Title: HYDROENERGY IN ALBANIA
1HYDROENERGY IN ALBANIA
NATIONAL AGENCY OF NATURAL RESOURCES
Tirana, September 22nd, 2008
2HYDROGRAPHIC AREA
- The hydrographic territory of Albania has a
surface of 44,000 km2 or 57 more than the
national area of our country - The average height of the hydrographic territory
of Albania is very large, about 700 m above sea
level - The average perennial total inflow of Albanian
rivers is about 1,245 m3/s - All our rivers running to the sea about 40
billion water cubic meter/year
3HYDRO RESERVES IN ALBANIA
River Length km Catchment area km2 Average flow. m3/s
Buna 41 5.187 320
Drini 285 14.173 352
Mati 115 2.441 103
Ishmi 74 673 20,9
Erzeni 109 760 18,1
Shkumbini 181 2.441 61,5
Semani 281 5.649 95,7
Vjosa 272 6.706 195
4PHASES OF ELECTRICITY DEVELOPMENT
- During the years 1945-1951, it was produced in
average 10 KWH per resident. - In 1952, was put in operation the Hydropower
Plant (HPP) of Selita, with installed power 5 MW. - In January 1958, was put in operation the HPP of
Ulza, with installed power 25 MW. - In 1970, were put in operation HPP of Shkopeti,
HPP of Bistrica I and HPP Bistrica II, with
installed power 51.5 MW. - In 1971-1978, were put in operation HPP of Vau i
Dejës and Fierza, 750 MW. - In 1985, was put in operation HPP of Koman, 600
MW.
5ELECTRICITY DEVELOPMENT PHASES
- Actual situation
- 6 big HPP 1426.5 MW
- 36 small HPP 33.9 MW
- Main generation base
- Cascade on Drini river 1350 MW
- Cascade on Mati river 49 MW
- Cascade on Bistrica river 27.5 MW
- Possibilities for water potentials utilization
- Theoretical potential energy 4500 MW
- Exploited potential 1465.5 MW
6POWER GENERATION AND INSTALLED CAPACITIES CHART
OF BIG SCALE HYDRO POWER PLANTS
7DRINI RIVER
MAIN RIVERS AND THEIR HYDROPOWER POTENTIAL IN
ALBANIA
- Drini river derives from Ohri lake of Macedonia
running to Adriatic Sea - Hydropower potential
1750 MW - On Drini river are actually constructed
- Vau i Dejes HPP, with installed capacity 250 MW
- Fierza HPP, with installed capacity 500
MW - Komani HPP, with installed capacity 600 MW
- Project-proposals under the concession issue
procedure - Skavica HPP, with installed capacity 350 MW. It
is an unsolicited proposal of TGK Kinglor
consortium. They are actually preparing Terms of
Reference and standard documents for Skavica HPP
bid. - Ashta HPP, with installed capacity 50 MW, is at
the end of concession contract negotiations to
the Austrian Verbund Company.
VAU I DEJES HPP
FIERZA HPP
KOMAN HPP
8MAIN RIVERS AND THEIR HYDROPOWER POTENTIAL IN
ALBANIA
MATI RIVER
- Mati river derives from Burreli and Peshkopia
areas running to the Adriatic sea. - Hydropower potential 112 MW
- On Mati river, actually, are constructed
- Ulza HPP, with installed capacity 25 MW
- Shkopeti HPP, with installed capacity 24 MW
9DEVOLLI RIVER
MAIN RIVERS AND THEIR HYDROPOWER POTENTIAL IN
ALBANIA
- Devolli river derives from Devolli and Korca
areas running to Adriatic Sea after its bundling
with Osum river. - Hydropower potential 350 MW
- On Devolli river, actually, is constructed Banja
HPP, with projected capacity 60 MW. It is not
finished yet. There are only performed 40 of
works before the year 1990. - Project-proposals under the concession issue
procedure - Concession obtaining of HPPs cascade on
Devolli river by Austrian EVN AG Company.
