ENGM 720 - Lecture 07 - PowerPoint PPT Presentation

About This Presentation
Title:

ENGM 720 - Lecture 07

Description:

Title: TM 720 Lecture 07: Cont. Variable Charts, ARL & OC Author: D.H. Jensen Last modified by: Jensen, Dean H. Created Date: 9/30/2002 2:47:20 PM – PowerPoint PPT presentation

Number of Views:162
Avg rating:3.0/5.0
Slides: 47
Provided by: DH71
Learn more at: http://jensen.sdsmt.edu
Category:
Tags: engm | fourteen | lecture | steps

less

Transcript and Presenter's Notes

Title: ENGM 720 - Lecture 07


1
ENGM 720 - Lecture 07
  • X-bar, R, S Control Charts
  • ARL OC Curves

2
Assignment
  • Reading
  • Chapter 5
  • Start Finish reading
  • Chapter 6
  • Spring Break means reading statistics on the
    beach, right?
  • Assignments
  • Obtain the draft Ctrl Chart Factors table from
    Materials Page
  • Access Excel Template for X-bar, R, S Control
    Charts
  • Download Assignment 5 for practice
  • Use the Excel sheet to do the charting, and
    verify your hand calculations

3
Process for Statistical Control Of Quality
  • Removing special causes of variation
  • Hypothesis Tests
  • Ishikawas Tools
  • Managing the process with control charts
  • Process Improvement
  • Process Stabilization
  • Confidence in When to Act

4
Moving from Hypothesis Testing to Control Charts
  • A control chart is like a sideways hypothesis
    test
  • Detects a shift in the process
  • Heads-off costly errors by detecting trends

5
Test of Hypothesis
  • A statistical hypothesis is a statement about the
    value of a parameter from a probability
    distribution.
  • Ex. Test of Hypothesis on the Mean
  • Say that a process is in-control if its mean is
    m0.
  • In a test of hypothesis, use a sample of data
    from the process to see if it has a mean of m0 .
  • Formally stated
  • H0 m m0 (Process is in-control)
  • HA m ? m0 (Process is out-of-control)

6
Test of Hypothesis on Mean (Variance Known)
  • State the Hypothesis
  • H0 m m0
  • H1 m ? m0
  • Take random sample from process and compute
    appropriate test statistic
  • Pick a Type I Error level (a) and find the
    critical value za/2
  • Reject H0 if z0 gt za/2

7
UCL and LCL are Equivalent to the Test of
Hypothesis
  • Reject H0 if
  • Case 1
  • Case 2
  • For 3-sigma limits za/2 3

8
Two Types of Errors May Occur When Testing a
Hypothesis
  • Type I Error - a
  • Reject H0 when we shouldn't
  • Analogous to false alarm on control chart, i.e.,
  • point lays outside control limits but process is
    truly in-control
  • Type II Error - b
  • Fail to reject H0 when we should
  • Analogous to insensitivity of control chart to
    problems, i.e.,
  • point does not lay outside control limits but
    process is never-the-less out-of-control

9
Choice of Control LimitsTrade-off Between Wide
or Narrow Control Limits
  • Moving limits further from the center line
  • Decreases risk of false alarm, BUT increases risk
    of insensitivity
  • Moving limits closer to the center line
  • Decreases risk of insensitivity, BUT increases
    risk of false alarm

10
Consequences of Incorrect Control Limits
  • Bad Thing 1
  • A control chart that never finds anything wrong
    with the process, but the process produces bad
    product
  • Bad Thing 2
  • Too many false alarms destroy the operating
    personnels confidence in the control chart, and
    they stop using it

11
Differences in Viewpoint Between Test of
Hypothesis Control Charts
Hypothesis Test Control Chart
Checks for the validity of assumptions. (ex. is the actual process mean what we think it is?) Detect departures from assumed state of statistical control
Tests for sustained shift (ex. have we actually reduced the variation like we think we have?) Detects shifts that are short-lived Detects steady drifts Detects trends
12
Example Part Dimension
  • When a process is in-control, a dimension is
    normally distributed with mean 30 and std dev 1.
    Sample size is 5. Find the control limits for an
    x-bar chart with a false alarm rate of 0.0027.
  • r.v. x - dimension of part
  • r.v. x - sample mean dimension of part

13
Distribution of x vs. Distribution of x
14
Ex. Part DimensionCont'd
  • Find UCL
  • The control limits are

15
Ex. Modified Part Limits
  • Consider an in-control process. A process
    measurement has mean 30 and std dev 1 and n 5.
  • Design a control chart with prob. of false alarm
    0.005
  • If the control limits are not 3-Sigma, they are
    called
  • "probability limits".

