Connection Details for Prefabricated Bridge Elements and Systems - PowerPoint PPT Presentation

1 / 23
About This Presentation
Title:

Connection Details for Prefabricated Bridge Elements and Systems

Description:

... Depth Deck Forms Total Bridge Element Prefabrication Total Bridge Element Prefabrication Complete Bridge Element Prefabrication Examples: ... – PowerPoint PPT presentation

Number of Views:1275
Avg rating:3.0/5.0
Slides: 24
Provided by: sju7
Category:

less

Transcript and Presenter's Notes

Title: Connection Details for Prefabricated Bridge Elements and Systems


1
Connection Details for Prefabricated Bridge
Elements and Systems
Michael P. Culmo, P.E. Vice President of
Transportation and Structures CME Associates,
Inc., East Hartford, CT
2
Roadblocks to Accelerated Construction
  • The primary concerns that owner agencies have
    with respect to adopting accelerated construction
    techniques are
  • Need for Quality Details
  • Durability
  • Design Methodologies and Training
  • Construction Methodologies

3
Connections Details for Prefabricated Bridge
Elements and Systems
  • FHWA has initiated a project to develop this
    manual
  • This publication is intended to provide
    information that will go a long way to answering
    all four of the previous concerns.
  • Focus on details that have been used in the past.

4
Project Goals
Connection Details for Prefabricated Bridge
Elements and Systems
  • Gather details of Connections that have been used
    on accelerated bridge construction projects
  • Investigate transfer of technology from other
    markets into the bridge market
  • Parking Garages
  • Stadiums
  • Buildings

5
  • All details needs to pass a critical test
    before being published in the document
  • Does the connection result in a rapid
    construction process?
  • Does the connection transmit the forces between
    elements effectively?
  • Is the connection durable?
  • Has it performed well under traffic and in an
    exposed environment?
  • Is it cost effective and easy to construct?
  • If a process or connection is proprietary, can it
    be incorporated into numerous projects without
    producing contracting issues?

6
Sources of Data
  • State DOTs
  • Questionnaires sent via e-mail
  • Federal Agencies
  • International Organizations
  • Researchers (previous and current)
  • Producers
  • Questionnaires sent via e-mail

7
Manual Organization
8
Connection Data Sheets
9
Precast Cantilever Abutments
10
Precast Integral Abutments
11
Precast Piers
12
Precast Piers
13
Precast Decks on PS Beams
14
Precast Decks on Steel Framing
15
Precast Decks
16
FRP Decks
17
Partial Depth Deck Forms
18
Total Bridge Element Prefabrication
Everything shown can be prefabricated
19
Total Bridge Element Prefabrication
Everything shown can be prefabricated
20
Complete Bridge Element Prefabrication
  • New Hampshire Project
  • How fast can we build a bridge?
  • Experimental project
  • All components prefabricated
  • 115 foot span
  • Precast cantilever abutments
  • Clock started after old bridge was removed
  • Roadway open to traffic in 8 days
  • Time Lapse Video on YoutubeTM
  • Search Epping Bridge Construction

21
Examples Epping NH
Epping Bridge Construction
22
Manual Distribution
  • Availability
  • Published June 2009
  • DOTs will receive copies
  • Others will be given out at conferences
  • Website being developed
  • Is available through Local FHWA offices
  • www.fhwa.dot.gov/hfl/

23
Questions
  • culmo_at_cmeengineering.com