Title: The New Accountability
1- The New Accountability
- Part 1 Contractors Accounting and Tax Update
- James C. Lundy, CPA
- Partner
- Davidson, Golden Lundy
-
- Charlie Woodman, CPA
- Risk Finance Advisory
- Willis National Construction
- 2011 Willis Construction Risk Management
Conference - April 21, 2011
2Construction Industry - Current Trends and
Observations
- The recession is not over
- Certain sectors hit harder than others
residential, retail, commercial building,
hotel/motel, churches - Certain sectors have held steady healthcare,
infrastructure, education, utility - Its not just a recession, its a correction.
- Concern about construction materials price
volatility and inflation fuel, asphalt, PVC,
steel, cement, aggregates, copper, etc. - Escalator clauses are becoming more common
- How strong is the guarantee behind your price
quote? - Supply bonds
- Lower profit margins
- 30 to 100 reductions
- Increase in bidders and bid spreads
3Construction Industry - Current Trends and
Observations
- Increase in mergers and acquisitions
- Strategic acquisitions
- Buyers market - Steals - not Deals
- Increase in self performed work
- Too many contractors
- Construction period or Gap financing
- Extended period warranties
- Overbilling vs. warranty reserve
- Reporting issues
- Generally, survivors are winners - construction
fortunes have been made by being aggressive
during recessions - Bankers and sureties are concerned
4Overview of Financial Reporting for Contractors
- Financial reporting is the responsibility of
Owners, CFOs, Management, Controllers and
Independent CPAs - all share the risk - Economic crisis has resulted in more reliance on
statements - More scrutiny and analysis on financial reporting
than prior years - Management, CPAs and Controllers have personal
liability if intentionally misleading - Reliance by various users on financial
statements - Sureties
- Banks and finance companies
- Regulatory boards - licensing
- Owner and prime contractor prequalification
- Suppliers
- Stockholders (owners)
- Joint venture partners
- Unique methods and disclosures
- Real world suggestions
- Timeliness - delaying year end statements longer
than 75 days is unacceptable monthly and
quarterly reporting - 30 days - Honest communication is key
- Surprises damage credibility job fade, claims,
losses - The surety and bank are your Partners
5Revenue Recognition
- Commandments of Construction Reporting
- Underbillings are bad
- Unrecognized loss (fade) of poor cash flow
management? - Historical support for underbilling recognition
- Dumb or dishonest?
- Professional skepticism
- Overbillings are good, but should be in the bank
- Positive ratio of non-borrowed cash to
overbillings - Current Accounting Under SOP 81-1 Percentage of
completion method is required - Cost to cost unless another method is more
conservative - No gross profit estimates in excess of historical
without tangible documentation - Soft fade/gain analysis type of work, location,
customer - Use caution when segregating and combining
contracts - Accurate phase coding is required
6FASB / IASB Preliminary Document on Revenue
Recognition
- Exposure Draft issued June 24, 2010 (Topic
605-35) final statement due in 2011 (replaces
SOP 81-1 after 30 years) - Revenue recognition FASB proposes major changes
to the way contractors account for revenue
recognition. Under the proposal, contractors
would be required to adopt new financial
reporting techniques that may be more subjective
compared to the current method, percentage of
completion (POC). - Purpose Recognize revenue to depict the
transfer of goods and services in an amount that
reflects the consideration expected to be
received for those goods and services. - A balance sheet approach that emphasizes
- Unconditional obligation to pay
- Legal title
- Physical possession
7Comparisons
Comparison of Key Features of the Proposed Standard vs. Current Standard Comparison of Key Features of the Proposed Standard vs. Current Standard Comparison of Key Features of the Proposed Standard vs. Current Standard Comparison of Key Features of the Proposed Standard vs. Current Standard Comparison of Key Features of the Proposed Standard vs. Current Standard
Current StandardRevenue Recognition - Construction-Type and Production-Type Contracts ASC 605-35 (Formerly SOP 81-1) Current StandardRevenue Recognition - Construction-Type and Production-Type Contracts ASC 605-35 (Formerly SOP 81-1) Proposed StandardRevenue Recognition from Contracts with Customers Topic 605 Proposed StandardRevenue Recognition from Contracts with Customers Topic 605
Sub paragraph Sub paragraph
Profit Center 25-3 Basic presumption is that each contract is the profit center for revenue recognition, cost accumulation, and income measurement. Segmented is allowed under certain strict conditions. 12-16 Evaluate distinct performance obligations within each contract for separate revenue, cost accumulation, and income measurement. Combined obligations are allowed when activities are interdependent.