16
General ModelShewhart Control Chart
  • Suppose x is some quality characteristic, and w
    is a sample statistic of x.
  • Suppose mean of w is µw and std dev of w is sw,
    then
  • UCL µ w Lsw
  • CL µ w
  • LCL µ w Lsw
  • where L is the distance of the control limits
    from the center line, and expressed in multiples
    (units) of the standard deviation of the
    statistic, i.e. sw.
  • This type of chart is called a Shewhart Control
    Chart

17
Rational Subgroups
  • Subgroups / Samples should be selected so that if
    assignable causes are present
  • Chance for differences between samples is
    maximized
  • Chance for differences within a sample is
    minimized
  • Use consecutive units of production
  • Keep sample size small so that
  • New events wont occur during sampling
  • Inspection is not too expensive
  • But size is large enough that x is normally
    distributed

18
Why Monitor Both Process Mean and Process
Variability?
Process Over Time
Control Charts
19
Teminology
  • Causes of Variation
  • Assignable / Special Causes
  • Keep the process from operating predictably
  • Things that we can do something about
  • Common / Chance Causes
  • Random, inherent variation in the process
  • Meaning of Control
  • In Specification
  • Meets customer constraints on product
  • In Statistical Control
  • No Assignable Causes of variation present in the
    process

20
Statistical Basis of x Chart
  • Suppose a quality characteristic is x N(m, s)
  • and we know m and s
  • If x1, x2, , xn is a random sample of size n
    thenand
  • Recall that the probability is ? that either
    or

21
Statistical Basis of x ChartCont'd
  • which is equivalent to
  • Where LCL and UCL are the lower and upper
    control limits, respectively
  • In practice, one must estimate m and s from data
    coming from an in-control process

22
Statistics of the Range
  • R the range is a sample statistic
  • If x1, x2, , xn is a random sample of size n
    from a normal distribution then one can estimate
    ? using the range
  • where d2 is a function of n and can be found in
    Appendix VI
  • Can get a better estimate for ? if using more
    than one sample
  • Compute Ri for each of m samples where i 1, ,
    m
  • Then use the sample average of Ri

23
Computing Trial Control Limits for x Chart
  • Assume a quality characteristic x N(m, s)
  • Take m ? 20 samples of size n 4, 5, or 6
  • For each sample i, compute x and Ri for i 1, ,
    m
  • Compute x and R

24
Computing Trial Control Limits for x Chart
  • General model for x chart
  • Substituting estimates for µx and s x and using
    3-sigma limits
  • Where A2 comes from Appendix VI and depends on n

25
Computing Trial Control Limits for R - Chart
  • x and R charts come as a pair
  • General model for R chart
  • Substituting estimates for mR and sR and using
    3-sigma limits

26
Computing Trial Control Limits for R - Chart
(continued)
  • where and
  • D3 and D4 are tabulated in Appendix VI and depend
    on n
  • NOTE R chart is quite sensitive to departures
    from normality

27
Control Chart Factors Table (Appendix VI see
Materials Page for Engineering Notebook Copy)
  • For a constant sample size (n) and 3s limits
  • Table factors derived from Montgomery,D.C.,
    (2005) Statistical Quality Control, 5th Ed.

28
Trial Control Chart LimitsGuidelines for
Sampling
  • Sample should be of size 3 to 8
  • (sizes 4 6 are more common)
  • Sample must be homogeneous
  • same time (consecutive units)
  • same raw materials
  • same operator
  • same machine
  • Time may pass between samples but not within
    samples

29
Steps for Trial Control Limits
  • Start with 20 to 25 samples
  • Use all data to calculate initial control limits
  • Plot each sample in time-order on chart.
  • Check for out of control sample points
  • If one (or more) found, then
  • Investigate the process
  • Remove the special cause and
  • Remove the special cause point and recalculate
    control limits.
  • If cant find special cause - drop point
    recalculate anyway

