TrigMoore: Status, Plans, Possible Milestones - PowerPoint PPT Presentation

About This Presentation
Title:

TrigMoore: Status, Plans, Possible Milestones

Description:

TrigMoore: Status, Plans, Possible Milestones Moore in HLT- status and ongoing work Package under the CVS directory: Trigger/TrigAlgorithms/TrigMoore A sort of ... – PowerPoint PPT presentation

Number of Views:30
Avg rating:3.0/5.0
Slides: 7
Provided by: MIKI70
Category:

less

Transcript and Presenter's Notes

Title: TrigMoore: Status, Plans, Possible Milestones


1
TrigMoore Status, Plans, Possible Milestones
2
Moore in HLT- status and ongoing work
  • Package under the CVS directory
    Trigger/TrigAlgorithms/TrigMoore
  • A sort of interface between online and offline
    reconstruction
  • It works in the HLT framework
  • Two main working modes
  • Seeded
  • Reconstruction starting from RoI of previous
    levels.
  • Wrapped
  • Full reconstruction, equivalent to the offline
    working mode
  • Uses the package MuonIdentification to recontruct
    (extrapolate) the track back to the interaction
    point (MuID standalone)

3
On Going work
Moore
  • Debug of Muon vertical slice
  • Using the Muon features filled by LVL2
  • Up to now, the seeded mode has used only LVL1
    informations
  • A first setting of the MuonVerticalSlice, that
    uses LVL2 informations (muFast) has been
    implemented and it is under test

LVL2 (muFast)
LVL1
4
Whats next?
  • From close next to far next.
  • Combined Reconstruction
  • Use of Inner Detector(iPatRec) and MuidCombined
    in order to match tracks from the Inner Detector
    and from the Muon Spectrometer and eventually
    perform a global fit. Ongoing work (foreseen to
    have a first working version by end of February
    leader Michela (Napoli)
  • Reconstruction starting from ByteStream format
    Ongoing work (foreseen to have a first working
    version by the second half of February a
    collaborative work MichelaGabriellaKeteviStefan
    o
  • Moore in TestBed (expression of interest from
    Pavia group Diana, Max)
  • Finalized for the Combined testbeam (a possible
    milestone ? )
  • Application of Steering
  • Analysis for trigger rates using the muons
    vertical slice LVL1-LVL2-EF with single muons
    (Lecce, Napoli)
  • RegionSelector Map extended to Endcaps and to
    TGC/CSC technologies (Alessandro/Roma1,
    Gabriella/Lecce) end of February first half of
    March
  • A first round on evaluation of executions times
    and study of possible improvements. Isolation of
    possible time consuming methods and optimization
    (Gabriella/Lecce Moore Offline group) (to start
    parallely with offline optimization, after 8.0.0
    before 9.0.0 DC2)

5
To do
  • Evaluation of performance degradation as a
    function of background intensity and probability
    of fakes reconstruction (rejection studies)
  • Preliminary study OFFLINE
  • with pile-up ( 100GeV bkg) (Margherita/Lecce) -
    DONE
  • fakes from K/p (GianPaolo/Napoli) -DONE
  • Reproduce the studies in TrigMoore (ONLINE)
  • with pile-up (Margherita/Lecce) On Going
  • Fakes studies are dependent on the availability
    of MuIDCombined
  • Feedback for offline reconstruction
  • Use of LVL2 informations from Tile ( At offline
    level there is work in progress inside the Moore
    group) (? Some work could start parallely)

6
Next and hopefully almost ready to start
  • Second round of optimization of time performance
    and algorithms
  • Use of LVL2 infos not used by now.
  • Access to calibrated data (accessing times and
    impact on reconstruction performances)
  • EndCaps extensions (not foreseen a large impact)
  • Evaluation of Trigger rates for complex (physics
    events).
  • Trigger Menu and reconstruction strategy as a
    function of time/performance
  • Cosmics rays and commissioning phase
Write a Comment
User Comments (0)
About PowerShow.com