10OSUMI RIVER
MAIN RIVERS AND THEIR HYDROPOWER POTENTIAL IN
ALBANIA
- Osumi river is the main branch of Semani one. Its
total length is 161 km. The water-accumulation
surface is 2150 sq km and 828 m above the sea
level. - Project-proposals under the concession issue
procedure - It is under way working on technical and
economic feasibility study of projects for HPPs
construction on Osumi river, which will be
notified from the Albanian Government as
solicited proposals.
11VJOSA RIVER
MAIN RIVERS AND THEIR HYDROPOWER POTENTIAL IN
ALBANIA
- Vjosa River derives from Pindi mountains of
Greece. - Hydropower potential ? 400 MW
- On Vjosa river actually is constructed Kalivaçi
HPP, with installed capacity 90 MW, that has
obtained the concession by BEG-Energy Company and
Deutch-Bank. - Project-proposals under the concession issue
procedure - Its under way working on technical and
economic feasibility study of projects for HPPs
construction on Vjosa river, which will be
notified from the Albanian Government as
solicited proposals.
12BISTRICA RIVER
MAIN RIVERS AND THEIR HYDROPOWER POTENTIAL IN
ALBANIA
- Bistrica River derives from Delvina (Saranda),
area and Blue Eye Spring Source running to Jonian
Sea - On Bistrica river actually are constructed
- Bistrica 1 HPP, with installed capacity 20 MW
- Bistrica 2 HPP, with installed capacity 5 MW
13SMALL HYDRO POWER PLANTS IN ALBANIA
- There are 90 SHPP in Albania, with installed
capacity from 20 kW to 9200 kW, which are
constructed before the year 1990. Among them, are
put in operation only 36 SHPP. - The average long life of SHPP is about 25 years.
- SHPPs equipment are made in Austria, Germany,
China, Hungary and Italy. Some spare parts of
them are made in Albania. Type of turbines are
Frencis, Pelton and Banki. - From all SHPP results
- 32 HPP, with installed capacity 24.4 MW have
obtained the concession issue procedure. - 16 HPP, with installed capacity 2 MW are owned by
private companies - 42 HPP, with installed capacity 12.5 MW are owned
by state.
14ACTUAL ADMINISTRATIVE STATUS OF SHPP
15ACTUAL ADMINISTRATIVE STATUS OF SHPP
16LEGAL FRAMEWORK
- Law No. 9663 dated on 18/12/2006 On
concessions - Ministers Council Decision No.27, dated on
19/1/2007 On approval of rules for evaluation
and concession procedures, changed with MCD No.
87 dated on 16.01.2008 - Ministers Council Decision No.150, dated on
22/03/2007 For the organization and function of
Concessions Treated Agency (ATRAKO). - Minister decision No.536, dated on 27/07/2007 On
regulations approval for the administration of
the documents and requests for concessionary
agreements and Bonus evaluation criteria - Law No.8987, dated on 24.12.2002 On facilitating
conditions establishment for new power generation
resources construction - Law No.7970, dated on 20.07.1995 On Arrangement
of Electricity Sector, changed with Law No.9072,
dated on 22.05.2003 changed recently with the
Law No. 9913, dated on 05.05.2008 For some
adding and changes in Law No. 9072 - Law No. 7764, dated on 02.11.1993 On foreign
investments - Law No 8093 dated on 21.03.1996 On water
reserves
17IMPLEMENTATION OF THE LAW ON CONCESSIONS IN
HYDROPOWER SECTOR
- 120 are unsolicited proposals
- 27 are concessionary contracts approved by
Ministers Council Decision, with total installed
capacity 125 MW and power generation of 602
GWh/year - It is under way negotiating the concession
contract of HPPs construction on Devolli river,
with installed capacity 350 MW -
- It is almost finished negotiating the concession
contract of Ashta HPP, with installed capacity
44 MW-70 MW
18THANK YOU FOR YOUR ATTENTION
- Marjana Çoku
- HYDROPOWER DEPARTMENT
- Marjana.coku_at_akbn.gov.al
www.akbn.gov.al