Title: REPORT BY MALAYSIA


1
REPORT BY MALAYSIA
GTRP IMPLEMENTATION PLAN 2013-14 BANGKOK,
THAILAND 10 MARCH 2013
2
AGENDA 1 STRENGTHEN FRONTLINERS
  • The new Wildlife Conservation Act enforced in
    2011
  • Poaching of tiger max US166,000 and 5 years
    imprisonment
  • MIST based enforcement being implemented at
    Taman Negara NP and Endau Rompin NP by DWNP with
    the assistance of WCS, WWF MYCAT
  • MIST based patrol and 1NRE interagency patrols
    to be expanded at 3 priority tiger habitats in
    2014-15
  • Additional staffing for DWNP in 2014 for law
    enforcement and Tiger Unit

3
AGENDA 2 CONSERVE TIGER HABITAT DEVELOPMENT OF
ECOLOGICAL CORRIDORS
  • Tiger habitats mainstreamed into national spatial
    plan Central Forest Spine (CFS)
  • Protecting priority tiger habitats
  • Linking the priority tiger habitats
  • with rest of the tiger landscape
  • Developing 2 ecological corridors with 4
    wildlife viaducts for safe movement of wildlife
    including tigers in 2014-15

4
DEVELOPMENT OF ECOLOGICAL CORRIDORS
  • 2ND ECOLOGICAL CORRIDOR
  • 3 Wildlife Viaducts being built
  • Linking Taman Negara NP with western forest
    complex
  • Cost US28 million
  • Implementation 2012- 2014

2
TITIWANGSA
TAMAN NEGARA
5
DEVELOPMENT OF ECOLOGICAL CORRIDORS
  • 3RD ECOLOGICAL CORRIDOR
  • 1 Wildlife Viaduct being designed
  • Linking Belum State Park with southern forest
    complex
  • 19 Feb 2013 CFS Perak State Conference State
    Government announced the designation of 20,000ha
    along highway as corridor
  • Monitoring of tiger and wildlife by DWNP WWFM
  • Habitat enrichment by Forestry Department
  • Integrated Enforcement
  • Cost US18 million by Ministry of Natural
    Resources and Environment (NRE) Malaysia
  • Implementation 2013-15

3
6
MONITORING TIGER POPULATION AT BELUM CORRIDOR
7
INCORPORATING SGI FEATURES AT BELUM
  • Feb 2013 Engineering design presented
  • Late 2013 Construction starts

8
AGENDA 3 COMMUNITY ENGAGEMENT
  • 2013 about 100 locals will be trained as
    licensed nature guides for parks
  • Funding US70,000 from the Ministry of Tourism
    Malaysia

AGENDA 4 COLLABORATION AMONG TRCs
  • Belum State Park in Malaysia and Hala Bala PA
    in Thailand has been identified as trans-boundary
    PA
  • To be strengthened under the GEF funded PA
    Project in 2013-14

AGENDA 6 ACCELERATE FUNDING
  • Government US45 million for Ecological
    corridor US1.5 million for tiger survey at
    Taman Negara NP
  • UNDP GEF Funding for PA US5.6 million 2013-2019
    for CFS US9.6 million and expected to commence
    in 2014
  • WWF-M and WCS-M sourcing funding for national
    tiger survey in 2014-15

9
THANK YOU TERIMA KASIH