Title: SLING OUT OF HARM'S WAY
1SLING OUT OF HARM'S WAY
2RECOIL ACCIDENTS
- Two fatal recoil accidents in the past few years.
- Many fatal accidents and non-fatal injuries in
the past few years as a result of recoil,
rigging, and come-a-long accidents. - Significant number associated with longwalls.
3MAINTENANCE
- The process of scheduling and performing
preventative maintenance activities on wire ropes
and chains should be reviewed-especially in
preparation for a longwall move!
4(No Transcript)
5F-bar with Guards
6Removing Shield from Face
7COAL MINE FATALITY January 3, 2004 A 44-year
old longwall shearer operator with 26 years of
mining experience was fatally injured while
attempting to advance a longwall shield. The
longwall face was being mined through a setup
room containing cementatious "cutable" cribs.
These cribs failed, causing many of the shields
to fully collapse. To advance the longwall,
chains were attached from the collapsed shields
to the panline. Using two adjacent shields to
push the panline, the collapsed shield was pulled
forward with the attached chains and the shield's
double-acting ram. Miners were positioned on each
of the three affected shields to manually operate
them. During this process, the chain hook broke.
The remaining part of the hook and the chain
assembly recoiled, striking the miner operating
the collapsed shield in the head.
8- BEST PRACTICES
- Ensure that chain assemblies (rigging) are rated
for the loads being pulled. Consult the chain
manufacturer to determine chain assembly rated
capacities and also required de-ratings due to
the geometry of the final rigging arrangement. - Ensure persons are positioned in a safe location
before tension is applied when dragging or towing
equipment with chains, wire rope, or any other
rigging. - Ensure that chains and hooks are properly
attached or rigged. - Evaluate pillar strength and design before second
mining areas containing unusual circumstances,
such as setup rooms.
9- Miners must think about how to do the task
safely. - All miners involved must be properly trained.
- Take the necessary time to find and use the
correct tools. - We must assure that miners are not unfamiliar
with the task, job, or equipment. Persons take
on tasks or are assigned tasks that they are not
trained and/or equipped to perform. - Supervisors and miners must communicate when
there are near misses. People dont want others
to know about near misses. They become
embarrassed because they had erred due to
inexperience, rushing, use of poor judgment, or
had their thoughts elsewhere. Just because you
didnt get hurt does not mean that the next
person will be as lucky.
10SLINGS
- Chain Slings
- 2. Wire Rope Slings
- 3. Synthetic Web Slings
11THE FIRST ONE I CAN FIND METHOD
SOMETIMES CHAINS ARE NEEDED TO ACCOMPLISH
SOMETHING QUICKLY, LIKE TOWING A DISABLED VEHICLE
OR DRAGGING SOMETHING OUT OF THE WAY. WHEN TIME
IS A FACTOR, SELECTION AND INSPECTION ARE STEPS
SOMETIMES EASILY OVERLOOKED.
12- USE SLINGS OF
- ADEQUATE
- AND !
SIZE
STRENGTH
13METAL/NONMETAL MINE FATALITY- On April 29, 1998,
a 39-year old bull dozer operator with 15 years
of mining experience was fatally injured while
attempting to tow a truck that had become stuck.
He backed the dozer to the rear of the truck and
attached a chain. In the process of pulling the
truck out, the chain broke and struck the dozer
operator in the temple. He received severe head
injuries and died several days later.
14- COAL MINE FATALITY - September 9, 2003
- A 36-year old utility person with 4 years of
mining experience was fatally injured at a
surface coal mine. The victim and a co-worker
were using two pick-up trucks to assist moving
the power cable for an electric shovel that was
being repositioned. One of the trucks lost
traction in a muddy area and a nylon tow rope was
attached to a hook on the truck's front end. The
toe rope was then attached to a hook on the back
of the second pick-up. On the first attempt to
pull the truck, the metal hook broke loose from
the hitch of the front truck, pierced the
windshield of the rear truck and struck the
victim's head.