Method of Recording Revenue 25-51 Recognize income as work on a contract progresses. Incurred costs in relation to total estimated costs or other such measure of progress toward completion. Presumes ability to estimate total contract costs. 25 Recognize income when it satisfies a performance obligation by transferring a promised good or service to a customer. The transfer occurs when the customer obtains control of that good or service.
Variable Contract Prices 25-60 Use most conservative estimate of revenue that is assured and likely to occur. When in doubt, use lowest probably level of profit until results can be estimated more precisely. 41 If the transaction price cannot be reasonably estimated, do not recognize revenue. If transaction can be reasonably estimated, recognize revenue from satisfied performance obligations when it can be estimated. Recommended to use weighted probability measures to determine transaction if entity has sufficient history of similar transactions.
8Comparisons
Comparison of Key Features of the Proposed Standard vs. Current Standard Comparison of Key Features of the Proposed Standard vs. Current Standard Comparison of Key Features of the Proposed Standard vs. Current Standard Comparison of Key Features of the Proposed Standard vs. Current Standard Comparison of Key Features of the Proposed Standard vs. Current Standard
Current StandardRevenue Recognition - Construction-Type and Production-Type Contracts ASC 605-35 (Formerly SOP 81-1) Current StandardRevenue Recognition - Construction-Type and Production-Type Contracts ASC 605-35 (Formerly SOP 81-1) Proposed StandardRevenue Recognition from Contracts with Customers Topic 605 Proposed StandardRevenue Recognition from Contracts with Customers Topic 605
Sub paragraph Sub paragraph
Contract Costs 25-34 Accumulated in same manner as inventory and charged to operations as related revenue from contracts is recognized. Includes direct and indirect costs. 58 Same as current standard with exceptions for procurement, mobilization, and inefficiency
Procurement Costs 25-39 Costs should be expensed unless they are recoverable under an active contract 59 Costs of obtaining a contract, including bid and proposals, and negotiations are expensed when incurred.
Mobilization Costs 25-41 Costs may be deferred and included in contract costs on receipt of anticipated contract. 57 Recognize these costs as an asset when they related directly to a contract, generate or enhance resources used for satisfying performance obligations, and are expected to be recovered. Amortize this asset ratably over the duration of the project.
9Comparisons
Comparison of Key Features of the Proposed Standard vs. Current Standard Comparison of Key Features of the Proposed Standard vs. Current Standard Comparison of Key Features of the Proposed Standard vs. Current Standard Comparison of Key Features of the Proposed Standard vs. Current Standard Comparison of Key Features of the Proposed Standard vs. Current Standard
Current StandardRevenue Recognition - Construction-Type and Production-Type Contracts ASC 605-35 (Formerly SOP 81-1) Current StandardRevenue Recognition - Construction-Type and Production-Type Contracts ASC 605-35 (Formerly SOP 81-1) Proposed StandardRevenue Recognition from Contracts with Customers Topic 605 Proposed StandardRevenue Recognition from Contracts with Customers Topic 605
Sub paragraph Sub paragraph
Change Orders
Approved 25-25 Contract Price Adjusted, cumulative catch up of revenue 17-19 Contract Price Adjusted, cumulative catch up of revenue
Unpriced 25-87 If recovery probable (events necessary for recovery likely to occur), recognize revenue to extent of cost until approved. If changes are in dispute, evaluate as a claim. 41 Evaluated as variable consideration
Claims 25-31 Reorganization appropriate only if probable that the claim will be sustained and amount can be reliably estimated. Record only to the extent of contract costs. In practice, not typically recorded until amounts have been received or awarded. May record as adjustment to contract if realization is beyond a reasonable doubt. 41 Evaluated as variable consideration
10Issues
- Why convergence with IFRS / US GAAP better
information for users - A new focus on control and separation during the
earnings process - But
- Is the contract a continuous transfer of
assets? Confusion over what satisfies
performance obligations - Has the customer gained control of the work in
process? If yes, percentage of completion
method will be required - Interpretation that title of control does not
transfer until contract completion, will require
revenue recognition on the completed contract
method - Possible split of the revenue recognition model
between goods (transfer upon sale of product),
and services (continuous transfer through
performance of tasks or series of tasks). - Leading to a new definition of construction
contracts as a continuous delivery or process?
