Folie 1 - PowerPoint PPT Presentation

1 / 10
About This Presentation
Title:

Folie 1

Description:

Title: Folie 1 Last modified by: IT Created Date: 5/27/2003 7:50:33 AM Document presentation format: Bildschirmpr sentation Other titles: Arial Standarddesign ... – PowerPoint PPT presentation

Number of Views:28
Avg rating:3.0/5.0
Slides: 11
Provided by: environ3
Category:
Tags: explosions | folie

less

Transcript and Presenter's Notes

Title: Folie 1


1
(No Transcript)
2
One of our most valuable goods is a clean
environment
3
This working with garbage destroy our
environment!! The Problems are
- Contamination
- Danger of disease and epidemics
- Rising costs which can no longer be financed
- Wasting of energy and raw materials
- Increasing protest among the population
4
The open landfill!
Faulting of the landscape by wind dispatch
Smell
Gas emission
Danger fire and explosions
Vermins
River
Contamination of the wells, rivers, and streams
and agricultural land
Groundwater
5
Solution 1 protected landfill
Faulting of the landscape by wind dispatch
Reduction of smell
Gas Siphon
River
Ground insulation
Sevage plant
Groundwater
6
Solution 2 Waste packing
7
This is modern waste management
Clean bales instead of dangerous stinking
landfills
Waste packing
Baled energy
Refuse collection
Creation of waste
Biomass
Recyclable materials
Energy
Valuable raw materials
Transport and suitability for storage
without environmental damage
Utilisation of the materials in waste by
seperation Into biological and recyclabele
materials
Utilisation of energy
Electricity and heat
Waste replaces fossil fueles reduction of
discharges of co2 and ch4
New energy Waste becomes a fuel
8
The functioning principle of the powerpack system
  • New technology conserves waste
  • crashing
  • compressing
  • packing
  • Round bales wrapped into foils are the result.
    The waste gets new qualities
  • Secure for the environment
  • Moveable without faulting
  • Smell free
  • no wind dispatch
  • Storage on reduced area

9
The economic aspects
Costs of the plant 2.5-3.5 Mill. ca.
10-12 Mill.
Investments for the City 0 ca. 10-12 Mill.
Storage costs per ton 25 22-24
Annual total costs 1.35 Mill. 1.18 Mill.
loan costs
Acreage for 500.000 tons 5 ha 15 ha
Costs for country purchase for the City 15 ha
Construction time 2 Monate 48 Monate
Expansion without further costs
Maintains calorific value (approx. 200 l
Oil/ton)
Mobile usable
Forward- looking
10
The recultivation of old dumps
Pre-sorting and intermediate storage
Mechanical treatment Mobile plants for
processing, separation, metal eliminate and
packing for the transport
Thermic utilisation with Incineration
facilities (power-heating systems)
Ash
Cold Treadment Addition of lime ash and mineral
sludge (e.g. gravel washing residue) conditions
and immoveable
Electrical and heating delivery
Write a Comment
User Comments (0)
About PowerShow.com