STATE ESTIMATOR QUALITY TRACKING IN BC Hydro EMS IMPLEMENTATION - PowerPoint PPT Presentation

About This Presentation
Title:

STATE ESTIMATOR QUALITY TRACKING IN BC Hydro EMS IMPLEMENTATION

Description:

STATE ESTIMATOR QUALITY TRACKING IN BC Hydro EMS IMPLEMENTATION Dr. DJORDJE ATANACKOVIC, P.Eng. Engineering Team Leader, Power system Applications, Grid Operations ... – PowerPoint PPT presentation

Number of Views:92
Avg rating:3.0/5.0
Slides: 18
Provided by: drs112
Learn more at: http://www1.ece.neu.edu
Category:

less

Transcript and Presenter's Notes

Title: STATE ESTIMATOR QUALITY TRACKING IN BC Hydro EMS IMPLEMENTATION


1
STATE ESTIMATOR QUALITY TRACKING IN BC Hydro EMS
IMPLEMENTATION
  • Dr. DJORDJE ATANACKOVIC, P.Eng.
  • Engineering Team Leader, Power system
    Applications, Grid Operations Support

2
STATE ESTIMATOR GENERAL PERFORMANCE REQUIREMENTS
  • CONVERGENCE SUCCESS RATE OF 98
  • COST FUNCTION IN THE RANGE OF 8000 11000
    (2500 BUSES, 4000 ANALOG MEASUREMENTS)
  • TOTAL GENERATION ERROR lt 40 MW
  • TOTAL INTERCHANGE ERROR lt 10MW
  • MAX. MW BUS MISMATCH lt 50MW
  • TOTAL LOAD ALLOCATION ERROR lt 400MW

3
STATE ESTIMATOR QUALITY MONITORING NEW INDICES
  • TOTAL LOAD ALLOCATION ERROR
  • TOTAL MW, MVAR LINE FLOW RESIDUAL PER MEASUREMENT
  • TOTAL MW, MVAR INJECTION RESIDUAL PER MEASUREMENT
  • TOTAL VOLTAGE AND CURRENT RESIDUAL PER
    MEASUREMENT

4
STATE ESTIMATOR QUALITY MONITORING TOTAL LOAD
ALLOCATION ERROR
  • CALCULATED AS A SUM OF LOAD RESIDUALS FOR ALL
    LOADS IN BC HYDRO AREA
  • LOAD RESIDUAL IS A DIFFERENCE BETWEEN ESTIMATED
    LOAD AND ALLOCATED LOAD
  • BC HYDRO PERFORMANCE CRITERIA
  • TOTAL LOAD ALLOCATION ERROR SHOULD NOT EXCEED 600
    MW MAXIMUM
  • AVERAGE LOAD ALLOCATION ERROR OVER A PERIOD OF
    ONE YEAR SHOULD NOT EXCEED 400 MW

5
STATE ESTIMATOR QUALITY MONITORING TOTAL MW,MVAR
LINE FLOW RESIDUAL PER MEASUREMENT
  • CALCULATED AS A SUM OF MW/MVAR LINE FLOW
    RESIDUALS FOR ALL MEASUREMENTS IN THE CONSIDERED
    ZONE DIVIDED BY NUMBER OF MEASUREMENTS
  • THREE ZONES ARE USED FOR THIS TRACKING
  • TRANSMISSION (230 KV AND ABOVE)
  • SUBTRANSMISSION (60 138KV)
  • DISTRIBUTION (BELOW 60 KV)
  • BCTC PERFORMANCE CRITERIA FOR A PERIOD OF ONE
    YEAR
  • TRANSMISSION - BELOW 7 MW
  • SUBTRANSMISSION - BELOW 15 MW
  • DISTRIBUTION - BELOW 20 MW

6
STATE ESTIMATOR QUALITY MONITORING TOTAL MW,MVAR
INJECTION RESIDUAL PER MEASUREMENT
  • CALCULATED AS A SUM OF ALL INJECTION RESIDUALS IN
    A CONSIDERED ZONE DIVIDED BY NUMBER OF
    MEASUREMENTS IN THE ZONE
  • BCH PERFORMANCE CRITERIA FOR A PERIOD OF ONE
    YEAR
  • TRANSMISSION BELOW 3 MW
  • SUBTRANSMISSION - BELOW 7 MW
  • DISTRIBUTION - BELOW 10 MW

7
STATE ESTIMATOR QUALITY MONITORINGNORMALIZED
RESIDUALS
  • ENABLES RANKING OF MEASUREMENTS OF DIFFERENT
    TYPES (MW, MVAR, AMPS, KV) BASED ON A NORMALIZED
    INDEX
  • BCH PERFORMANCE CRITERION
  • NORMALIZED RESIDUAL GREATER THAN 10 UNITS
    INDICATES A MEASUREMENT OF A LOWER QUALITY
  • NEEDS IMPROVEMENT DOES NOT REFLECT ERRORS OF
    GENERATOR UNIT MEASUREMENT AND OTHER INJECTION
    MEASUREMENTS

8
STATE ESTIMATOR QUALITY MONITORINGCONSISTENCY OF
VOLTAGE STABILITY REGION
9
STATE ESTIMATOR PERFORMANCE TRACKING
  • TRACK SOLUTION QUALITY INDICES IN PI
  • IMPROVE ONLINE SEQUENCE DISPLAY TO INCLUDE ALERT
    SIGNALS (FLASHING APPLICATION STATUS BOXES)
  • MONITOR IMPACT ON OTHER APPLICATIONS E.G. VSA
  • PERFORM REGULAR REAL TIME TELEMETRY QUALITY
    ANALYSIS AND PRODUCE TELEMETRY QUALITY REPORTS
  • ISSUE TELEMETRY CALIBRATION REQUESTS
  • RTNET SOLUTION INVALIDATED IF QUALITY MEASURES
    OUTSIDE PERFORMANCE LIMITS

10
BASIC QUALITY INDICES
11
AVERAGE MEASUREMENT RESIDUALS
12
(No Transcript)
13
(No Transcript)
14
(No Transcript)
15
(No Transcript)
16
(No Transcript)
17
QUESTIONS?
Write a Comment
User Comments (0)
About PowerShow.com