11Other Issues
- Specialized assets completed contracts progress
billing percentage of completion (and Work In
Process) - Warranty costs result in revenue deferral vs.
cost accrual - Warranties are an emerging issues
- Change from cost to cost to units / labor hours
- Uninstalled materials and timing
- Unpriced change orders recognize profits?
- Performance bonuses estimated at reporting date
- Acceptance by sureties? A sometimes skittish
lot. - Tax?
12Updates
- New proposals to retain the current accounting
principle SOP 81-1 for measuring revenue during
the progress of a contract - Continue to pursue a carve out provision for
revenue recognition with FASB for the
construction industry - FASB wants to understand how the proposal will
impact contractors income tax reporting - At this point FASB still plans to issue the new
revenue recognition accounting standard in the
second or third quarter of 2011, but admits
significant issues on the proposal still exist.
13Changes to Lease Accounting Could Impact
Contractors Finances
- On August 17, 2010 FASB and IASB (Topic 840)
draft accounting standard on lease accounting
which attempts to ensure assets and liabilities
arising from lease transactions are recognized in
the statement of financial position (Balance
Sheet). - Currently (FASB 13)leases accounted under one of
two ways operating lease or capital lease. - Capital (or financing) leases transfer
substantially all of the risks and benefits of
ownership to the lessee as if the lessee borrowed
the money to purchase the property. Capital
leases are treated similarly to a purchase of the
underlying asset. On Balance Sheet Recognition - Operating leases are all other leases that are
not classified as capital leases and are
generally treated as rental of property, and the
effects are recorded as rent expense over a
straight-line basis over the term of the lease.
Off Balance Sheet, with disclosure - A lease is deemed to be financing if
- Ownership transfer
- Bargain purchase options
- Lease term gt than 75 of assets useful life
- NPV of future lease payments is gt 90 of FMV of
asset
14New Lease FASB Discussion Paper (Topic 840)
- FASB is going to fix SFAS 13, and make it more
like IAS 17. Once again a balance sheet emphasis. - The preliminary conclusions of the board are
- A lessee obtains the right-to-use an asset
- The lessee creates a corresponding liability
- Lease options do not require separate accounting.
These include - ? Renewal options
- ? Contingent rental arrangements
- ? Guaranteed residual value requirements
- The results of these preliminary conclusions will
result in leases - - All being treated uniformly
- - Not being capital versus operating leases
- - Being treated as a single transaction
- - Being treated as purchases of the asset
- ?
15New Lease FASB Discussion Paper (Topic 840)
Cont
- The Accounting
- A liability is recorded
- - Based on the present value of the lease
payments - - Payments reduce liability to zero
- A corresponding asset is recorded
- At cost (present value of lease payments)
- Identified separately from owned assets
- Amortized over the shorter of
- - The lease term
- - The economic life of the asset
16New Lease FASB Discussion Paper (Topic 840)
- Changes can affect liability and asset
(impairment) - Option to buy
- Option price is included in liability
- Exclusion of asset from owned assets not required
- Topics not addressed in this opinion paper are
- Impact on exploration and use of natural
resources agreements - Treatment for non-core assets (such as airplanes
for non-airlines) - Short-term lease contracts
- In summary, the discussion paper indicates FASB
is working to treat virtually all leases - under the existing capital lease rules, and
significantly reduce off-balance sheet financing
by operating leases.
17Changes to Lease Accounting Impact
- These changes could have a significant impact on
construction entities that do a lot of financing
through operating leases. - Due to the impact of the lease accounting
changes, we will likely see lessees desire
shorter term leases to reduce both the increased
leverage and the impact of the increase in
first-year lease costs. Lessors may be inclined
to charge a higher price on leases to offset the
additional risk they would be subjected to with
shorter term leases. - These changes likely will not become effective
until 2012. There are some actions that can be
taken now to quantify and possibly reduce the
impact - Determine if this is going to have a major impact
on your business. If you lease a significant
amount of assets, this accounting change is
likely to have a larger impact on your
financials. - Quantify the impact of the proposed changes by
considering all existing and potential future
operating leases. - Review and analyze how your corporate agreements
(e.g. loan documents, compensation agreements,
etc.) are affected and if the agreements can and
should be amended to take into consideration the
changes solely due to the changes in lease
accounting.
