Title: New River Gorge Bridge
1New River Gorge Bridge
2Presenters
- Shaun Long Michael Baker Jr. Inc.
Bridge Engineer - Josh Derechin Michael Baker Jr. Inc.
Senior Technical Manager - Jimmy Wriston West Virginia DOT
3Crossing the Gorge
- Fayette Station Road
- Built in 1909, Only way to cross the gorge
- Corridor L, US19, began in 1960
Tunney Hunsacker Bridge
4Crossing the Gorge
- Turn a 45 minute trip into 45 seconds
- Making the impossible a reality
- new transportation and new life blood John
D. Rockefeller, IV
5- Bridge was immortalized by US Mint
6New River Gorge Bridge
- Design
- Construction
- Inspection
- Tourism
7New River Gorge Bridge
- Design
- Construction
- Inspection
- Tourism
8Design
- Bridge Types Considered
- Arch Bridge (Top)
- Suspension Bridge (Bottom)
- Deck Truss
-
9Design
- Manhours for design were equivalent of one man
working 40 hours per week for 15 years - Design calculation sheets totaled 4,759
- Baker engineers checked approximately 1,490 shop
drawings - Baker engineers analyzed 75 erection procedures
and 1,200 sheets of accompanying calculations
10Design Features
- COR-TEN Steel
- High-Strength
- Aesthetic Beauty
- Lowe Maintenance
11Bridge Statistics Record Setting
- Upon opening, it was the second highest highway
bridge in the world. - Royal Gorge Bridge in Colorado built in 1929
- Record currently held by Siduhe River Bridge,
China. 1627 ft
12Bridge Statistics Record Setting
- Upon opening, it was the longest Arch Bridge in
the world. - 2003 Lupu Bridge in China broke record
13Bridge Statistics Arch Length
Chaotianmen Bridge 1,811 Ft. 2009 China
Lupu Bridge 1,804 Ft. 2003 China
Bosideng Bridge 1,739 Ft. 2012 China
New River Gorge Bridge 1,700 Ft. 1977 U.S.
Bayonne Bridge 1,673 Ft. 1931 U.S.
14Bridge Statistics Arch Height
Zhijinghe River Bridge 1,410 Ft. 2009 China
Beipanjiang River Railway Bridge 774 Ft. 2001 China
Mike OCallaghan Pat Tillman Memorial Bridge 886 Ft. 2010 U.S.
New River Gorge Bridge 876 Ft. 1977 U.S.
15Bridge Statistics Arch Height
16Bridge Statistics
- 34 Million Pounds of Structural Steel Equivalent
to 120 Boeing 747s 7,555 Full Size Pick
Ups
17New River Gorge Bridge
- Design
- Construction
- Inspection
- Tourism
18Construction
- WVDOH awarded a contract to U.S. Steel for the
construction of the bridge - June 21, 1973 Bid Results
- 33,984,012 - U.S. Steel
- 41,116,118 - Allied Structural Steel, Inland
Ryerson Construction Products - 46,383,282 Bethlehem Steel Corp.
- 52,496,017 Bristol Steel, Iron Works Inc.
Most expensive project awarded by WVDOH at the
time
2013 cost of bridge 173 million
19Construction
- Uniquely Designed Cableway
20Construction
- Uniquely Designed Cableway
21Construction
- Uniquely Designed Cableway
22Construction
23Construction
24Opening
- Opened October 22, 1977
- Representing Mans ability to challenge and
overcome natures barriers
25New River Gorge Bridge
- Design
- Construction
- Inspection
- Tourism
26New River Gorge Bridge
- Design
- Construction
- Inspection
- Tourism
27Tourism
- Foresight to add Visitors center during
construction
28Tourism
- Bridge Day Third Saturday in October
29Tourism