Title: Tender Call on GNSS Tools
1Javier Pérez Bartolomé Service Provision and
Performance javier.perez-bartolome_at_ec.europa.eu Eu
ropean Commission TREN-G3
2TENDER TOPICGalileo 2008-2.1.1 Simulators and
Tools
- General Overview and Context
- Purpose of the Contract
- Overall Logic and WP BS
- Tasks Description
- Eligibility Criteria for the Bidders
- Financial and Admin Aspects
3General Overview and Context
1/2
- GNSS Simulation and Testing Facilities are Key
Enablers for application and receiver downstream
industry - The accesibility to this infrastructure should be
ensured to any European user - A coordinated approach is expected to provide a
better service to end users - A definition study on the potential harmonisation
of the European GSTI has been launched recently
(SCENIC - FP7 1st Call)
4General Overview and Context
2/2
FP7 1st Call Study on Harmonisation SCENIC
5- General Overview and Context
- Purpose of the Contract
- Overall Logic and WP BS
- Tasks Description
- Eligibility Criteria for the Bidders
- Financial and Admin Aspects
6Purpose of the Contract
1/2
- Development of a networking platform which
establishes a single entry point to the European
Testing Labs - Preliminary Mission Concept for GSTI V1
- Simplified access point for European users
interested in GNSS testing services - Enhance communication and coordination of actors
(users, GNSS centres, etc) - Dynamic management of available information on
European GNSS testing facilities - Provide web-based helpdesk service to the user
community - Potentially become hosting platform for publicly
owned GNSS analysis and simulation SW tools
7Purpose of the Contract
2/2
- GSTI V1 System is conceived as
- A centralised entry point to the European GNSS
Testing Infrastructure - A networking platform that should improve the
coordination between European initiatives
8- General Overview and Context
- Purpose of the Contract
- Overall Logic and WP BS
- Tasks Description
- Eligibility Criteria for the Bidders
- Financial and Admin Aspects
9Overall Logic and WP Breakdown Structure
1/2
- Definition and Development of the GSTI V1
Platform - Task 2 USER AND SYSTEM REQUIREMENTS
- Task 3 SYSTEM DESIGN AND DEVELOPMENT
- Task 4 INTEGRATION AND TEST
- System OpsMaintenance, Awareness and Promotion,
collection of User Feedback and Evolution to GSTI
V2 - Task 5 INITIAL OPERATIONS AND MAINTENANCE
- Task 6 USER SUPPORT, FEEDBACK COLLECTION AND
AWARENESS - Task 7 PLATFORM EVOLUTION AND FINAL PLATFORM
DELIVERY - Task 8 TECHNICAL STUDY ON ACCESIBILITY TO EC/GSA
SW TOOLS
10Overall Logic and WP Breakdown Structure
2/2
T09
T0
T03
T07
T014
T018
11- General Overview and Context
- Purpose of the Contract
- Overall Logic and WP BS
- Tasks Description
- Eligibility Criteria for the Bidders
- Financial and Admin Aspects
12Tasks Description
1/8
Task 1 Management
- Overall management of the contract
- Expected outputs
Project Milestone Review Schedule
Kick-Off Meeting KOM T0
System Requirements Review SRR T0 3
Critical Design Review CDR T0 7
Factory Acceptance Test FAT T0 9
Platform Evolution Readiness Review PERR T0 14
Final Acceptance Review FAR T0 18
Ref Title
D1.1 Project Management Plan
D1.2.x Status Report
D1.3 Final Report
13Tasks Description
2/8
Task 2 User and System Requirements
- Definition of user and system specification for
the GSTI V1 platform - Analysis of outcomes produced in the GSTI
definition study - Survey and assessment of COTS tools which may
eventually used to support the implementation of
the system - Expected outputs
Ref Title
D2.1 User Requirements Document (URD)
D2.2 System Requirements Document (SRD)
D2.3 Survey Report on IT COTS tools
14Tasks Description
3/8
Task 3 System Design and Development
- Develop logical and physical design for GSTI
platform - Use of COTS SW solutions should be favoured
- Prepare integration activities and define test
cases - Expected outputs
Ref Title
D3.1 Architectural Design Document (ADD)