18Updates
- The AGC issued a formal comment letter to FASB
detailing its concerns. These issues may be hard
to resolve in this short time frame. - Accounting for lease transactions Under FASBs
proposed model, all operating leases would be
classified as capital, which could redefine the
underwriting processes and covenants in the
banking and surety industry. This will have a
significant impact on contractors balance
sheets, working capital, and leverage - No real effect to cash flow or existing tax law
- May change job costing due to depreciation and
capital cost charges - Operating ratios EBITDA
- Proposing differentiation between equipment
leases and real estate leases - How this impacts accounting for services such as
cranes, scaffolding, and other sub-contractor
arrangements - The need to separately address short-term rental
arrangements or leases with terms less than a
year or an operating cycle - Other ramifications
- FAR Rents are allowed but interest and financing
charges are disallowed - Sales taxcapital lease vs. rent classification
creates sales tax consequences
19FASB Interpretation No. 48 (FIN 48)
- FIN 48- FASBs latest pronouncement in accounting
for income taxes. - Released July 13, 2006 / Effective Date for Years
Beginning on or After December 15, 2006 - FIN 48 interprets FAS 109
- Intent is to decrease the diversity in accounting
for uncertainty in income tax financial statement
positions. - Prior to recognizing the benefit of a tax
position for financial reporting purposes, the
tax position must be more-likely-than-not (MLTN)
of being sustained solely on its technical merits
(excluding detection risk) - Tax positions recognized are reported at the
largest amount that is MLTN to be sustained
19
20FIN 48 As Applied
- Evaluate each position for recognition. In order
to recognize any amount of the benefit, the
position must be MLTN of being sustained
assuming - The position will be examined
- The examiner will have full knowledge of all
relevant info - Evaluation based solely on technical merits
- No offset or aggregation of positions
- Should assume resolution in the court of last
resort - May Not Take Into Account Audit Risk or The
Likelihood of Being Audited - Sage Input
- Overblown reaction by CPA profession?
- Is it a reasonable method with substantial
authority or frivolous? - Is it more likely than not (gt50) that the IRS
will disallow?
20
21Surety analyst email statement
- There has been some discussion about FIN 48
recently and I wanted to let everyone know how we
see it affecting us as a Surety. First, keep in
mind that a FIN is an interpretation and
clarification of pre-existing GAAP CPAs were
already required to disclose these issues.
Simply stated, FIN 48 states that if an entity
takes a tax position that is more likely than
not to fail a tax examination, they must book a
liability and include a disclosure reflecting
such. Second, I think it is a good rule for the
Surety, as users of the financial statements. It
forces entities with whom we do business to
disclose and quantify unreasonable tax positions,
which will assist in our underwriting. A far
more important issue is the necessity to disclose
off balance sheet tax liabilities of pass through
S-Corporations and LLCs.
22Other Financial Reporting Items
- Going Concern Opinion
- Losses, significant debt and significant backlog
reductions - SAS 59 - Exposure draft issued to enhance - FASB
issued Project Update on 10/21/09 - Look forward 12 months or longer
- FASB 165 Subsequent Events
- Establishes cutoff date for evaluation of
subsequent events - Recognized and unrecognized events
- Concerns and issues with holding financial
statements liability to CPAs if delay results
in damages to user
23Most Commonly Missed Disclosures and Format Errors
- Will the disclosure affect the conclusions of the
user? - Formatting errors
- Balance sheet segregation and disclosure of
- Retainage receivable and payable
- Claims receivable and payable
- Unbilled receivables
- POC adjustments
- Loss contract accrual
- FIN 46 consolidation
- Joint venture partial consolidation results in
correct working capital recognition - Would the consolidation affect the users
conclusion?
24Most Commonly Missed Disclosures and Format Errors
- Accrual for self-insurance deductibles /
liabilities - Accounts receivable
- Aged receivable issue (over 90 days)
- Claims and unapproved change orders (recognition
of income to cost incurred) - Detailed and comprehensive disclosure of claims
and unapproved C/Os - Facts and basis for the claim
- Revenue recognized, if any
- Detailed calculations, discounts and assumptions
- Arbitration or court dates
- Separate line item reporting on contract schedule
to prevent POC cost to cost recognition
25Most Commonly Missed Disclosures and Format Errors
- Significant changes in contract estimates
- SOP 94-6 disclosures for current and cumulative
impact to revenue and gross profit - Loss contract accrual calculation
- Backlog
- Key consideration in going concern determination
- Backlog gross profit calculation on contract
schedule - Backlog subcontracted - bonded?