15- BEST PRACTICES
- Use only tested and approved mechanisms for
pulling or towing. - Obtain approval of manufacturer for modifications
to original towing equipment. - Ensure employees are properly instructed on
proper towing practices. - Ensure vehicles have sufficient traction for
surface conditions. - Conduct audits (observations) of specific tasks
to ensure proper techniques are employed and
tools/materials are maintained. - Never exceed the rated capacity of a tow vehicle
or towing equipment. - Use hands-on training specific to the individual
task. - Communicate prepare pre-task check of materials
and techniques for every application.
16- Known hazards tend to become routine which tends
to promote complacency. This complacency may not
allow us to acknowledge the hazards or identify
changes that can affect our safety. - Supervisors and miners must observe/evaluate/deter
mine the assignment in progress.
17TAKE INTO ACCOUNT
- WEIGHT OF LOAD
- SHAPE OF LOAD - avoid sharp edges (use pads)
- HOW TO HOOK UP LOAD - avoid dragging rigging from
under the load
18 Sling Tags
- Be familiar with manufacturers recommendations
for use and identification methods for rated load
capacity and test dates.
19- Never overload a sling!
- Remember, the wider the sling legs are spread
apart, the less the sling can lift! -
1000 lbs Lift Capacity
707 lbs Lift Capacity
500 lbs Lift Capacity
20(No Transcript)
21- Reeving through connections to load increases
load on connections fitting by as much as
twice.DO NOT REEVE!
22NEVER SHOCK LOAD A SLING!
23COAL MINE FATALITY June 9, 2003 A 49-year old
supervisor with 29 years mining experience was
fatally injured when he was thrown from the
elevated bucket of a Simon-Telect 42-foot aerial
bucket truck. The victim and two other miners
were dismantling a de-energized electrical
substation on the surface area of an underground
mine. To secure a steel "I-Beam" structure, a
nylon rope was attached between the bucket of the
aerial lift and the steel structure. After the
steel structure was disconnected from the
substation, the rope broke, causing the aerial
bucket to shift suddenly, throwing the victim out
of the bucket. The victim fell 28 feet 11 inches
to the ground. The steel "I-Beam" structure then
rolled onto the raised frame of the aerial bucket
truck.
24- BEST PRACTICES
- Use appropriate fall protection, including safety
harnesses and safety lines, where there is a
danger of falling. - Use equipment for its intended purpose and within
the design specifications of the manufacturer. - Conduct pre-operational checks on equipment prior
to operation and ensure that outriggers and
equipment are ready for intended use. - Size ropes/slings for maximum load applications
and protect them from being cut when a load is
applied. - Ensure that all workers are properly trained in
the task to be preformed, such as hoisting,
rigging, equipment design capabilities, etc.
25COAL MINE FATALITY November 9, 2004 A
55-year-old company president, with 30 years of
experience, was fatally injured when he was
crushed between a front end loader and a
tractor-trailer truck. The end loader was being
moved into position to allow the victim to
connect a steel cable from it to the truck. The
end loader was going to be used to pull the
tractor-trailer up the haul road, and was stopped
a short distance from the truck. While the victim
was connecting the cable to the truck, the end
loader inadvertently rolled back and crushed him
against the truck.
26- BEST PRACTICES
- Ensure that haulage equipment is compatible with
all conditions and haulage road grades at the
site. - Ensure that vehicles have sufficient traction for
surface conditions. - Avoid pulling or pushing of vehicles as a routine
practice. - Ensure employees are properly instructed on
proper towing procedures. - Monitor work habits routinely and examine work
areas to ensure that safe working procedures are
being followed. - Caution miners to avoid the hazards presented by
pinch points.
