FPDS-NG Agency Day July 21, 2003 - PowerPoint PPT Presentation

1 / 37
About This Presentation
Title:

FPDS-NG Agency Day July 21, 2003

Description:

Title: Global Computer Enterprises Author: David Lucas Last modified by: Administrator Created Date: 3/26/2002 5:01:21 PM Document presentation format – PowerPoint PPT presentation

Number of Views:38
Avg rating:3.0/5.0
Slides: 38
Provided by: DavidL260
Category:
Tags: fpds | agency | day | july

less

Transcript and Presenter's Notes

Title: FPDS-NG Agency Day July 21, 2003


1
FPDS-NGAgency DayJuly 21, 2003
2
Recent Activities
  • Specifications
  • Product Development
  • Change Management

3
Specifications
  • Specifications published for Agency review on
    www.FPDSNG.com
  • Web services specifications
  • XML specifications
  • Reviewed by IAE and GSA

4
Product Development
  • Hardened the Reference Implementation from
    prototype to production quality code
  • Increased functionality of FPDS-NG
  • IDV
  • Reference data
  • System Administrator functions
  • Portal
  • Modifications
  • Corrections/Voids
  • Enhanced reporting
  • Batch processing
  • FPDS data migration

5
Change Management
  • Outreach efforts to Agencies and vendors underway
  • Briefings scheduled with
  • DOT
  • DHS
  • EPA
  • Briefings held with
  • USCG
  • DOD
  • State
  • Commerce
  • IRS
  • AMS
  • CACI
  • Compusearch
  • VA
  • HUD
  • Interior

6
Product Demonstration
  • System Administration
  • Data Collection
  • Reports

7
Lunch Break
8
Integrated Systems
  • USCG Finance Procurement Desktop (FPD)
  • USCG PRISM
  • DOD CACI
  • DOI Procurement Desktop (PD)
  • HUD HPS

9
Early Adoption Integration Methodology
  • Meet with Agency and technical representatives
  • Visualize the existing and desired architecture
  • Review of feeder systems and data warehouses
  • Agreement on timeline and resource availability
  • Review by Agency technical staff of
    specifications
  • Determination of key integration points in source
    system(s)
  • Technical support as needed from GCE staff
  • Integration testing
  • This is an accelerated version of the FPDS-NG
    Agency Integration Plan

10
Integration Methodology
11
USCG FP Desktop
  • Current/Proposed Integration Architecture
  • Technology
  • Integration Method
  • Duration
  • Demonstration
  • Q/A

12
Current Architecture
13
(No Transcript)
14
Integration
  • Technology
  • Web HTML/Java
  • Government owned system
  • Integration Method
  • GUI Object
  • Duration
  • 1 week

15
Demonstration
16
PRISM
  • Current/Proposed Integration Architecture
  • Technology
  • Integration Method
  • Duration
  • Demonstration
  • Q/A

17
(No Transcript)
18
(No Transcript)
19
Integration
  • Technology
  • Web ASP (Microsoft)
  • COTS product
  • Integration Method
  • GUI Object
  • Duration
  • 3-4 days

20
Demonstration
21
CACI DOD
  • Current/Proposed Integration Architecture
  • Technology
  • Integration Method
  • Duration
  • Demonstration
  • Q/A

22
(No Transcript)
23
(No Transcript)
24
Integration
  • Technology
  • Progress
  • COTS product
  • Integration Method
  • GUI Object
  • Duration
  • 2 days

25
Demonstration
26
DOI Procurement Desktop
  • Current/Proposed Integration Architecture
  • Technology
  • Integration Method
  • Duration
  • Demonstration
  • Q/A

27
(No Transcript)
28
(No Transcript)
29
Integration
  • Technology
  • PowerBuilder 6.5
  • COTS product
  • Integration Method
  • GUI Object
  • Duration
  • 2 days

30
Demonstration
31
HUD HPS
  • Current/Proposed Integration Architecture
  • Technology
  • Integration Method
  • Duration
  • Demonstration
  • Q/A

32
(No Transcript)
33
(No Transcript)
34
Integration
  • Technology
  • PowerBuilder 6.5
  • Government owned system
  • Integration Method
  • GUI Object
  • Duration
  • 1 day

35
Demonstration
36
In Progress
  • IRS GOTS
  • Commerce CACI
  • DOD Ed. CACI

37
Next Steps
  • FAC Briefing July 29, 2003
  • FQT July 30 August 5, 2003
  • System Administrator Training August
Write a Comment
User Comments (0)
About PowerShow.com