Collaborative Decision Making - PowerPoint PPT Presentation

About This Presentation
Title:

Collaborative Decision Making

Description:

Collaborative Decision Making Module 8 Collaborative Leadership Traffic Flow Management System (TFMS) Data Exchange Agreements: Operations Planning Telcon ... – PowerPoint PPT presentation

Number of Views:325
Avg rating:3.0/5.0
Slides: 13
Provided by: Bett106
Category:

less

Transcript and Presenter's Notes

Title: Collaborative Decision Making


1
  • Collaborative Decision Making
  • Module 8
  • Collaborative Leadership

2
Global Collaboration
  • FAA discusses CDM tools, procedures,
    technologies, and philosophy which enhance
    safety, increase efficiencies and capacities at
    airports and en route sectors.
  • ATCSCC International Operations working with ICAO
    and numerous regions to promote CDM on a global
    level in an effort to open dialogue and
    information sharing, linking ANSPs and/or states
    with the stakeholder community.
  • ATCSCC International Operations is in the process
    of collaborating with ICAO on a global ATFM
    manual which incorporates CDM as a integral
    process. This manual will become an official ICAO
    document.

3
Global Collaboration
  • EUROCONTROLS SEARSAR / FAAs NextGen
    collaboration for harmonization.
  • ATCSCC/CFMU exchange program, NATs, JFK
  • ATCSCC/CCFMEX/NOC
  • Hurricane Telcons, Volcanic Ash Telcons
  • FAA working with ICAO and various air navigation
    service providers (ANSP) to educate and foster
    the concept of CDM

4
Traffic Flow Management System (TFMS) Data
Exchange Agreements
  • Canada
  • Mexico
  • COCESNA, Panama, Colombia, Chile
  • Dominican Republic, Trinidad Tobago
  • Future (Brazil)
  • Japan
  • EUROCONTROL
  • United Kingdom

5
CCFMEX
6
BOGOTA ATFM
7
BRAZIL ATFM
8
(No Transcript)
9
CFMU (EUROCONTROL)
10
JAPAN
11
Planning TELCON
Goals To provide a consistent, concise overview
of the current activities and constraints in the
National Airspace System (NAS) Propose and
collaborate strategies to address
forecast/current conditions that are, or may,
impact elements of the NAS
12
Operations Planning Telcon
  • Opening
  • Introduction of Planner and Assistant
  • Planning TELCON Time
  • Current Operations Plan Advisory Number
  • Tactical Updates
  • Constraints and CCFP are not briefed
  • Urgent Items
  • New initiatives that require immediate action and
    discussion

13
Operations Planning Telcon
  • Collaborative Convective Forecast Product
  • CCFP products are developed through collaboration
    between the National Weather Service, FAA Center
    Weather Service Units, and Customer meteoroligcal
    departments
  • The CCFP product is the recognized as the
    exclusive thunderstorm forecast for convective
    activity and the planning of initiatives for
    expected thunderstorm activity

14
Collaborative Convective Forecast Product
15
Operations Planning Telcon
  • General Discussion Item Protocol
  • Proposed items are identified as Possible,
    Probable, or Expected
  • AFP/Routes are discussed first
  • Existing, then proposed
  • Terminal issues are addressed from East to West
  • New terminal issues are addressed after existing
    Plan items
  • New terminal initiatives are added to the Plan in
    geographical order from East to West

16
Operations Planning Telcon
  • AFP
  • Brief existing AFPs
  • Discuss proposed AFPs
  • Routes
  • Brief existing routes
  • Discuss proposed routes
  • Terminal issues
  • Brief/discuss initiatives that exist in the plan
  • Discuss new proposed terminal issues

17
Operations Planning Telcon
  • Brief VIP Movement (715 EST/EDT only)
  • Request additional items
  • FAA Facilities and CNOC
  • Customers
  • Closing
  • Indicate that the TELCON is terminating
  • Advise of next TELCON time
Write a Comment
User Comments (0)
About PowerShow.com