Title: Sponsored Projects Post Award Administration
1Sponsored Projects Post Award Administration
- ASD Academy Presentation
- May 17, 2004
2Setting the Stage
- For I am mindful that scientific achievement is
rooted in the past, is cultivated to full stature
by many contemporaries and flourishes only in a
favorable environment. No individual is alone
responsible for a single stepping stone along the
path of progress, and where the path is smooth,
progress is most rapid. - --Ernest Orlando Lawrence
3Agenda
- Sponsored Project Award Administration
Environment and Research Team Responsibilities
(Phyllis Gale) - The Sponsored Project Awards and the SPAA Package
(Phyllis Gale) - Post Award Administration Non Financial
(Phyllis Gale) - Post Award Administration Financial (Phyllis
Gale) - Project Costs and Billing (Jerry Kekos)
- Cash/Funding Management (Sallie Frainier)
- Closeout (Andre Bell, and Lisa Rebrovich)
- Award Management Report and
- E-Notifications,
4Award Administration Environment
- FY2003 1,158 Funding Actions resulting in
118.2M of funding - FY2003 - there was 927 active Sponsored Project
Awards with 285 different sponsors - FY2003 - there were 347 new sponsored project
awards with 163 different sponsors - Every Berkeley Lab Scientific Division has at
least one active sponsored project award - Sponsored Project Awards represent about 25 of
the Labs research funding
5Award Administration Environment
- The research is accomplished
- by dedicated research
- teams typically composed of
- PI
- Divisional Administration
- Sponsored Projects Office
- Finance
- Other Central Functional Administrative Units
- Procurement, Property Management, Patents.
Technology Transfer, EHS, Human and Animals
Regulatory Commission, Records and Archives,
Human Resources, and Internal Audit
6Award Administration Environment
- Sponsored research is conducted in a regulated
environment that come from a multitude of
different sources - Federal Government as represented by the U.S.
Department of Energy through Contract 98 - The University of California
- Berkeley Laboratory
- Terms and conditions of our agreements with the
Sponsors
7Award Administration Environment
- All members of the research team are responsible
for the conduct of research in a prudent and
ethical manner through - understanding relevant laws, regulations,
contract and grant requirements pertaining to
research administration - ensuring compliance
8Award Administration Environment
- What happens if there are violations of policy or
regulation occurs during the course of a
sponsored project, what are the consequences? - More scrutiny by sponsors and audit agencies,
corrective action plans, more regulations,
potential fines and penalties, potentially
disallowed costs, harm to the health and safety
of individuals, and harm to Berkeley Labs
reputation.
9Responsibilities of the Research Team Principal
Investigator
- UC Contract and Grants Manual defines Principal
Investigator as the individual with primary
responsibility for - The scientific integrity and management of the
project - The financial management of the project funds
- Adherence to all applicable DOE and University
policies and - Adherence to externally imposed sponsor terms and
conditions including reporting, deliverables, and
record keeping requirements contained in the
award documents - UC Contract and Grants Manual
- Chapter 10 Internal University Administration
10Responsibilities of the Research Team Division
Accountabilities for the PIs Performance
- Division Directors are accountable for the
performance of LBNL PIs under their supervision.
