Title: Task Story Board
1Task Story Board
- A Corde Lane Brian Roberts Production
2Task Steps
- RPCM
- Grasp and actuate Microconical Fixture (MEE)
- ECU
- Release Keyway Slot Bolts (BBD)
- Grasp Tether Loop (TLG)
- Release Connector Bolt (RAD)
- APFR
- Grasp and rotate Latch Quarter Turn Rings (AQP)
- Release Latch Bolts (BBD)
- Unlock Pitch Lock Knob (AQP)
- Rotate Lower Body Probe (BBD)
- Lock Pitch Lock Knob (AQP)
- Grasp Yoke (TLG)
- Squeeze Detent Levers (APG)
3RPCM - MEE grasps microconical fixture
4RPCM - MEE grasps microconical fixture
5ECU - BBD actuates keyway slot bolt
6ECU - BBD actuates keyway slot bolt
7ECU - RAD on base bolt, TLG on Tether Loop
8ECU - RAD on base bolt, TLG on Tether Loop
9APFR - AQP on Quarter Turn Ring at BP Latch
10APFR - BBD on Boot Plate Latch Bolt
11APFR - BBD releases body latch
12APFR - BBD begins probe rotation
13APFR - BBD completes probe rotation
14APFR - TLG on Yoke, APG on Detent Levers
15APFR - TLG on Yoke, APG on Detent Levers