Title: PORT REQUIREMENTS FEES
1PORT REQUIREMENTS FEES CHARGES
2Presenter Nabeel AliOperations Manager FPTL
- Experience Agency / Liner (HMM/HLL/RCL)Freight
Forwarding and Heavy Lifts / BBPorts (Transnet
National Ports S.A / CMHI)Hyundai Engineering
Constructions
3Lets look at,
- Port Requirements
- Modern port equipment
- What do we have
- What have we done to improve our standards
- What we require
- Volumes and Achievements
- Increase of domestic transshipments volumes
- Increasing of the hourly crane productivity and
average gross ship rate - Reducing vessel berth waiting time ship
turnaround time - Reducing average truck turnaround time
- Fees Charges
- Container fees charges
- Conventional cargo fees charges
- Other cargo related fees charges
- Terminal Handling Charges (THC)
4Ports requirements
5Modern port equipment
Quay cranesPanamax - Ships of 13 containers
wide Post-Panamax - Ships of 18 containers wide
Super Post-Panamax - Ships of 22 or more
containers wide
- Spreaders attached.
- Single lift
- Twin lift (Lifts 2X20FT containers)
- Tandem (Lifts 2X40FT containers)
- Yard equipment
- Straddle carrier
- RTG
- RMG
6What do we have
7- Introducing defined port tariff
- Elimination of unregulated indirect charges
- Transformation of port to a 24/7 facility
- Quality and efficient service
- One stop service centre
- New policies to simplify the procedure
- Reduction of customer disputes and complaints
- Efficient and prompt invoicing
8What have we done to improve our standards
- Terminal Operating System
- Yard planning system with graphical views.
- Ship planning module
- EDI facilities CODECO gate in/out reports.
- New equipment - 6 New terminal tractors coupled
with drop deck trailers - received July this year.
9What are our requirements
- Infrastructure and equipment
- Sufficient quay length with required depths
- Dedicated berths for cargo vessels
- Sufficient space to have a well planned yard
facility - Modern quay and yard equipment
- Weighbridge facilities
- Skill knowhow
- Major stakeholders to have a fair knowledge of
the port activities - Stakeholder willingness to adopt new technology
- Skilled labour
- Technical support services within Fiji
10 11Volumes Achievements Domestic and
Transshipments
Note Volumes include Laden Empty IN/OUT
movements
12- Hourly Crane Productivity Average Gross Ship
Rate
- Figure 01 Hourly crane productivity
- Figure 02 Average Gross Ship rate
13- Vessel berth waiting time Ships turnaround time
- Figure 04 Ship turnaround time
- Figure 03 Vessel berth Waiting time
14 Average Truck Turnaround Time
- As per the chart
- Showcase the time taken for an importer
or an exporter to deliver or receive their
container to / from the port. The truck movement
is calculated from the time it enters the port
and the time it booked out from port gate - In 2013 the average truck turnaround time was
1.5 hours which reduced to less than 20 minutes
in 2015
15Fees Charges
16Container fees and charges Based on the
previous tariff / FJ()
Fees charges Weekdays Weekdays Weekends Weekends Public Holidays Public Holidays
Container size 20FT 40FT 20FT 40FT 20FT 40FT
Container size Laden Laden Laden Laden Laden Laden
Stevedoring 90.00 135.00 135.00 202.50 180.00 270.00
Handling charges 22.00 44.00 22.00 44.00 22.00 44.00
- Notes- The previous tariff allowed ports to
charge time and a half during the weekends
and double time during the public holidays,
of the base rates. - Undefined charges
- Many hidden charges, such as overtime, meal
money, transport allowances, etc. - The aforementioned fees charges, discouraged
the stakeholders to use the port services during
afterhours, weekends holidays.
17Container fees and charges - Based on the revised
tariff / FJ()
Fees charges Weekdays Weekdays Weekends Weekends Public Holidays Public Holidays
Container size 20FT 40FT 20FT 40FT 20FT 40FT
Container size Laden Laden Laden Laden Laden Laden
Stevedoring 150.00 225.00 150.00 225.00 150.00 225.00
Handling charges 30.00 60.00 30.00 60.00 30.00 60.00
Newly introduced fees charges- Based on the
revised tariff / FJ()
Fees charges Weekdays Weekdays Weekends Weekends Public Holidays Public Holidays
Container size 20FT 40FT 20FT 40FT 20FT 40FT
Container size Laden Laden Laden Laden Laden Laden
OOG Cargoes 250.00 500.00 250.00 500.00 250.00 500.00
18- Notes
- - No hidden charges
- No additional charges for afterhours, weekends
and holidays - Defined fees charges
- Stakeholders will be able do a firm costing of
the ports fees and charges during the planning
stages of their shipments
19 Conventional cargo fees charges Based on the
previous tariff - FJ()
Commodity Weekdays Weekends Public Holidays
Bulk 5.375 / T 8.062 / T 10.75 / T
Break bulk 16.25 / T 24.375 / T 32.50 / T
Light vehicles (RORO) 25.00 / U 37.50 / U 50.00 / U
Light vehicles (LOLO) 30.00 / U 45.00 / U 60.00 / U
Steel products 12.90 / T 19.35 / T 25.80 / T
Timber or Master Packs 73.10 / T 109.65 / T 146.20 / T
T- per Tonnage or CBM U- per Unit
20Conventional cargo fees charges Based on the
revised tariff / FJ()
Commodity Weekdays Weekends Public Holidays
Bulk 5.375 / T 5.375 / T 5.375 / T
Break bulk 16.25 / T 16.25 / T 16.25 / T
Light vehicles (RORO) 50.00 / U 50.00 / U 50.00 / U
Steel products 12.90 / T 12.90 / T 12.90 / T
Timber or Master Packs 73.10 / U 73.10 / U 73.10 / U
Earth moving machines with typres 100.00 / U 100.00 / U 100.00 / U
Earth moving machines with tracks 200.00 / U 200.00 / U 200.00 / U
General cargo- less than 30m3 100.00 / T 100.00 / T 100.00 / T
General cargo- 30m3 to 100m3 250.00 / T 250.00 / T 250.00 / T
21Other charges Based on the revised tariff /
FJ()
Item 20FT 40FT
Stuffing / De-stuffing 104.65 136.50
Reefer electricity (per day) 80.00 160.00
Wharfage Based on the revised tariff / Charged
by FPCL / FJ()
Item 20FT 40FT
Wharfage 70.00 98.00
- Note -
- A charge based on tonnage or per container to
defray the costs associated with repair - and maintenance of wharf structures and
cargo handling areas. This charge is levied 65 - against the ship and 35 against the cargo
consignee.
Source FCC approved port tariff
-
22Terminal Handling Charges (THC) payable by any
Exporter or Importer
Cost item 20FT Container 40FT Container Remarks
Stevedoring 150.00 225.00 No additional or hidden charges
Handling 30.00 60.00 No additional or hidden charges
Wharfage 24.50 34.30 35 of the total wharfage
Total THC 204.00 319.30
- Note -
- The Handling fee , ( 30 per 20FT 60 per
40FT container) is a direct payment made by the
importers and exporters to Fiji Ports Terminal
Limited for delivering of their import containers
and for receiving of their export containers.
23- Vinaka vaka levu
- Thank you