Basic responsibilities include - Determining an individuals eligibility for PI
status - Determining the consistency of the proposed
project with the objectives of the organizational
unit
11Responsibilities of the Research TeamDivision
Accountabilities for the PIs Performance
- Determining the appropriateness and acceptability
of research personnel, space, equipment, and LBNL
financial commitments contained in the proposals
for sponsored projects - Assuring the project performance is consistent
with DOE and UC policies along with externally
imposed sponsor terms and conditions. - UC Contract and Grants Manual
- Chapter 10 Internal University Administration
12Responsibilities of the Research Team -
Divisional Administration
- Supports PI in post award administration
- Works with the PI, SPO, Finance and other
functional organizations to ensure compliance
with award terms and conditions, DOE, University,
Laboratory, and Sponsor policies - Initiate transactions to support research
13Responsibilities of the Research TeamSponsored
Projects Office
- UC Contract and Grants Manual divides the
responsibility for contracts and grants between
their Sponsored Projects Offices and the
Principal Investigators - The Berkeley Laboratorys Sponsored Projects
Office is the only office responsible for the
formal legal obligations related to the
solicitation and acceptance/execution of
extramural funding as delegated by DOE and the
University of California - UC Contract and Grants Manual
- Chapter 10 Internal University Administration
14Responsibilities of the Research Team Sponsored
Projects Office
- Authorizes Sponsored Project Awards
- Negotiates the award and the required sponsor
approvals during the course of post award
administration - Partners with the PI, Division Administration,
Finance and other functional organizations to
ensure compliance with award terms and
conditions, DOE, University, Laboratory, and
Sponsor policies
15Responsibilities of the Research Team Accounting
and Budget
- Partners with the PI, Division Administration,
Sponsored Projects Office and other functional
organizations to ensure compliance with award
terms and conditions, DOE, University,
Laboratory, and Sponsor policies - Bills and receives payments from the Sponsor
- Negotiates and sets Burden Rates and provides
guidance for budget formulation - Interfaces to DOE to assure the Financial Mod to
Contract 98 contains sufficient resources for the
award expenditures
16Responsibilities of the Research Team Other
Functional Central Administration Organizations
- Partner with PI, SPO, and Divisional
Administration to ensure compliance with award
terms and conditions, DOE, University,
Laboratory, and Sponsor policies - Reviews and validates transactions to support
research
17Sponsored Project Awards
- All Sponsored Project Awards are part of the DOE
Work for Others Program - A Sponsored Project Award is can be defined as
- Externally funded by a Non-DOE HQ Sponsor
- Governed by terms and conditions specified in a
written agreement between the sponsor and DOE or
UC/Lawrence Berkeley National Lab - Governed by regulations set out by DOE, the
University, and Berkeley Laboratory
18Sponsored Project Award Components
- Statement of Work
- Budget
- Deliverables
- Disposition of Property
- Sponsored Project Award Agreement with terms and
conditions - A Finite Period of Performance
- Detailed Fiscal Responsibility with the
expectation to return of funds at the end of the
period of performance
19Sponsored Project Award Authorization
- Only the Sponsored Projects Office has DOE and
University of California delegation to accept
Sponsored Project Awards - If a PI, divisional administration or others
receive original award documentation, it should
be immediately forwarded to the appropriate SPO
Contracts Officer so it can be reviewed, conduct
negotiations (if required), and authorize the
award.
20Sponsored ProjectsAward Package
- When is an award authorized and when can the
science begin? - No Award may be authorized nor expenditures
incurred until an award has been fully executed
by either DOE or LBNL/SPO, all other requirements
are met (i.e. advance payment received) and
authorized by SPO. - What is an Award Package?
- The Award Package consists of a Sponsored Project
Award Authorization and a copy of the agreement
along with other documentation that SPO may
include (i.e. copy of advance check).
21Sponsored ProjectsAward Package
- What is a Sponsored Project Award Authorization
(SPAA) - It is a report from the RAPID system with
specific information highlighted for the
administration of the award. - It is issued by SPO to authorize initial award
and post award administrative and funding actions - Additional funding (including incremental)
- Changes to the Award (including scientific,
administrative, financial, and no cost
extensions) - It is issued by Accounts Receivable for
deobligations and refunds based on final invoices
and financial reports.
22Reviewing the Award Package and Opening a Project
- Review the SPAA
- Review the Agreement
- Additional Documentation
- Note if the Sponsor has a separate administrative
manual (i.e. NIH) for additional terms and
conditions governing the award - Call your SPO CO if you have
- Questions!
23Terms and Conditions to Review
- Committed Funding Amount and Payment Method
- Period of Performance
- Property
- Publications
- Intellectual Property and Rights in Data
Integrity - Statement of Work for Deliverables
- Any restrictions or unusual terms that were noted
in the SPAA
24 Terms and Conditions
- The Agreement and/or the sponsors administrative
manual can contain requirements for - prior approvals for administrative actions
including foreign travel, change in PI, PI
absence from the Lab, change in Key Personnel,
change in scope of work, addition of Human and/or
Animal Subjects to Research, RD Subcontracts,
budget expenditures, purchase of equipment, etc. - And without prior approval
- the costs could become
- potentially unallowable costs.
