PARTIE II - PowerPoint PPT Presentation

About This Presentation
Title:

PARTIE II

Description:

PARTIE II Introduction la Mod lisation & l Optimisation Mod le GPIM vs GRP Optimisation Overhaul Policy B-H Antinomie selon le REX pour la ... – PowerPoint PPT presentation

Number of Views:29
Avg rating:3.0/5.0
Slides: 56
Provided by: Eric
Category:

less

Transcript and Presenter's Notes

Title: PARTIE II


1
PARTIE II
  • Introduction à la Modélisation
  • à l Optimisation
  • Modèle GPIM vs GRP
  • Optimisation  Overhaul Policy B-H 
  • Antinomie selon le REX pour la modélisation
    MC/MP GPIM_PLP vs GPIM_LLP

2
REF 1 cf.Generalized proportional intensities
models for repairable systems. By D.F. PERCY
B.M. ALKALI. Journal of Management
Mathematics(2006) 17,171-185.
3
(No Transcript)
4
REF 2 cf. Discontinuous point processes for the
analysis of repairable units .By R.CALABRIA G.
PULCINI. International Journal OF Reliability,
Quality and Safety Engineering (1999) Vol.6,
N.4, 361-382.
5
REF 3P_PLP ? cf.Practical Methods for Modeling
Repairable Systems with Time Trends and Repair
Effects. by H. GUO, W. ZHAO A. METTAS.
IEEE(2006).L_LLP ? cf.A New Stochastic Model for
Systems Under General Repair. by H. GUO, W. ZHAO
A. METTAS. IEEE(2007).
6
BASELINE MODELS
7
? With the power-law intensity baseline
functionLog Likelihood SIMPLE SYSTEM TYPE I
PARTIAL REPAIR (CM ?? (PERCY) , ? (GUO) , ?
(CALABRIA))
8
GRAPHIQUE par CALCUL ANALYTIQUE du modèle
P_PLP/PIM_PLPP_PLP?_,t_ (-1/?)Log(1-??t?
)? 3, ? 0.001.
? Exp-?
9
? With the log-linear intensity baseline
functionLog Likelihood SIMPLE SYSTEM TYPE I
PARTIAL REPAIR (CM ?? (PERCY) , ? (GUO) , ?
(CALABRIA))
10
Log Likelihood MULTI- SYSTEMS TYPE I
(1/2)PARTIAL REPAIR (CM ? ? (GUO))
11
Log Likelihood MULTI- SYSTEMS TYPE I
(2/2)PARTIAL REPAIR (CM ? ? (GUO))
12
(No Transcript)
13
ESTIMATIONS
14
GRAPHIQUES du C.I.F.
15

16
(No Transcript)
17
OPTIMISATION du REMPLACEMENT
18
OPTIMISATION du REMPLACEMENT
19
OPTIMISATION du REMPLACEMENT
20
(No Transcript)
21
(No Transcript)
22
INFLUENCE SUR L OPTIMISATION
23
(No Transcript)
24
(No Transcript)
25
VALIDATION dun MODELE HPP
26
VERIFICATION
27
VALIDATION dun MODELE GRP
C
?
?
28
RE-ANALYSE
LK_HPP - 152.85 AIC_HPP 307.7 BIC_HPP 309.52
29
(No Transcript)
30
(No Transcript)
31
(No Transcript)
32
(No Transcript)
33
GENERALIZED PROPORTIONAL INTENSINTIES
MODELSWhitout Covariates Log Likelihood
SIMPLE SYSTEM GPIM ( CM ? ? PM ? ? )
34
EXAMPLE I ? SIMPLE SYSTEM (General Repair)cf.
Scheduling preventive maintenance for oil pumps
using generalized proportional intensities models
by D.F. PERCY B.M. ALKALI. International
Transactions in Operational Research. 14 (2007)
547-563.
35
ESTIMATIONS
36
ESTIMATIONS  AUTEURS 
37
EXAMPLE I I ? SIMPLE SYSTEM (General
Repair)Cf. A pratical method of predicting the
failure intensity of hydropower generating
units.By X. QIAN Y. WUIEEE 2011
38
ESTIMATIONS
39
ESTIMATIONS  AUTEURS 
40
EXAMPLE III ? SIMPLE SYSTEM (General
Repair)Cf. Bayesian Prediction of the Overhaul
Effect on a Repairable Systemwith Bounded
Failure Intensity.(International Journal of
Quality, Statistics and Reliability 2010).

41
ESTIMATIONS
42
ESTIMATIONS  AUTEURS 
43
(No Transcript)
44
(No Transcript)
45
(No Transcript)
46
(No Transcript)
47
(No Transcript)
48
(No Transcript)
49
(No Transcript)
50
(No Transcript)
51
OPTIMISATION de la M.P.
52
GPIM_PLP ? LK_V - 28.4311 ? 1.13678e-14, ?
7.68063, ?c 0.291656, ?p 0.432698

53
GPIM_PLP ? LK_V - 28.4311 ? 1.13678e-14, ?
7.68063, ?c 0.291656, ?p 0.432698

54
SIMULATION MONTE-CARLO DU MODELE GPIM_PLP
55
(No Transcript)
Write a Comment
User Comments (0)
About PowerShow.com