Location-to-URL Mapping Architecture and Framework draft-ietf-ecrit-mapping-arch - PowerPoint PPT Presentation

1 / 6
About This Presentation
Title:

Location-to-URL Mapping Architecture and Framework draft-ietf-ecrit-mapping-arch

Description:

Location-to-URL Mapping Architecture and Framework draft-ietf-ecrit-mapping-arch Henning Schulzrinne Columbia University hgs_at_cs.columbia.edu 2 summary Seekers want ... – PowerPoint PPT presentation

Number of Views:74
Avg rating:3.0/5.0
Slides: 7
Provided by: colum153
Category:

less

Transcript and Presenter's Notes

Title: Location-to-URL Mapping Architecture and Framework draft-ietf-ecrit-mapping-arch


1
Location-to-URL Mapping Architecture and
Frameworkdraft-ietf-ecrit-mapping-arch
  • Henning Schulzrinne
  • Columbia University
  • hgs_at_cs.columbia.edu

2
2 summary
  • Seekers
  • want information
  • Resolvers
  • know gt 1 forest guide (but not trees)
  • may only know some services
  • Forest guides (many)
  • know trees and their coverage regions (for one or
    more services)
  • Trees (gt 1)
  • have authoritative data for particular regions
    and services

3
LoST Location-to-URL Mapping
VSP1
cluster serving VSP1
replicate root information
cluster serves VSP2
123 Broad Ave Leonia Bergen County NJ US
root nodes
NY US
NJ US
sippsap_at_leonianj.gov
search referral
Bergen County NJ US
Leonia NJ US
4
Caching
  • Resiliency requires caching
  • failure, DOS on tree,
  • Caching at multiple levels -- all optional
  • seeker results of own queries, for one or more
    service regions
  • including service regions by reference
  • resolver all queries by local seekers
  • top of tree lower level results within tree

5
LoST architecture
tree guide
G
G
G
broadcast (gossip)
T1 .us T2 .de
G
G
resolver
T2 (.de)
seeker 313 Westview Leonia, NJ US
T3 (.dk)
T1 (.us)
Leonia, NJ ? sippsap_at_leonianj.gov
6
Status next steps
  • Basic text stable
  • protocol for intra-cluster and inter-forest-guide
    left to define
  • Will generalize to multiple services
  • Move operational guidance to BCP (one para)
  • Ready for WGLC after -01
Write a Comment
User Comments (0)
About PowerShow.com