- And balance with the cost
- principles of Contract 98
25Post Award Administration
- Deviation from Award Terms and Conditions
- If in the course of research there is any
deviation from the terms and condition,
consultation with the SPO CO is required to
determine if prior approval by the Lab or the
Sponsor is necessary and if the award should be
amended. - If it is implemented prior to sponsor approval
and amendment of the agreement (if required), the
costs may be unallowable. - Prior approval requests must be in writing and
include the endorsement of the SPO CO. - Sponsor approvals must be in writing (including
e-mails) and must be on file in the SPO File
26Post Award Administration
- Human and Animal Subject Approvals Approvals
are required to be current throughout the life
cycle of the award. Adding Human and/or Animal
Subjects to research is a change in scope of work
and must be approved for the research award prior
to commencement. - Some sponsors (i.e. NIH) require prior approval
for this type of change in the scope of work - Lapses in approval, not obtaining approval, or
not obtaining prior approval may result in
unallowable costs - Questions? Contact EHS/HARC
- http//www.lbl.gov/ehs/health_services/harc/hsc.s
html
27Post Award Administration
- Conflicts of Interest
- Research and Consultant Agreements
- When there is evidence of a potential conflict of
interest situation between an employee's personal
affairs and Laboratory work, policy requires an
independent substantive review of all aspects of
the matter. - Questions? Contact the Laboratory COI
Coordinator - http//www.lbl.gov/LBL-Work/RPM/R2.20.htmlRTFToC8
- Human Subjects
- Researchers who have an independent role must
submit a Checklist for Conflict of Interest for
Human Subjects at the time of submitting a
protocol - Questions? Contact EHS/HARC
- http//www.lbl.gov/ehs/health_services/harc/hsc.sh
tml
28Post Award Administration
- Procurements POs and RD Subcontracts, and
Consultant Agreements - A purchase order or subcontract (including NIH
Consortium Agreement) cannot exceed the current
committed funding amount or the expiration period
of the parent award. - Work with Procurement to establish incrementally
funded agreements that will mirror the parent
award - Some Sponsors (i.e.) require prior approval
before an issuance of a research subcontract or
consultant agreement
29Post Award Administration
- Equipment
- Check the agreement and the proposal budget
regarding equipment and sponsor administrative
manual - Must have funding for entire purchase price
committed in the award prior to making the
purchase - Some Sponsors require prior approval before
equipment at a specific threshold can be
purchased - Example NIH Grants Title vests with UC/LBNL -
Prior approval to purchase equipment over 25K
is required - NonFederal Standard Agreements equipment over
5,000 vests with the Sponsor (NOT DOE). If the
equipment was not budgeted for at the time of
proposal and the LBNL PI would prefer to have DOE
hold title, then the agreement will have to be
amended to reflect the action. - If not, at the end of the period of performance,
the Sponsor can request that the equipment be
sent to the Sponsor at the Sponsors expense
30Post Award Administration
- Change in Scope of Work
- If there is a substantial change, PI should
discuss with Sponsor - Change in Scope of Work includes changes in
research plan, introduction of human subjects,
introduction of animal use, application of a new
technology, etc. - Some Sponsors (i.e. NIH) require that written
prior approval to be received prior to all
instances of change in the scope of work - The Agreement should be amended to reflect the
change in direction and Sponsors approval. - If approval is not received, the costs of the
research conducted may be unallowable.
31Post Award Administration
- Change in Principal Investigator or Key Personnel
Status - If the PI plans to leave the Laboratory or will
be absent for a considerable period of time, then
the Sponsor should be contacted so there is an
orderly transition of research both
scientifically and administratively. - Some Sponsors (i.e. NIH) require that written
prior approval change in PI or Key Personnel be
reviewed and approved prior to the action take
place. - The Agreement should be amended to reflect the
change in PI and Sponsors approval. - If approval is not received, the costs of the
research conducted may be unallowable.
32Post Award Administration
- Publications If the PI has been asked by the
Sponsor to restrict it may violate LBNLs ability
to publish to an extent that it violates the
Laboratory Policy on the Dissemination of
Research Results. - The Laboratory Directors approval must be
obtained prior to agreeing to the requested
change.
33Post Award Administration
- Intellectual Property If the PI has been asked
by the Sponsor to handle the disposition of
Intellectual property differently that in the
agreement, the agreement may need to be amended.
Only SPO COs can amend an agreement changing IP
terms in consultation with DOE and other LBNL
departments. - Rebudgeting Some Sponsors (i.e. NIH) require
prior approval if expenditures deviate from the
budget that was approved at the time of the
award. Consult with SPO CO if determine if there
is a rebudgeting requirement associated with your
award.
34Post Award Administration
- Additional Funds If additional funds are needed
and were not approved in the original proposal, a
new proposal and amendment of the agreement will
be required. LBNL cannot unilaterally spend
funds beyond the current contractual limitations.
Continuation funding can be requested through
the Bridge Funding policy. Only when Bridge
Funding is approved and authorized through the
issuance of a SPAA can continuation funding be
expensed. - No Cost Extension If additional time is needed
to complete the work as proposed, the agreement
will need to be amended formally. LBNL cannot
unilaterally work beyond the current contractual
period.