27CONNECTIONS
- The load capacity of the sling is determined by
its weakest component. - Match size and working load limit of attachments
to sling. -
28METAL/NONMETAL MINE FATALITY March 24, 2003 A
46-year-old supervisor with 8 years mining
experience was fatally injured on the surface at
an underground stone mine. A crane was lifting
steel plates that were to be used as conveyor
belt take-up weights. The victim was positioning
the plates when the rigging failed and the plates
crushed him
29- BEST PRACTICES
- Discuss work procedures and identify all hazards
associated with the work to be performed along
with the methods to properly protect persons. - Establish safe work procedures that require all
personnel to be positioned where they are not
working under suspended loads. - Train all personnel in safe work procedures.
- Use rigging that is free of defects and designed
to safely lift the load.
30IMPROPER USE OF CHAINS
- KNOTTED loading wont be along axis
- TWISTED
- BOLTED TOGETHER
31METAL/NONMETAL MINE FATALITY January 13,
2003 A 62-year-old supervisor with 26 years
mining experience was fatally injured at a cement
plant. The victim was standing 9 feet above
ground level at a door opening discussing the
progress of repairs with another foreman standing
outside on a concrete pad at ground level. The
victim was leaning on the top chain handrail that
was installed across the door opening. Apparently
as the victim exerted outward pressure against
the chain, the chain link slipped off the grab
hook attachment on the removable end of the chain
causing him to fall 9 feet to the concrete pad.
32- BEST PRACTICES
- Ensure that safety chains or handrails are
properly installed, regularly examined and
properly maintained, and are capable of
supporting the weight of a person who might fall
or lean on them. - Design the installation of safety chains to
ensure the termination points remain securely
attached when they are in place.
33Wire Rope Clips
RIGHT WAY FOR MAXIMUM ROPE STRENGTH
WRONG WAY CLIPS STAGGERED
WRONG WAY CLIPS REVERSED
34EXAMINATIONS
- Examine sling and anchorage points prior to each
use for damage and wear!
POSSIBLY THE MOST CRITICAL STEP IS THE VISUAL
INSPECTION OF RIGGING EQUIPMENT!
35Chain Sling Inspection Items
- Links that are bent, stretched, cracked, or
gouged.
Bent
Wear and Stretch
36Wire Rope Sling Inspection Items
- Broken wires, kinking or other distortion,
corrosion, and wear.
37REMOVAL CRITERIA
MORE THAN ONE BROKEN WIRE AT TERMINATION
38Synthetic Sling Inspection Items
- Melting, cuts, broken stitching, and stretching.
BROKEN STITCHING
MELTING AND CHARRING
One manufacturer warns Strap is permanently
damaged when exposed to temperatures in excess
of 200F. Avoid muffler and hot exhaust systems.
39To assist operators in determining if a sling is
stretched, many manufacturers incorporate a red
core warning system inside of the sling. When
this red wear cord can be readily seen upon
inspecting the sling, the sling has been
stretched and is to be removed
40BUNCHING
PINCHING
FOLDING, BUNCHING OR PINCHING OF SYNTHETIC SLINGS
WILL REDUCE THE RATED LOAD
41HOOKS
Never use a hook whose throat opening has been
increased, or whose tip has been bent. Hooks
should not be side loaded, back loaded, or tip
loaded.
Side Loaded
Back Loaded
Tip Loaded
42- Note A latch will not work properly on a hook
with a bent or worn tip.
43SHACKLES
Angle loads must be applied in the bow. Many
shackles incorporate guide markings to check the
angle of side pull.
44(No Transcript)
45(No Transcript)
46METAL/NONMETAL MINE FATALITY May 15, 2003 A
51-year-old master welder with 30 years mining
experience was fatally injured in a shop at a
surface stone mine. The victim was fabricating a
screen tower section. Using an overhead bridge
crane, he was positioning the 3-beam, right side
component for assembly. While the victim was
standing on the bottom beam, communicating with
the crane operator and positioning a chain sling,
the load shifted and fell, crushing him.
47- BEST PRACTICES
- Discuss work procedures and identify all hazards
associated with the work to be performed along
with the methods to protect personnel. - Require all personnel to be positioned to prevent
them from being exposed to any hazards. - Never perform work on or have unstable
structures/fabrications freestanding. - Secure loads before unhooking them.
