PRT%20MeS%20Evaluation - PowerPoint PPT Presentation

About This Presentation
Title:

PRT%20MeS%20Evaluation

Description:

PRT MeS Evaluation CPPB Workshop Outline Background Purpose of evaluation Evaluation approach Findings Plans & concepts National directions for PRT Are we doing the ... – PowerPoint PPT presentation

Number of Views:106
Avg rating:3.0/5.0
Slides: 14
Provided by: janf61
Learn more at: https://www.oecd.org
Category:

less

Transcript and Presenter's Notes

Title: PRT%20MeS%20Evaluation


1
PRT MeS Evaluation
  • CPPB Workshop

2
Outline
  • Background
  • Purpose of evaluation
  • Evaluation approach
  • Findings
  • Plans concepts
  • National directions for PRT
  • Are we doing the right things/Desirable effects
  • Unintended effects
  • Recommendations (to SwAF)
  • Using CPPB Guidelines
  • Questions

3
1. Background
  • The Provincial Reconstruction Teams were
    introduced in Afghanistan in 2002
  • Extend Afghan Government authority
  • Provide a light footprint
  • Avoid occupation
  • Sweden has been framework nation for PRT MeS
    since 2006

4
2. Purpose of Evaluation
  • SwAF
  • The Swedish Defence Research Agency (FOI)
  • Jun 2009 Feb 2010
  • Formative evaluation
  • Learning focus
  • Questions
  • Is the current direction guidance for the PRT
    relevant?
  • Is the PRT doing the right things?
  • Which unintentional effect has the PRT had?
  • Which intended or desirable effects has the PRT
    not achieved?

5
3. Evaluation Approach
  • Evaluation design and baseline establishment
    (Jun-Oct 2009)
  • Conflict analysis,
  • Theory of change
  • Develop questions
  • Evaluation execution (Nov 2009)
  • Final report and advice on implementation (Dec
    2009 Feb 2010)

6
4. Findings - Concepts
  • The COIN-doctrine (US) a well thought-out
    approach
  • The PRT concept is heterogeneous and has
    contributed to fragmentization
  • Civil-military coordination needs to be focused
  • Parallel structures
  • Essential needs

7
4. Findings - PRT National directions
  • National C2
  • PRT design
  • Large freedom large responsibility
  • Controlling factors
  • Taliban forces
  • ISAF
  • ANSF
  • Lessons learned
  • The process of DG

8
4. Findings - The right things/Desirable effects
  • Tactical mobility a constraint
  • Security for the population is relatively good in
    the MeS area
  • Rule of law completely missing
  • Not a military task, but will affect mission
  • Corruption a huge obstacle
  • ANA has made progress (autumn 2009)
  • ANP are still facing huge challenges
  • -gt Conclusion Sweden has focused Security line
    of operation. This is insufficient for a PRT

9
4. Findings - Unintended effects
  • Heterogeneous PRT-concept
  • Unfulfilled expectations
  • Weak CIMIC
  • Strong army in a weak country Pakistanisation
  • Distance from population
  • Disadvantaged population groups

10
5. Recommendations (to SwAF)
  • Revise PRT direction
  • Improve national C2
  • Train COIN at the conceptual level
  • Addressing essential needs
  • CIMIC
  • Dont ask for needs you cannot satisfy
  • Mission tactics for Force Protection
  • Improve Mobility

11
6. Using the CPPB Guidelines
  • Is the PRT a CPPB?
  • Conflict Analysis
  • We made our own
  • Crucial step in any CPPB evaluation
  • Theory of change
  • Made us focus on plans, concepts and doctrine
  • Shaped the evaluation

12
6. Using the CPPB Guidelines
  • Criteria
  • Relevance
  • Sustainability
  • Impact
  • Coherence
  • Coverage
  • Detailed descriptions useful
  • Linkages and consistency with values less well
    developed

13
7. Questions
Write a Comment
User Comments (0)
About PowerShow.com