35Objectives of Good Research Management
- To make the best use of available funds to
achieve research outcomes - To avoid problems of fraud, waste and abuse of
sponsor support
36Cost Principles Under Contract 98
- All awards are subject to the Cost Principles of
Contract 98. - The sponsor may include more restrictions in the
agreement. - Any cost being charged to a Sponsored Project
Award must satisfy the following Criteria
37Cost Principles Under Contract 98
- ALLOWABLE All costs must be allowable under
Contract 98 and/or the terms of the particular
award - ALLOCABLE The cost must be allocable, that is,
the award which paid the expense must benefit
from it. - REASONABLE The expense must be reasonable, that
is, the cost reflects what a prudent person
might pay.
38Cost Principles Under Contract 98
- If costs are not allowable, allocable, and
reasonable, then they may not be charged to a
Sponsored Project Award. - In addition, all costs should be handled
consistently across the Laboratory. If a cost is
usually charged to a burden, then it cannot be
charged to an award. - LBNLs list of Unallowable costs under Contract
98 can be found at - http//www.lbl.gov/Workplace/FSM/UnallowableCosts.
htm
39Effort Reporting
- Sponsors expect to pay only for those portions of
employee effort that are actually devoted to
their projects. - Periodically, government and internal auditors
review our payroll charges to enforce this
expectation. - In conducting these audits they are assessing
whether the salary charged to project accounts is
for effort that appropriately benefited those
projects. Auditors are checking the accuracy of
payroll charges by verifying that the percentage
of the employee's salary charged to a sponsored
project account reasonably approximates the
actual proportion of the employee's FTE effort
which was devoted to that project.
40Cost Accounting Standards
- A contractors practices used in estimating costs
in pricing a proposal shall be consistent with
his cost accounting practices used in
accumulating and reporting costs. - A contractors cost accounting practices used in
accumulating and reporting actual costs for a
contract shall be consistent with his practices
used in estimating costs in pricing the related
proposal - Excepted from 48 CFR Part 9904
41Project Costing and Billing
42Responsibilities
43Bottom Line
- Principal Investigator
- Ultimate Scientific Responsibility
- Ultimate Budget Responsibility
- Division Analyst, Budget Office, Controller,
Accounts Receivable and Sponsored Projects Office - Advisor
- Facilitator
- Monitor
44Principal Investigator
- Manages award within funding and time limits
- Assures charges are allowable reasonable
- Responsible for personnel assignments
- Approves the Subcontract requisition
- Agreement
- Payment
- Ensures Sponsor pre-approvals are in place before
event execution - Re-budgeting
- Key personnel
- Human/Animal
- Exercises responsible fiscal control
- Ensures compliance and reports non-compliance
- Responsible for training
- Financial
- Administrative
45Division Analyst
- Serves as an Advisor
- Reviews and understands the Awards Terms and
Conditions. - Assures the that all award costs are treated
consistently with regard to direct and indirect
allocation and Cost Accounting Standards. - Transactions are within the award funding
(contract value), available cash balances, and
period of performance. - Reasonableness of cost of the transactions
- Reasonable allocation of the cost
46Division Analyst
- Serves as a Facilitator
- Processes financial transactions (i.e. certifies
invoices). - Reviews and analyzes financial reports for
sponsored awards - Prepares documents and provides information for
re-budgeting if required by Sponsor. - Prepares requests for Resource Adjustments (cost
transfers) and validates for posting by
Accounting. - Prepares documents and provides information for
compliance with effort reporting (such as "NIH
Other Support") on the sponsored award
47Division Analyst
- Serves as a Monitor
- Project Costing
- Ensures the correct burden codes and other
attributes are assigned to the proposal and the
project. - As project nears closure a greater importance is
placed upon monitoring certain costs - Equipment
- Subcontracts
- Large supply expenditures
- Closely track funds in vs. cost expenditures-
request bridge when needed and appropriate - All Costs must be in support of the project.
