Title: Planning: the Logframe and Annual Work Plans


1
Planning the Logframe and Annual Work Plans
Title of MSP..in the framework of the
UNDP-GEF Targeted Portfolio Project
  • Inception Workshop
  • Date ...
  • Country
  • Presenter

2
Logical Framework
  • The Project Logical Framework
  • UNDP-GEF uses the LF approach as a planning tool.
  • The LF is an effective tool for enabling
    stakeholders to prioritize problems, causes and
    barriers, identify solutions and define
    objectives and activities.
  • The LF allows testing the design of a project
    against its relevance, feasibility and
    sustainability.
  • The LF is a useful instrument when utilised in a
    flexible and adaptive way.

3
LOGICAL FRAMEWORK MATRIX
Impact Indicator Baseline Baseline Baseline Target Target Source of Verification Source of Verification Assumptions
Goal
Objective
Outcome 1
Outcome 2
Outcome 3
Output
Activities
4
Logical Framework
  • The Project Logical Framework
  • Prepared during the project design phase, the LF
    requires adaptation during the inception phase,
    according to changes in circumstances.
  • Changes occurred in this country since project
    design requiring adaptation of the project
    implementation strategy
  • ...
  • ...
  • ...

5
Logical Framework
  • The Project Logical Framework
  • Changes can be proposed without major
    difficulties to inputs, activities and outputs.
  • Changes to outcomes and objectives require high
    level GEF approval and undergo a more complex
    approval procedure

6
Global and Annual Work Plan
  • Global and Annual Work Plan
  • Other planning instruments are
  • A detailed Operational Work Plan and Budget for
    the entire project period
  • Annual Work Plans
  • These documents are prepared during the
    preparatory phase and reviewed during the IW.

7
Operational Work Plan
  • Operational Work Plan
  • It is an important long-term strategic planning
    tool.
  • It is a flexible document that will be adjusted
    as execution proceeds, and in particular at the
    time of formulation of the annual work plans.
  • A budget is prepared for the entire period of the
    project.

8
Annual Work Plan
  • Annual Work Plan
  • It is the annual planning tool
  • A draft is prepared before the Inception Workshop
  • During the IW, it is updated to reflect changes
    to be done to the logframe
  • It requires to be completed with deadlines and
    achievable milestones
  • It requires identification of key actions with
    clear schedules
  • It assigns responsibilities for each task
  • It provides sufficient flexibility to adjust to
    changes in conditions
  • It has an associated year budget.

9
Participatory planning
  • Stakeholders Involvement, Partnership and
    Coordination
  • Planning and ME are participatory tasks
  • Which are the various partners the project is
    working with?
  • What are the interests of these partners? What
    incentives should the project use for various
    partners engagement?
  • What the roles/engagement of these partners
    should be for achieving project outcomes?
  • What are the coordination/communication
    mechanisms to set up and maintain the
    partnerships?

10
Participatory Planning
  • Stakeholders Involvement, Partnership and
    Coordination
  • Government institutions
  • NGOs and community based groups
  • Private sector
  • Research and Science institutes

11
Participatory Planning
  • Stakeholders Involvement, Partnership and
    Coordination
  • Community involvement and participation
  • What different types of community groups exist in
    the project area?
  • Which groups are most important to involve in the
    project? Why?
  • What conservation and other incentives should be
    built in the project to ensure their
    participation?
  • What is the best way to engage these groups in
    each outcome?
  • What are the consultation mechanism the project
    should install?

12
Planning tools
  • Distribution of documents
  • MSP Logframe
  • Detailed Operational Work Plan (draft)
  • Annual Work Plan (draft)

13
Planning tools
  • References
  • - Introduction to the Logical Framework Approach
    (LFA) for GEF-financed project, DSE
  • - Brochure describing the inter-linkages between
    the SLM MSP and the NAP process, UNDP-GSU, April
    2006 (available both in English and French)
  • - Case Studies on integrating environmental
    issues into development frameworks
    (mainstreaming)
  • - Manual for Capacity Development for
    Sustainable Land Management (available in English
    and French), UNDP-GSU, Nov. 2007
  • - Guidelines for the Mainstreaming of SLM (under
    preparation, in collaboration between GSU and
    UNDP-DDC)

14
Planning tools
  • Thank you