
98Other Noteworthy Revisions cont. 2
- Revised Demolition Definition to all building
system components - Minimum Air Sample Volume of 1200 L
- Clearance barriers pre-sample agitation
- Required On-Site Documents
- Cleanup Projects
99Anticipated Proposed AVs
- To be cited in Section 56-11.3
- Mechanical Fastening thru Non-friables
- Small Minor Disturbance Clean-Ups
- Buried Non-friable Piping
- Commercial Reusable Tents (Minors)
100Major CEO Points
- Always Licensed Contractors Certified People
- Survey or ID Friable Non-friable ACMs
- Notifications - Building, DOL, EPA
- Clearance Visual Inspection
- Written Assurance of Removal Performed for Work
Area Associated ACMs
101Contact
- NYS Dept. of Labor
- DOSH-ACB, Room 202
- 450 S. Salina St.
- Syracuse 13202
- (315) 479-3215
- www.labor.state.ny.us, labor.ny.gov, or
- alternativemodelingsolution.com