Title: J-1


1
Next Steps
  • Jordan Dentz

2
Assignments
  1. Establish core continuous improvement team (April
    21)
  2. Current state value stream map (draft April 28
    final May 14)
  3. Future state value stream map (draft May 19
    final June 1)
  4. Develop plan (June 1)
  5. Schedule RPI events (June 1)

3
1. Establish Core Continuous Improvement Team
  • Assignment
  • Provide details to MHRA team contact (April 21)
  • Identify participants
  • Establish a weekly meeting schedule
  • Determine performance metrics to be collected
    (examples rework, labor hours/floor, delays,
    etc.)

4
2. Current State Value Stream Map
  • Assignments
  • Preliminary draft (April 28)
  • Revise and rework based on feedback (May 14)
  • Conduct detailed analysis on selected processes

5
2. Current State Value Stream Map
  • Share information with the MHRA team as it is
    collected
  • The team will visit the plant to review progress
    and confer with the plants lean advocates
  • Finalize current state map with MHRA team input

6
2. Current State Value Stream Map
  • Identify from the value stream map specific areas
    of improvement
  • In each area, conduct detailed observations,
    create process flow maps, and collect
    quantitative data

7
3. Future State Value Stream Map
  • Assignment
  • Preliminary draft (May 19)
  • Revise and rework based on feedback (June 1)

8
3. Future State Value Stream Map
  • Develop a future-state value stream map, focusing
    on high priority, high return lean improvements
  • Potential improvements will likely include
  • Workplace organization and standardization
  • Labor optimization
  • Better tools and equipment
  • Procedures
  • Information systems

9
3. Future State Value Stream Map
  • Review and refine the future-state value stream
    map
  • Identify candidate lean improvements
  • Create a short list of candidate lean
    improvements that will form the basis for the RPI
    events

10
4. Develop Plan
  • Assignment
  • Develop plan for lean improvements (June 1)
  • Strategy for implementing lean improvements as
    depicted on the future-state value stream map
  • Base the plan on conducting three or more RPI
    events

11
4. Develop Plan
  • Each RPI event will be carefully planned,
    including
  • what is to be accomplished
  • how the event will be conducted
  • resources and materials are needed
  • plant personnel that will be involved
  • Floor supervision and operators must be involved

12
4. Develop Plan
  • The advocates and the advisory team will jointly
    draft the plan for the first RPI event
  • It will likely focus on workplace organization
    and standardization (5S), since this serves as
    the foundation for future lean improvements
  • Plans for subsequent RPI events will be drafted
    by the advocates and reviewed by the advisory
    team

13
5. RPI Events
  • Assignment
  • Submit requested RPI schedule dates (June 1)
  • Allot one week for an RPI event

14
5. RPI Events
  • The MHRA advisory team will work with the lean
    advocates in conducting three RPI events
  • The RPI events will initially be led by the MHRA
    advisory team
  • This responsibility will be shifted to the
    plants lean advocates in subsequent RPIs
  • The goal is to transfer the expertise in
    facilitating the process of continual improvement
    to plant staff

15
5. RPI Events
  • One or more members of the advisory team will be
    in the plant for each of the three RPI events
  • RPI events will be documented and evaluated by
    the advisory team with the assistance of the
    advocates

16
5. RPI Events
  • Results will be reported to plant management
  • The evaluation will focus on
  • RPI accomplishments
  • Factors that limited RPI success
  • Barriers that inhibit the development of a lean
    culture
  • Further opportunities for improvements

17
5. RPI Events
  • Advocates will be encouraged to conduct
    additional RPI events between advisory team
    visits
  • The future state map can include the additional
    RPIs or they may be conducted as follow-ups to
    previous RPIs

18
5. RPI Events
  • 5S Evaluation Sheet
  • RPI Event Guidelines
  • Time Observation Sheet
  • Process Design Analysis Sheet
  • RPI Event Area Selection Matrix
  • RPI Materials and Equipment Checklist
  • RPI Event Preparation Checklist By Activity
  • RPI Event Preparation Checklist By Time Frame
  • RPI Event Schedule
  • RPI Event Evaluation Form

19
6. Final team meeting
  • After completion of all RPI events, the lean
    advocates from all plants and the MHRA advisory
    team will convene for a one-day de-briefing where
    participants will share experiences

20
Thank You
  • and good luck.