- FIN 45 off balance sheet guarantees
- Surety bonds issued and outstanding
26Most Commonly Missed Disclosures and Format Errors
- Equity with characteristics of liabilities (FAS
150) - Mandatory buy sell liability
- Callable preferred stock
- Subordination agreements
- Tax liabilities of pass through entities (S-Corp
LLC) - Not in SOP 81-1, but
- Current and deferred liabilities
- Management intention to distribute cash
- Consideration of accrued distribution
27Tax Update on Rent-A-Captives / Segregated Cell
Arrangements
- Sponsored Facilities
- Rent-A-Captives
- Agency Captives
- Carrier Captives
- Key Insureds and Captive Owners are usually
unrelated entities.
28IRS View of Cell Taxation
- In 2005, the IRS asked the industry how cell
captives should be taxed and the industry
responded. - In 2008, the IRS stated how it would test the
presence of insurance and the deductibility of
the premium by the insured. It advised how it
was considering treating the cell for tax
purposes, but asked for comments before it made a
final decision - Rev. Rul. 2008-8 insurance is determined on a
cell-by-cell basis if there is insurance, the
insured can deduct it. - Notice 2008-19 the IRS currently intends to
treat each cell as its own insurance company and
all elections will be made on a cell-by-cell
basis but, the IRS is seeking comments before it
makes its final decision. The final rules will
not go into effect until the first taxable year
beginning more than 12 months after the date the
final decision is published. - The Notice does not state how the cells will be
taxed in the interim.
Cell Rent Session / 28
29Proposed Treasury Regs (9/14/2010)
- A Domestic Cell (or series in a series LLC) will
be taxed as a separate entity. - The same applies to a Foreign Cell (or series),
if the Cell (series) would be an insurance
company. - Each cell gets its own EIN and files its own
return. - Each cell makes its own elections.
- Effective when regulations are finalized.
Cell Rent Session / 29
30Grandfather Rule in Proposed Treasury Regs
(9/14/2010) if all below are met
- There is a grandfather rule if all tests are
met - The cell company was established before September
14, 2010 - The cell conducted business (if a foreign cell,
more than half its business was insurance) before
September 14, 2010 - If foreign, the cell classification is relevant
technical requirement - No cell owner treats the cells as a separate
entity for any taxable year - The cell and cell company had a reasonable basis
for their historic treatment - Neither the cell, cell company, nor owner was
under audit for the cell treatment on or before
September 14, 2010 - Grandfathering ceases if 50 or more of the vote
or value of the cell company or cell is owned by
those other than those who owned them on
September 14, 2010
Cell Rent Session / 30
31Other
- Foreign Bank Account Reporting
- New amnesty
- Not as generous as last years
- Signal for aggressive enforcement in the future
- Tax treaty partners
32- The New Accountability
- Part 2 Compliance and Audit Discussion
- James C. Lundy, CPA
- Partner
- Davidson, Golden Lundy
-
- Charlie Woodman, CPA
- Risk Finance Advisory
- Willis National Construction
- 2011 Willis Construction Risk Management
Conference - April 21, 2011
33Why Cost Accounting is So Important
- It Helps In
- Bidding
- Determining problem projects
- Supporting change order pricing
- Claims process
- Reconciling job costs to financial reports
- Making better decisions
- Making expansion less frightening
- Todays focus Supporting Audits
- Commercial
- Governmental
- Tax
34What is a Contract Compliance Audit
- Compares costs billed to costs incurred
- Compares costs billed to allowable costs
- Compares fees (formula and rates) to contract
provisions - Confirms contract procedures were followed
- Confirms owners administrative procedures were
followed - Assures that owner is not overpaying especially
on reimbursable costs - Keeps contractor accounting staffs on edge
- Keeps forensic accountants and the DCAA (and like
kind agencies) employed
35If Youre Not Prepared What Can A Contract
Compliance Audit Do
- Create tension
- Cause ill will and jeopardize relationships
- Distract employees and incur significant cost
- Highlight contract vagaries
- Lead to penalties and fines
- Cause future contract / bid disqualification or
debarment - The biggest failures
- disorganization
- poor contract negotiation or understanding of
terms and conditions - inability to support or defend cost allowability,
cost determination, and information / data
processes
36Success Strategies
- Adhere to planned project procedures and document
any deviations, including source, reasoning and
resulting impacts - Know all contract terms conditions prior to
start, reconcile any provisions that are vague /
use, where practical, hard rate terms especially
for reimbursable items - Maintain and keep accessible records and files
throughout the project - Conduct cash to cost to projection reconciliation