- Arrange the rigging to prevent shifting of the
load being lifted. Balance the load by placing
the crane or hook block directly above the load's
center of gravity.
48Other Suggestions
Use sheave wheels or pads to pull around
corners. Use tow bars when possible.
30 CFR 77.1607 (u) Tow bars shall be used to
tow heavy equipment and a safety chain shall be
used in conjunction with each tow bar.
49Equipment with winches should be equipped with
guarding for the operator.
50COAL MINE FATALITY - On Friday, September 3,
1999, a preparation plant mechanic and another
employee were using a material hoist to lift a 55
gallon drum to the third floor of the preparation
plant. When the mechanic reached out to guide the
suspended drum to the third floor, a corroded
railing gave way and he fell approximately 50
feet to the ground floor of the preparation
plant.
30 CFR 77.210 (c) Taglines shall be attached to
hoisted materials that require steadying or
guidance.
51- For every 300 near miss accidents, there will be
29 minor accidents. And for every 29 minor
accidents, there will be one serious accident.
If we encourage people to report near miss
accidents, we can expect minor accidents to be
reduced and possibly the serious accident will be
eliminated.
52Non Fatal Accident CONSTRUCTION ACCIDENT BLINDS
MANA Texas man is a lucky to be alive after a
construction accident involving a large hook.
The hook was attached to a backhoe when it hit
Gail Cook in the left temple and eye back in
December. X-rays show how it lodged in Cook's
head, stopping within millimeters of his brain.
Surgeons in San Antonio were able to remove the
hook. But both optic nerves were severed. The
accident has left Cook blind, but also thankful
to be alive.USA, Action News
53- Non Fatal Accidents
- Employee was removing the wire ropes from the
drag drum when a 2 inch nylon sling broke and
recoiled striking them in the head, knocking them
unconscious. The wire rope tugger was being used
to pull the rope slack toward the rear of the
machine when the nylon sling appears to have been
cut by the threads of an inch and a half bolt on
the drum clamp. - Three employees were working to pull the tailgate
drive back. The gob plate was attached to the
shield with chains. As they started to pull, one
of the chains broke and struck the employee in
the face, causing a fracture to the cheek and a
laceration requiring stitches.
54- Near Miss Accident
- Some information we have on pulling equipment may
help others. We had a coal hauler stuck at the
stockpile, we used a rubber tire dozer and a 2"
cable choker 10' long to pull the coal hauler
out. The operator in the coal hauler was
accelerating to assist the rubber tire dozer, as
the coal hauler began to move it suddenly lunged
forward. The forward momentum of the coal hauler
allowed it to hit the rear of the rubber tire
dozer. When the coal hauler hit the rubber tire
dozer it caused the rubber tire dozer to lunge
forward. The 10' cable choker acted as a large
rubber band allowing the two machines to slam
together twice before the operators could react
and get their machines stopped. We now require a
20' choker to be used when one machine is pulling
another machine. Thus allowing operators more
time to react to the unexpected.
55CONCLUSIONS
- Maintain Communications!!
- Stay Clear!! All persons MUST be in a safe
location!! -
Remember, the longer the sling, the wider the
recoil radius!
56QUESTIONS
- Do you think that an individuals actions should
be reviewed in accident investigations? - Do you think that an individuals actions are a
common denominator for some of our most recent
accidents? - If so, how do we fix this?
- How can we motivate people to make the correct
choices? - Any other comments or suggestions?
57Any person with questions, or would like to make
additional comments/suggestions, please contact
MSHAs District 9 office at Bob
Cornett Email Cornett.Bob_at_DOL.GOV Al
Davis Email Davis.Allyn_at_DOL.GOV Mailing
Address Mine Safety and Health
Administration Coal Mine Safety and Health P.
O. Box 25367 DFC Denver, CO 80225 Telephone 3
03-231-5458 Fax 303-231-5553