Title: Gantry meeting


1
FNAL Bonding
  • Statistics are shown for the last 17 modules
    (mini-production).
  • Wire bonding has been done on a dedicated KS
    8090 machine using a 2025 tool.
  • We expect that the change from RMT to Planar
    pitch adapters will greatly reduce the number of
    PA repairs.
  • RMT bond pad cleanliness has been an on-going
    issue.
  • Bonding time does not include inspecting and
    cleaning bond pads, test pulling every 50th
    sensor-to-PA bond, and post inspection of the
    wire bonds.
  • The total process time should come down to about
    30 minutes per module assuming better PA bond
    pads and much reduced destructive testing.
  • Long times in mini-production summary reflect
    some problems with the bonding machine.
  • Wire bond skipping is done by modifying KS files
    through a PERL script.

2
FNAL Bonding
Bonds are skipped for pinholes (Idiel) and
selected cases of Cac. ARCS testing following
bonding revealed no new pinholes (17K bonds).
3
FNAL Bonding
RMT PAs
US power adjusted based on results.
Sen-to-PA pull test data for odd-numbered
modules Units are in grams.