regularly and anticipate audit issues preemptively
37Contract Terms for Focus
- Audit scope and processes
- Recordkeeping requirements and data support
- Reporting requirements, timing and content
- Pre-established costs for specific project
- General conditions pricing
- Self-performed work rates or equipment usage
rates - Approved mark-up rates
- Change order minimum rates
- Acceptable cost support documentation especial
for cost-plus or reimbursement - Disclose related party transactions
- Address rebates and cost caps
- Specific measureables (e.g., efficacy) and
deliverables - Guarantees and warranties
- Cost sharing
38The Federal Government and Insurance Costs
- So what
- Insurance costs are generally recoverable under
government awards, but can be long tail - Establishing well-defined processes and proper
accounting are key practices to achieve recovery
of insurance costs - Certain practices EC contractors employ for
commercial contracts (e.g. lump sum) may be
questioned by government auditors - Government regulations may require a different
practice - Government auditor may believe a different
practice is necessary - Typical existing practices
- Measuring cost of self-insurance based on losses
incurred rather than a projected average loss - Self-insurance charges not in accordance with
accepted actuarial principles - Insurance costs based on premiums charged from
captive insurers or companies under common
control of contractor - Insurance programs have not been approved
39Regulations
- Key regulation for accounting for insurance
costs - Cost Accounting Standard (CAS) 416, Accounting
for Insurance Costs - Cost Accounting Standard (CAS) 403, Accounting
for Home Office Costs - FAR 31.205-19, Insurance and Indemnification
- FAR 31.201-5, Credits
- FAR 28.3, Insurance
- When to evaluate your current accounting
practices for insurance costs? - Contracts will be CAS covered
- Contracts subject to Federal Acquisition
Regulation 31.205-19, Insurance and
Indemnification - Full text of FAR clauses can be found at
https//www.acquisition.gov/far/index.html - Full text of Cost Accounting Standards can be
found at http//www.access.gpo.gov/nara/cfr/waisid
x_01/48cfr9904_01.html
40Identifying CAS and FAR in contracts
- Typically, CAS and FAR requirements are disclosed
in - Contract and subcontract solicitation documents
- Draft contract terms and conditions
- Solicitation representations and certifications
- Draft contract clauses to be incorporated by
reference in the awarded contract - FAR cost principles may apply in other
circumstances where the original contract did not
require application of FAR cost principles - Change order proposals
- Cost reimbursement or progress payment requests
- Equitable adjustment claims
- Termination clauses
41CAS Coverage
- The CAS are governed by the CAS Board and
currently consists of 19 separate standards. - The CAS can be imposed on a contractor under the
following circumstances - By reference by the Federal Acquisition
Regulation (FAR) - Modified CAS coverage Single federal contract or
subcontract greater than 7.5 million but less
than 50 million - Full CAS Coverage Federal contracts or
subcontracts greater than 50 million or Net
Federal CAS-covered contracts received by the
contractor totaling 50 million or more during
the preceding cost accounting period
42FAR Cost Principles
- FAR Part 31 Applicability
- Cost reimbursable contracts
- Fixed price contracts priced based on submission
of certified cost or pricing data - Cost principles in effect when contract awarded
applicable for life of contract, with certain
exceptions - Allowable costs limited by FAR Part 31 and CAS
requirements - Includes FAR 31.205-19, Insurance and
Indemnification
43Basic CAS Insurance Accounting Concepts
- CAS includes an express requirement that the
amount of insurance cost assigned to a period is
the projected average loss for that period plus
insurance administration expense - Because CAS requires a projected average loss,
measuring insurance costs based on actual losses
is limited to circumstances where actual losses
will not vary significantly from a projected
average loss - Under the CAS 416 concept, a risk of loss is
covered by either purchased insurance, payments
to a trusteed fund or self-insurance - Applied
- Projected average loss means the estimated
long-term average loss per period for periods of
comparable exposure to risk of loss. - Self-insurance means the assumption or retention
of the risk of loss by the contractor, whether
voluntarily or involuntarily. This includes the
deductible portion of purchased insurance. - Self-insurance charge means a cost which
represents the projected average loss under a
self-insurance plan. Because CAS requires a
projected average loss, measuring insurance costs
based on actual losses is limited to
circumstances where actual losses will not vary
significantly from a projected average loss .