- Billing
- One of the Division Analysts most important role
is working with the PI and others to get the
costs associated with an award right before it is
invoiced. - Tools to Manage
- Cost Browser
- Award Management
- Soft Closes
48 - Budget Office
- Pre-audit selected financial transactions
- Provide institutional oversight on resource
adjustments - Perform risk analysis? ensure compliance
- Reports instances of financial non-compliance
- Controller/Accounts Receivable
- Prepare invoices to sponsors in timely basis
- Prepare interim financial reports (with
Divisions) - Approve or recommend approval of unexpended fund
carry-forward - Assists P.I. Divisions with procedural
questions (billing payments) - Proactively interacts with Sponsor during
collection process - Reports instances of Financial non-compliance
49Sponsored Projects Office
- Authorizes Award Funding in RAPID and Distributes
a SPAA - Assists P.I. with procedural management of active
research projects - Reports instances of non-compliance
50Points to Remember
- Provide a seamless operation
- Everyone clearly knows what their roles are as
well as how they fit into the larger picture - Nothing gets
- passed,
- punted or
- dropped
- Be Proactive
- Take Responsibility
- Partner with other functional groups
- Ignorance is not bliss
51Sponsored Projects Post Award Administration
- Accounts Receivable (AR) responsibilities
- Billing cycle
- Invoice types
- Final invoice
- Funding and award management
- Unbilled and bridge funds
- Cash management and procedures to alleviate
negative cash position on non-federal awards
52Sponsored Projects Post Award Administration
- Accounts Receivable Responsibilities
- Billings to sponsors
- Collection activities
- Invoice and advance payment application
- final invoicing sponsors 90 days after project
completion - Refunds of any unused funds to sponsors
- Various financial status reports to sponsors and
DOE
53Sponsored Projects Post Award Administration
- Monthly cutoff for resource adjustments 25th of
the month - Each month on Day 2 of the monthly close, 29th
of the month, the Project Cost (PC) to Billing
interface runs - This process gathers the project costs (up
through cutoff) charged to the award and creates
invoices - Invoices are sent five days working days after
month-end - Invoices are due upon receipt
54Sponsored Projects Post Award Administration
- Most federal agencies are invoiced and make
payment via electronic means using the electronic
Intra-governmental Payment and Collection (IPAC)
system - National Institutes of Health (NIH) payments are
via electronic drawdown - Certain Department of Army awards payments are
made quarterly - DOE Integrated Contractors (other DOE Labs)
payments are via transfer vouchers but shortly
invoices will be created and payments submitted
via check or electronic funds transfer (EFT)
55Sponsored Projects Post Award Administration
- At the end of an award AR works with SPO and
Divisions to ensure all final costs are in,
awards and projects are closed, and final
invoices are submitted by the 90 day point
(typical time period for final invoices) - Refunds of unused monies are processed and
usually take 90 days - The refund amount is requested from Department
of Treasury via DOE
56Sponsored Projects Post Award Administration
- Contract specific closing procedures are found
at - http//www.lbl.gov/Workplace/CFO/SPO/Closeouts/Cl
oseout_Body.htm
57Sponsored Projects Post Award Administration
- Proper funding management of sponsored research
requires close coordination between P.I.,SPO,
Divisions, and AR - Ultimately the P.I. has responsibility for all
aspects of award management including funding,
budgeting, spending and closeout - Incurring costs greater than funding or past the
awards period of performance is against federal
regulations and results in unbilled costs
58Sponsored Projects Post Award Administration
- The following is a list of unbilled types
- Costs exceed contract The contract is within
Period of Performance (POP) but total cost is
higher than total funding - Credit costs The contract is within POP but the
invoice payment plus advance paid/or total
receipts is higher than total cost - Past POP with funds The contract is past POP
but there is advance paid/or total receipts
available to offset costs - Past POP, no funds The contract is past POP
- but there is no advance paid/or total receipts
available to offset costs - Review Requires further research to determine
reason for costs in unbilled
59Sponsored Projects Post Award Administration
- Resolution of unbilled costs should be initiated
at the Division level and requires either an
additional increment of funding from sponsor,
extension of the period of performance, or
removal of the costs to the appropriate project - Bridge funding must be requested in order to work
prior to receipt of advance funds or continuation
of work in excess of funding - Bridge funding is provided by UC and the lab has
a total allocation of 2.7M - To request bridge funding, fill out a bridge
funding request form and submit to the Budget
Office. Contact Budget with procedural questions - Cash management requires that costs not exceed
the cash received to date on the award (advance
invoice payments)
