Acceptance Testing Curriculum and Training for California - PowerPoint PPT Presentation

1 / 6
About This Presentation
Title:

Acceptance Testing Curriculum and Training for California

Description:

Title: PowerPoint Presentation Author: MFrank Last modified by: apotter Created Date: 4/17/2003 9:57:02 PM Document presentation format: On-screen Show – PowerPoint PPT presentation

Number of Views:77
Avg rating:3.0/5.0
Slides: 7
Provided by: MFr101
Category:

less

Transcript and Presenter's Notes

Title: Acceptance Testing Curriculum and Training for California


1
Acceptance TestingCurriculum and Training
for Californias New Acceptance Testing
Requirements
  • November 19, 2004

2
1. Background
New Acceptance Requirements
  • Take effect October 1, 2005
  • Require at least 12 acceptance tests for
    mechanical and electrical equipment
  • Awareness of the changes are essential to ensure
    the new requirements have the desired effect

3
2. Scope of Work
Item 1 Customized Curriculum
  • Building departments (plan checkers and
    inspectors)
  • Goal Provide evaluation criteria and guidance to
    help them
  • accurately and consistently review compliance
    forms
  • Test providers (installing contractors, PEs, TAB
    professionals, Cx providers)
  • Goal Teach them how to conduct tests and resolve
    problems to
  • ensure accurate and sound results
  • Designers
  • Goal Inform them of new requirements and the
    impacts on
  • equipment selection

4
2. Scope of Work
Item 2 Training for Test Providers and Designers
  • Suggested locations San Francisco, Irwindale,
    Sacramento
  • Attendees receive copy of PowerPoint presentation
    on CD
  • Test providers A modular schedule will allow
    them to attend only relevant sessions, for
    example
  • 800am-1130am Complex Mechanical Systems
  • 1130am-1200pm Break
  • 1200pm-200pm Simple Mechanical Systems
  • 200pm-230pm Break
  • 230pm-500pm Electrical Systems
  • Designers ½ day session (approx. 3 hrs), can be
    held both morning and afternoon in each location,
    if necessary

5
2. Scope of Work
Item 3 Marketing
  • Target markets contractors, PEs, TAB
    professionals, Cx providers, mechanical/electrical
    systems designers
  • Strategies on-line calendars, email
    announcements, newsletter listings,
    advertisements
  • Channels
  • Organizations Utilities, CCC, BCA, APPA, USGBC,
    ASHRAE, IHACI
  • Venues PEC, CTAC, SMUD Customer Service Center
  • Publications HPAC, Engineered Systems, Indoor
    Comfort News, HVAC/R News

6
3. Budget
Write a Comment
User Comments (0)
About PowerShow.com