30
Control Chart Sensitizing Rules
  • Western Electric Rules
  • One point plots outside the three-sigma limits
  • Eight consecutive points plot on one side of the
    center line
  • Two out of three consecutive points plot beyond
    two-sigma warning limits on the same side of the
    center line or
  • Four out of five consecutive points plot beyond
    one-sigma warning limits on the same side of the
    center line.
  • If chart shows lack of control, investigate for
    special cause

31
Control Chart Examples
32
Control Chart Sensitizing Rules
  • Additional Sensitizing Rules
  • One or more points very near a control limit.
  • Six points in a row steadily increasing or
    decreasing.
  • Eight points in a row on both sides of the center
    line, but none in-between the one-sigma warning
    limits on both sides of the center line.
  • Fourteen points in a row alternating above and
    below the center line.
  • Fifteen points in a row anywhere between the
    one-sigma warning limits (including either side
    of the center line).
  • Any unusual or non-random pattern to the plotted
    points.

33
Charts Based on Standard Values, x Chart
  • If values for m and s are known (i.e., do not
    need to estimate from data)
  • Quantity A is tabulated in Appendix VI

34
R - Chart Based on Standard Values
  • If values for R and s are known
  • We define a random variable W R / s called
    the relative range
  • The parameters of the distribution of W are a
    function of sample size (n)
  • From the relative range we can compute the mean
    of R

35
The Standard Deviation of R
  • The standard deviation of R is given as (Text
    does not derive this)
  • therefore
  • where
  • D1 and D2 are constants tabulated in Appendix VI
  • Caution Be careful when using standard values
  • make sure these values are representative of the
    actual process

36
X-Bar R-Charts
  • The X-Bar Chart checks variability in location
    between samples
  • The R-Chart checks for changes in sample variation

37
X-Bar Sigma-Charts
  • Used when sample size is greater than 10
  • Sigma-Chart Control Limits
  • Approximate, asymmetric 3? limits from S table
  • X-Bar Control Limits
  • Approximate 3? limits are found from S table

38
X-Bar Sigma-Charts
  • Limits can also be generated from historical data
  • Sigma-Chart Control Limits
  • Approximate, asymmetric 3? limits from ?0 table
  • X-Bar Control Limits
  • Approximate 3? limits are found from known ?0
    table

39
Operating Characteristic (OC) Curve
  • Ability of the x and R charts to detect shifts
    (sensitivity) is described by OC curves
  • For x chart say we know s
  • Mean shifts fromm0 (in-control
    value) to m1 m0 ks (out-of-control value)
  • The probability of NOT detecting the shift on the
    first sample after shift is

40
OC Curve for x Chart
  • Plot of b vs. shift size (in std dev units) for
    various sample sizes n
  • x chart not effective for small shift sizes,
    i.e., k ? 1.5s
  • Performance gets better for larger n and larger
    shifts (k)

41
OC curve for R Chart
  • Uses distribution of relative range r.v., i.e.,
  • Suppose
  • s0 - in-control std dev
  • s1 - out-of-control std dev
  • OC curve for R chart plots b vs. ratio of
    in-control to out-of-control standard deviation
    for various sample sizes
  • That is, plot ß vs. l s1/s0
  • R chart not very effective for detecting shifts
    for small sample sizes (see Fig. 5-14 in fifth
    edition of the text)

(we wont plot that here, but )
42
Probability of Detecting Shift for Subsequent
Samples
  • After the shift has occurred
  • P(NOT detecting shift ON 1st sample)
  • P(DETECTING shift ON 1st sample)
  • P(DETECTING shift ON 2nd sample)
  • P(DETECTING shift ON rth sample)
  • P(DETECTING shift BY 2nd sample)
  • P(DETECTING shift BY rth sample)

43
Average Run Length (ARL)
  • Expected number of samples taken before shift is
    detected is called the Average Run Length (ARL)

44
Performance of Any Shewhart Control Chart
  • In-Control ARL
  • Average number of points plotted on control chart
    before a false alarm occurs(ideally, should be
    large)
  • Out-of-Control ARL
  • Average number of points, after the process goes
    out-of-control, before the control chart detects
    it(ideally, should be small)

45
ARL Curve for x Chart
  • Plot of ARL1 vs. shift size (in sd units) for
    various sample sizes n
  • Average Time to Signal, (ATS)
  • Number of time periods that occur until signal is
    generated on control chart
  • h - time interval between samples

46
Questions Issues
Write a Comment
User Comments (0)
About PowerShow.com