Title: IGS Contribution to ITRF
1IGS Contribution to ITRF
- Zuheir Altamimi Xavier Collilieux
- IGN, France
2Outline
- IGS/GPS contribution to ITRF
- Some lessons from ITRF2005
- IGS network and loading effects
- Polar motion
- Constraints
- Network effect
- Origin and Scale from GPS ?
- Repeatability Internal precision
- Conclusion
3GPS Contribution to the ITRF
- Strengths
- Enforces the link between SLR and VLBI
- Precise polar motion
- Acces to ITRF and its densification via IGS
products - Geographic density Improve plate motion estimate
NNR condition implementation - Weaknesses
- Discontinuities due to equipement changes
- Antenna PCVs
- Imprecise TRF origin and scale ? Something to
improve here ?
4Current ITRF Derivation
Step 1
S1 S2
S3
Sn
VLBI
TRF (X, V) EOP (SINEX)
W1
W2
Wn
SLR
TRF (X, V) EOP (SINEX)
Stacking
W1
W2
Wn
GPS
TRF (X, V) EOP (SINEX)
W1
W2
Wn
DORIS
TRF (X, V) EOP (SINEX)
Combination ITRF
Local Ties
Step 2
TRF (X, V) EOP (SINEX)
5ITRF2005 Distribution and number of the IGS
stations
X
Percentage of stations
Y
Z
Number of stations
6ITRF2005IGS weekly WRMS
7Loading effects on IGS network
WRMS 2D
WRMS - UP
Synthetic data
Loading
8Loading effects on IGS network
WRMS - UP
WRMS 2D
Synthetic data
Loading
LoadingFlicker Noise
According to Williams et al., 2004 variance
values, rescaled by 60
9Loading effects on IGS network
WRMS - UP
WRMS 2D
Synthetic data
Loading
LoadingFlicker Noise
LoadingFlicker NoiseMes. Noise
10Loading effects on IGS network
Synthetic data
Real data
Loading
IGS combined
LoadingFlicker Noise
LoadingFlicker NoiseMes. Noise
11Network effect evaluated using a loading model
(Tonie van Dam)Comparison with IVS and ILRS
network
East
North
Up
VLBI
SLR
GPS
12IGS weekly WRMS
Week 1400
13Week 1400 effect
Week 1400
14EOP constraints ? Ex from DORIS
Polar motion differences wrt IGS
DORIS IGN Free solution
DORIS LCA EOP Continuity conditions added
15Network effect on EOPsChange the RF Core sites
by 10 sites
Main difference Drift Xp 2 µas/yr Yp 1 µas/yr
16TRF Origin Scale from GPS ?
17IGS Reprocessed solutions Origin Scale
18Some Origin Scale after W1400
19Impact of Orbit Parameters on TRF
4 weeks from ESOC Default 18 orbit parameters
fixed Free 9 CODE RPRs are free
20GPS PDR Origin Scale wrt ITRF2005
21Repeatability Internal Precision
22IGS Reprocessing Repeatability Internal
Precision
ESA
GFZ
MIT
PDR
23IGS Reprocessing Repeatability Internal
PrecisionCombined solutions
24PDR vs IGS weekly WRMS
PDR
IGS
25Conclusions
- Loading effects
- GPS/IGS contains some noise, esp. at early dates
- GPS/IGS network effect 1 mm /yr in the Up
component - EOPs
- Avoid continuity constraints
- Network effect on the long-term 2 µas/yr
- Repeatability (weekly) 2 4-5 mm Horizontal
Up - Origin and Scale from GPS ?
- Origin Agreement betwenn ACs 5mm in X Y and 10
mm in Z - Origin Orbit parameters impact the Z component
- Scale after W1400 from reprocessing AC
agreement at 0.5 ppb - Next ITRF GPS Reprocessing is absolutely needed