44FAR Part 31, Cost Principles Allowability
- Factors for determining allowability A cost is
allowable only when the cost complies with all of
the following requirements - Reasonableness Allocability
- Cost accounting standards, or otherwise generally
accepted accounting principles and practices
appropriate to the circumstances - Terms of the contract
- FAR subpart 31.2 limitations
- Costs of insurance required by contract are
allowable - Costs of general insurance are allowable if
reasonable and measured, assigned and allocated
in accordance with the requirements of CAS 416 - Costs of business interruption insurance must
exclude coverage for lost profits - Self-insurance program approval is required when
- 50 or gt of the self-insurance costs allocable to
negotiated government contracts - Self-insurance costs for the fiscal year are
anticipated gt200k
45Purchased Insurance Premiums
- The projected average loss (PAL) starts with the
premium cost - If covers more than one cost accounting period,
pro rate costs over the period covered (prepaid
insurance account) - If insurance is purchased specifically for and
directly allocated to a single cost objective
(e.g. job), do not need to pro rate - The applicable portion of any income, rebate,
allowance, or other credit relating to any
allowable cost and received by or accruing to the
contractor shall be credited to the Government
either as a cost reduction or by cash refund. - Includes refunds, dividends or additional
assessments - Must be recognized as an adjustment to the pro
rata premium costs in the earliest period in
which it is actually or constructively received
46Insurance Reserves
- IBNR (Incurred But Not Reported)
- Reasonable reserves for IBNR should not be
considered deposits and related premiums reflect
insurance costs - While generally understood by Government
reviewers to be a common feature, may be concern
that reserves are too large - If Government reviewer considers reserve
unreasonably large, may question a portion of the
reserve and the related insurance cost - To lessen risk of issues with purchased insurance
reserves, contractors and insurance carriers
should be prepared to demonstrate that reserves
are reasonable based on - Exposure to loss
- Actual loss experience
- Loss Trending and / or Inflation
- Loss development experience or lag studies
- Discounting reserves not expressly required by
CAS 416, but DCAA guidance suggests reserves may
be subject to present value discounting
47FAR 31.205-19(b) Captive Insurance
Self-Insurance
- Mistake to account for payments to a captive as
purchased insurance - Exception when able to demonstrate that captive
sells insurance to general public in substantial
quantities and insurance charges reflect market
forces - Contractor should plan to measure captive
insurance as self-insurance, unless Captive
sells the coverage commercially and premiums paid
by the contractor can be demonstrated to be based
on market prices - Must treat Government as a Favored Insured
- Group Captives will generally be treated as
purchased insurance with limitations for
deductible or A-Layer accounts.
48Measurement of Self-insurance Charges
- With significant self-insurance, typical
practices for recovering insurance costs are
establishing methods for - 1.Estimating annual projected average losses
- 2.Allocating self-insurance charges to segments
and cost objectives (jobs) - Under CAS 416, three ways to measure projected
average loss (PAL) - 1.Actual Losses actual amount of losses (where
actual losses not expected to differ
significantly from PAL) - 2.Comparable Purchased Insurance Estimate of the
PAL based on the cost of insurance that could be
purchased for the self-insured risk - 3.Actuarial Measurement self-insurance charge
based on the contractors or industry experience
and anticipated conditions in accordance with
generally accepted actuarial principles - The total of self-insured charges plus insurance
charges must not exceed guaranteed cost insurance
for the same exposures
49Measurement of Self-insurance Charges
- However, when the self-insurance charge is not
based on actual losses or the cost of comparable
purchased insurance, CAS 416 indicates - Insurance charge must take relevant experience
and expected conditions into account - Must be in accordance with accepted actuarial
principles - Outside quotes / broker indications are allowable
- May lessen risk of Government challenge if
estimate is performed by an actuary and true
ups are made (though not expressly required by
CAS, the DCAA - CAS Board and DCAAs position appear inconsistent
- Contractors should be aware of DCAAs
interpretation and recognize risk that DCAA may
challenge self-insurance accounting practice that
does not include true up adjustments - Contractors may use DCAAs favored practice to
lessen potential disagreement - Should clearly document practice in CAS
Disclosure Statement or other document - Consider agreements with the Contracting Officer
on cost measurement, e.g. through a Memorandum of
Understanding
50Allocation of insurance costs under CAS 416
Home Office
- Commonly allocated home office costs
- Purchased insurance
- Self-insurance
- Administrative costs
- Main allocation concepts
- 1.Insurance costs and losses allocated directly
to segments (to maximum extent possible) - 2.If not allocated directly to segments,
allocation base should reflect factors used to
determine premium or self-insurance charge - 3.Material administrative costs are to be
allocated same as related premium or
self-insurance charge
51DCAA Audit Guidance Allocation of Insurance Costs
- 1st and most important in determining if
insurance costs reasonable and/or allocable is to
review policy coverage - If policy provides coverage for general practice,
allocation of costs to all contracts through GA
generally acceptable - If policy provides unique coverage (e.g. for a
particular segment), costs should be allocated
directly to the benefiting cost object - Auditors may challenge allocations
- Auditor may review loss and claims experience to
challenge a broad-based allocation (GA) if can
determine policy provides unique coverage (e.g.