60Sponsored Projects Post Award Administration
- To request bridge funding, fill out a bridge
funding request form and submit to SPO - The form is located at http//www.lbl.gov/Workplac
e/FSM/FSMDeptsandCriticalLinks.htm - The bridge funding policies and procedures are
under review by the CFO organization and will be
changing. Any changes in procedures will be made
known to you shortly
61Sponsored Projects Post Award Administration
- Cash management requires that costs not exceed
the cash received to date on the award (cash
advances invoice payments) - Currently DOE is scrutinizing sponsored project
work to determine if laboratories are in a
financially vulnerable cash position - In order to ensure the Lab is not in a vulnerable
cash position LBNL is stepping up the collection
practices by coordinating closely with the P.I.,
Division, and SPO - Important Note Delinquent payments primarily
occur on non-federal sponsors. Most federal
sponsors payments come either automatically
through drawdowns or other electronic means
62Sponsored Projects Post Award Administration
- 30 days past due phone call and dunning notice
to sponsor by AR. Calls logged into PeopleSoft
AR Conversations - 60 days past due phone call and second dunning
notice to sponsor by AR. Calls logged into
conversations. AR will notify SPO CO and
Division Analyst if there are issues - 90 days past due Third dunning notice sent and
notification to SPO CO and Division Analyst. SPO
issues a notice (via fax) to sponsor that payment
must be received by end of month or work will be
suspended
63Sponsored Projects Post Award Administration
- Division Analyst will let P.I.know that SPO will
contact sponsor regarding possible suspension of
work. All calls logged into Conversations - 120 days AR notifies SPO CO and Division
Analyst that work should be suspended and the
projects closed effective first day of the
following month if payment not received - SPO issues written notice via fax to sponsor that
work has been suspended and a termination notice
will be sent in 30 days if the payments have not
been received
64Sponsored Projects Post Award Administration
- Division Analyst informs P.I. That SPO will
contact sponsor regarding termination and
suspension of work. Calls logged into
Conversations. - 150 days AR manager follows up with the sponsor
to collect payment and notifies SPO CO and
Division Analyst if sponsor has not paid - SPO issues a termination notice via fax to
sponsor on 150th day that the award is terminated
on the 165th day
65Sponsored Projects Post Award Administration
- 180 days - AR supervisor notifies SPO CO and
Division Analyst that the award is being
submitted to DOE/Treasury for collection - AR will notify all parties if payment received.
It would have to be decided on a case by case
basis to continue research with the sponsor and
under what conditions to minimize the financial
risk to LBNL.
66Sponsored Projects Post Award Administration
- Some tools to assist you
- Award Management Report
- Monthly 737 report located on \\Issnov7\fsdata\Pub
lic\777rpt\FY04 - Monthly Invoice Aging Report located on
- \\Issnov7\fsdata\Public\Aging_Report
- Roles Responsibilities Matrix located on SPO
website - PeopleSoft AR Conversations (Go/Manage Sales
Activity/Collect Receivables/Use/Conversations.
Input Customer ID. Notes section available for
read/write)
67Award Expiration and Closeout
- Managing Award expiration and closeout was
reviewed at the RAPID Meeting on 3/19/04. - Closeout usually entails the following
- Financial Reporting and/or Final Invoice
- Scientific Reports and Deliverables
- Intellectual Property Reporting
- The roles and responsibilities and procedures can
be accessed at - http//www.lbl.gov/Workplace/CFO/SPO/Closeouts/Clo
seout_Body.htm - Update on the Internal LBNL WFO/CRADA Closeout
Checklist
68Award Expiration and Closeout
69Award Expiration and Closeout
- Tools to manage award expiration includes
- Award Management Report
- Monthly 737 report located on GPublic/777rpt
- E-Notifications for Award Expiration and Closeout
70Award Management Report
71E-Notifications
- Costs Exceed Award Funding (Contract Value) or
Occur After the Period of Performance - 25 of Funding Remaining.
- Costs have Exceeded Funding.
- Costs have Exceeded Funding thru a complete
accounting cycle and Award and Projects close. - Award Expiration and Closeout
- Award Expiration e-notices sent 90, 60, and 30
days prior to end of the period of performance. - Email Notification for Award Closeout sent one
day after the expiration date.
72E-Notifications
- When will the E-Notifications start?
- May, 2004
- Initial e-mails will be captured on a
spreadsheet and sent to Division Analysts for
review, comments and action. - Who will receive E-Notifications?
- PIs
- Division Analysts (Managed through Smartlists)
- SPO CO assigned to the award
- AR at the time of Award and Project Closeout
73Negative Funding
- If the award remains in a negative funding
position, the award and project will close on the
first of the month following 30 continuous days
in a negative position within a one month
accounting period.
April May June
4/1/04
5/1/04
6/1/04
Award goes negative 4/15/04
Award remains negative through 5/31/04
Award and Projects Close effective 6/1/04
74Questions?