Title: Some General Guidelines for the US TBM Costing


1
Some General Guidelines for the US TBM Costing
  • Cost for the Reference Case
  • Cost is for the period between now and the
    shipment of the TBM deliverables (Test articles
    and ancillary equipment) in 2015 for DAY ONE ITER
    operation. The period is 10 years from 2006 to
    2015
  • The cost is the total cost for the TBM project
    (based on the Reference designs/deliverables)
    including RD, design, engineering, fabrication,
    qualification, etc., as well as the cost of
    interface with ITER and other parties.
  • The deliverables are based on the Reference
    Designs described in the Design Summary
    Documents.
  • The DCLL Reference Case has a PbLi exit
    temperature of 470ºC and a test module that
    occupies half a port.
  • For the HCCB submodule that has a size of 1/3 of
    one-half port and uses the EU (or Japan) first
    wall/box (first wall/box is not part of the US
    deliverables)
  • The RD Cost includes all costs related to the
    reference design that occur within the next 10
    year period whether they are related to the first
    (Day ONE) Test Articles or subsequent test
    articles. But the Cost of the deliverables
    includes only the cost of the First Test Article
    and associated equipment.
  • The US effort should take advantage of the RD
    efforts in other parties.
  • RD performed by other parties and available to
    the US should, in general, not be duplicated by
    the US and should not be included in the US TBM
    cost.
  • Cost estimates should state clearly what RD done
    by the other parties is essential to the US TBM
    project.

2
Base Program RD Cost for High Performance Case
  • In addition to the Reference TBM, it is
    recommended that the US carry out a base program
    RD on High performance DCLL (PbLi exit
    temperature 650ºC).
  • If development of high temperature SiC for power
    plants is available around 2015-2020, a higher
    performance TBM can be considered for later
    stages of ITER testing.
  • After the Costing of the TBM Reference Strategy
    is completed, it is recommended that the cost of
    the RD for the high performance case be
    estimated.
  • Such cost will be identified separately from the
    Reference TBM cost