punitive affirmative wrap)
52Summary Government Contracts Insurance Costs
- Insurance accounting under government regulations
is complex and interpreting regulations can be
difficult - Insurance costs are generally recoverable under
government awards - Establishing well-defined processes and proper
accounting are key practices to achieve recovery
of insurance costs - Can be applied directly or conceptually to
non-Federal work. - Grants
- Cooperative Agreement
- State and Local Contracting Regulations
- The Contract itself
53Other Construction Issues During the Recession
- Prequalification of contract owners
- Verification of project financing
- Credit verification
- What entity is signing the contract?
- Prequalification of subcontractors
- Bonded subcontractors
- Credit report and review of financial statement
- Verification of payment of materials
54Other Construction Issues During the Recession
- Monthly meetings between project management and
accounting - Bid spread jobs
- Underbillings
- Claims or change orders
- Receivable and retainage collection - cash flow
report - Jobsite and office theft
- Cost control
- Labor reporting - daily time sheets
- Phase code comparisons
- Re-think every cost and expense
55IRS Audits Issues Strategies for Contractors
- IRS being directed to "greet" many more taxpayers
- A. Wall Street Journal column states that IRS
looks to audit 300,000 to 400,000 small to
mid-size businesses (5 million to 50 million
revenue) - B. Audits can consist of office review of tax
return (most returns) or full field audit - C. Appearance of return, large rounded numbers,
and confusing terminology can add to odds of full
field audit - D. Don't let the threat of an IRS audit change
the way you do business but be prepared if one
comes
56IRS Audits Issues Strategies for Contractors
- Intercompany and related party transactions
attract immediate attention - A. Document all related party transactions with
minutes, invoices, contracts and calculations - B. Be specific about intercompany payments. Use
Office Expense, Accounting Services or Shop
Costs vs. "Management Fees" or "Consulting
Fees. - C. Calculate exact amounts vs. round numbers
- D. Make payments monthly, quarterly, etc. vs.
during year end audit (adjustments at year end
appear to be manipulating profits) - E. Document related party business purpose (rent,
bond indemnity, loan guarantee, equity, or
working capital requirements)
57IRS Audits Issues Strategies for Contractors
- Audit technique is to review revenue and "cost of
goods sold" (direct costs) - A. Most auditors do not understand construction
- B. Make it easy for them. Prepare schedules and
statements that agree to tax returns. Give them a
file of documents that they can keep. - C. Auditors will review financial statements and
footnotes for relationships, claims filed and
disclosures - D. IRS will select a sample of contract activity.
They have been told that contractors use company
funds to build personal assets! - E. Accrued expenses (claims, workers comp.,
etc.) not paid by March 15 are not deductible.
Adjust costs to complete contracts instead. - F. Prepare look-back tax returns. Form 8697 for
company (or individual if company is an S
Corporation or LLC).
58IRS Audits Issues Strategies for Contractors
59IRS Audits Issues Strategies for Contractors
60IRS Audits Issues Strategies for Contractors
61- James C. Lundy, CPA
- Partner
- Davidson, Golden Lundy
-
- Charlie Woodman, CPA
- Risk Finance Advisory
- Willis National Construction
- 2011 Willis Construction Risk Management
Conference - April 21, 2011