THE FAILURE OF SHIH-KANG DAM

Description:

THE FAILURE OF SHIH-KANG DAM by Amokomowo Aderemi Dawoud Adenaiye Oluwaleke CONTENTS Introduction Geology of the dam Failure of the dam Cause of failure Solutions ... – PowerPoint PPT presentation

Number of Views:409
Avg rating:3.0/5.0
Slides: 12
Provided by: evxm
Category:
Tags: dam | failure | kang | shih | the | geology | history

less

Transcript and Presenter's Notes

Title: THE FAILURE OF SHIH-KANG DAM


1
THE FAILURE OF SHIH-KANG DAM
by
Amokomowo Aderemi Dawoud Adenaiye Oluwaleke
2
Contents
  • Introduction
  • Geology of the dam
  • Failure of the dam
  • Cause of failure
  • Solutions adopted
  • Rehabilitation Process
  • Conclusion

3
Introduction
  • Shih-kang dam is located about 100km southwest of
    Taipei and built in 1977
  • Dam dimensions 357m long 25m high and 540m wide
    at the base
  • Reservoir Capacity 3.38million m3
  • Dam failed in 1999 as the first concrete dam to
    be directly damaged by the active fault in the
    history of the hydraulic structures

4
Geology of the dam
Geological Map of Shih-Kang map
  • The geology of the Shih-Kang Dam site is composed
    of about 6-meter thick deposition layer on the
    surface and the next is the soft bedrock of the
    Cho-Lan formation.
  • The deposition layer is formed by unconsolidated
    gravel, sands, silts and clay. The bedrock, soft
    and easily weathered, is mainly formed by
    slate-gray sandy-shale and silty-sandstones.

5
FAILURE OF THE DAM
  • Effects of the large ground motion.
  • Impact type damage.
  • Strong contact impact of every adjacent weir
    body during the earthquake.
  • Fault rupture type.
  • Most complicated type.

6
Cause of failure
  • Strong motion of earthquake
  • Remarkable rupture of fault
  • Large displacement of ground surface.

7
Solutions adopted
  • Construction of a new reservoir in the upstream
    of the Shih Kang Dam away from the Che-Lung-Pu
    fault
  • Rehabilitation work was carried out in an
    economic, efficient, and effective way.

8
REHABILITATION PROCESS
  • First phase
  •  
  • Repairing of the intake structure and the tunnel.
  • The ruined concrete lining tunnel was coated by
    steel pipe lining.
  • The wing wall of the left abutment was rebuilt.
  •  
  • Second phase
  • Repair the dam-body out of the fault aligning
    area.
  • The cement grouting was taken in the dam
    foundation.
  • Epoxy cement was injected into the cracks of the
    dam-body and stilling basin.
  • The new downstream tail dam was installed.
  • Third phase
  • To reserve the right part of the dam, which was
    located on the fault aligning area, to be a
    memorial of Chi-Chi earthquake.
  • To install a cofferdam in front of the right part
    of the dam.

9
RECOMMENDATION
  • Adequate Site Investigation
  • Construction Monitoring
  • Periodical Long term Monitoring

10
CONCLUSION
  • Dam failure caused strong motion of earthquake
    and remarkable rupture of fault
  • New dam construction away from the fault
    followed adequate site investigation after the
    failure