D3.2 Design Justification File (DJF)
D3.3 Ext. Interface Control Document (ICD)
D3.4 Inventory of IT COTS HW/SW
D3.5 Preliminary delivery of web GUI
Ref Title
D3.6 Integration and Test Plan
D3.7 Configuration Management Plan
15Tasks Description
4/8
Task 4 Integration and Testing
- Achieve system integration
- Complete (successfully!) the full test battery
according to plan - Populate tools database
- Prepare operations and maintenance plan
- Eventually make the system available to the user
community - Expected outputs
Ref Title
D4.1 Integration and System Test Report
D4.2 GSTI V1 Platform
D4.3 GSTI V1 User Manual
Ref Title
D4.4 GSTI V1 Initial Operational Procedures
D4.5 GSTI V1 Maintenance Plan
16Tasks Description
5/8
Task 5 Initial Operations and Maintenance
- Procurement of hosting, operations and
maintenance services for the GSTI platform from
qualification (FAT) to end of activities (FAR) - The contractor shall keep the system alive
during the whole duration of this task - Further develop operational procedures
- Expected outputs
Ref Title
D5.1 Observation and Non Conformance Reports
D5.2.x Periodical reports on Operations
D5.3 GSTI V2 Operational Procedures
17Tasks Description
6/8
Task 6 User Support, Feedback Collection
Awareness
- Support users through a helpdesk
- Collect and synthesize user feedback to be taken
into account for service improvements to be
implemented in a new system release - Promote the developed system by attending key
conferences and/or establishing a user forum - Expected outputs
Ref Title
D6.1 GSTI User and Facilities feedback report
D6.2 Report on conducted awareness activities
D6.3 Delta features for next system release (GSTI V2)
18Tasks Description
7/8
Task 7 Platform Evolution and Final Platform
Delivery
- Develop a new version of the tool taking into
account feedback collected during the initial
operations phase - Address additional system evolutions and
recommendations in an GSTI service roadmap - Expected outputs
Ref Title
D7.1 GSTI V2 Platform
D7.2 GSTI V2 User Manual
D7.3 GSTI Service Roadmap
D7.4 System Test report GSTI V2
D7.5 Hosting Site Interface requirements
19Tasks Description
8/8
Task 8 Technical Study on Accessibility to
EC/GSA Tools
- Assess suitability of the GSTI platform to
provide public access to EC/GSA owned tools - Analyse implementation options for some specific
tools (effort limited to 2 or 3 cases) to be
proposed at KO - Expected outputs
Ref Title
D8.1 TN on integration of EC/GSA SW RD tools in the GSTI web portal
20- General Overview and Context
- Purpose of the Contract
- Overall Logic and WP BS
- Tasks Description
- Eligibility Criteria for the Bidders
- Financial and Admin Aspects
21Eligibility Criteria for the Bidders
- Thorough understanding of global satellite
navigation systems and augmentation technologies - Thorough understanding of the simulation and test
field in satellite navigation main public and
private actors, institutional framework,
facilities, tools, etc. - Outstanding background on design, development and
integration of IT systems and network features. - Sound experience on the development of web-based
applications and knowledge management databases. - Sound experience in operations of web-based
distributed networks and systems. - Good knowledge of the GNSS user community needs,
present applications, trends, etc., especially
related to simulation and testing activities.
22- General Overview and Context
- Purpose of the Contract
- Overall Logic and WP BS
- Tasks Description
- Eligibility Criteria for the Bidders
- Financial and Admin Aspects
23Financial and Administrative Aspects
- Firm Fixed Price Contract 100 Funded by EC
- Indicative Budget 500.000 Euro
- Duration of the contract 18 Months
- Call for Tender to be released soon
- It will be announced in the usual communication
channels
24Thank you for your attention!
- Javier Pérez Bartolomé
- javier.perez-bartolome_at_ec.europa.eu
- European Commission DG TREN G3