Multiphase flow group - PowerPoint PPT Presentation

About This Presentation
Title:

Multiphase flow group

Description:

... atmospheric Applied research SINTEF Multiphase Lab, Tiller Large scale, real conditions pressure Direct industrial applications LGC Multiphase Group & IMFT, ... – PowerPoint PPT presentation

Number of Views:190
Avg rating:3.0/5.0
Slides: 10
Provided by: ntn83
Category:

less

Transcript and Presenter's Notes

Title: Multiphase flow group


1
Multiphase flow group
  • Sophie Galinat
  • Jørn Kjølaas
  • Christophe Conan
  • Fabien Renault

2
Agenda
  • Field of research
  • Experimental facilities
  • Common interest
  • Potential for interaction
  • Conclusion

3
Field of research
  • NTNU Multiphase Lab, Trondheim
  • Small scale, atmospheric
  • Applied research
  • SINTEF Multiphase Lab, Tiller
  • Large scale, real conditions pressure
  • Direct industrial applications
  • LGC Multiphase Group IMFT, Toulouse
  • Micro scale phenomena and implications
  • Emphasis on fundamentals

4
Experimental facilities
  • NTNU
  • Straight acrylic 6 3 cm ID, 16m 15º
  • Straight steel 6 , 16m 15º
  • Flexible acrylic 5 cm ID 16m
  • S riser
  • L riser

5
Experimental facilities
  • SINTEF
  • Medium scale 6.9 cm ID, 200m 1º
  • Large scale 19 cm ID, 1000m 1º
  • LGC multiphase group
  • Vertical section 3 cm ID
  • Straight acrylic 5 cm ID, 10m
  • IMFT steel 30m

6
Common interest
  • Oil/water flow is clearly a shared topic of
    research
  • Christophe (Toulouse) experiments and modelling
  • Trygve (NTNU) computing schemes
  • Karolina (Imperial College visiting NTNU)
    caracterisation of inversion point.
  • Monika (NTNU) Influence of water on slug flow

7
Potentialfor Interaction
  • Marie Curie training sites
  • Visiting PhDs come for 6 months
  • Possibility to use the available loops
  • Interest validate the results on another loop
    (different fluids, diameter, )
  • Sharing of data possible

8
Conclusion
  • As a common interest has been found between the
    two laboratories, contact should be kept in the
    future.
  • Open invitation to visit NTNU
  • Possible Dr.Ing meeting in Pau with visit of
    local facilities (IMFTLGC)

9
(No Transcript)
Write a Comment
User Comments (0)
About PowerShow.com