Mike Carey, Naval Center for Cost Analysis - PowerPoint PPT Presentation

1 / 8
About This Presentation
Title:

Mike Carey, Naval Center for Cost Analysis

Description:

O&S estimates developed for the following programs. CVN. Tactical Air Ship Study. Alternative Propulsion Study. Australian Frigate. MAMDJF AoA ... – PowerPoint PPT presentation

Number of Views:129
Avg rating:3.0/5.0
Slides: 9
Provided by: aado
Category:

less

Transcript and Presenter's Notes

Title: Mike Carey, Naval Center for Cost Analysis


1
Mike Carey, Naval Center for Cost Analysis Paul
Hardin, Technomics Inc.
2
Outline
  • Objective
  • Existing Models and Applications
  • Model Design (Phase 1)
  • CER Development
  • Inputs
  • Outputs
  • Model Enhancements (Phase 2)

3
Objective
  • Provide an Operating and Support Cost Estimating
    capability to the VAMOSC user community

4
Existing Models and Previous Applications
  • Leveraging VAMOSC VIEWS for ships, Technomics has
    developed OS cost estimating models for a
    variety of applications and customers
  • OS estimates developed for the following
    programs
  • CVN
  • Tactical Air Ship Study
  • Alternative Propulsion Study
  • Australian Frigate
  • MAMDJF AoA
  • LCS

5
Model Design (Phase 1) - CER Development
  • Leverage VAMOSC VIEWS data and concepts
  • Depending on cost element, develop personnel or
    weight-based CERs sensitive to
  • Age
  • Economies of scale
  • OPTEMPO
  • Develop Personnel and Fuel related estimating
    relationships that can be used when information
    is not available

6
Model Design (Phase 1) - Inputs
  • Required
  • Ship Type
  • Weight
  • Number of Ships
  • Ship Life (Years)
  • Optional (if unknown, model can provide
    estimates)
  • Personnel
  • SHU and SHNU
  • Fuel Consumption Underway and Not Underway
  • Fuel Price per Barrel

7
Model Design (Phase 1) - Outputs
  • Cost in FY07
  • Steady-State Average Annual Cost per Ship
  • Total Cost per Ship and Class
  • Annual Cost per Class - profiled over life of
    program
  • Risk / Sensitivity Analysis
  • Graphical and Tabular Displays showing estimates
    by percentiles
  • Derived from uncertainty distributions generated
    for each cost element based on the CER residuals
    (i.e., actual versus estimated data)

8
Model Enhancements (Phase 2)
  • Capability to provide estimates for Multiple Ship
    Classes, Quantities and Build Plans (i.e., Fleet
    Level Analysis and Trade-offs)
  • Provide costs in TY
Write a Comment
User Comments (0)
About PowerShow.com