PDO NORM Management System - PowerPoint PPT Presentation

About This Presentation
Title:

PDO NORM Management System

Description:

PDO NORM Management System Brett Young Specification SP 1170 Version .3.0 Defines responsibilities Est. Dose limits Inc. NORM Radiological Surveys into the PTW ... – PowerPoint PPT presentation

Number of Views:183
Avg rating:3.0/5.0
Slides: 13
Provided by: pdoCoOmhs
Category:

less

Transcript and Presenter's Notes

Title: PDO NORM Management System


1
PDO NORM Management System
  • Brett Young

2
Specification SP 1170 Version .3.0
  • Defines responsibilities
  • Est. Dose limits
  • Inc. NORM Radiological Surveys into the PTW
  • Training
  • Transport and Storage Locations
  • Emergency Procedures
  • Incorporates NORM Management Guidelines

3
SP 1170
  • PDO Policy
  • Plant that has conveyed or stored production
    fluids (water/oil) or gas are potentially NORM
    contaminated.
  • Dose Limits
  • 1 mSv/year for PDO workers contractors
  • NORM Guideline CSM.001 provides guidance on
    action limits
  • Inhalation / Ingestions Limits
  • 5 cps above background - PPE

4
NORM Management Guidelines
  • Based on Syrian Guidelines
  • How to.. guidelines
  • Inc. NRS in PTW for consistency of approach
  • Added flow charts for specific activities
  • Modified to include PDOs meters

5
HEMP - Permit To Work
  • Production oil/gas/water - conveyed/stored
  • Trips PTW which requires a NORM Radiological
    Survey (NRS)
  • Measurements conducted by RPT
  • Recorded and attached to PTW
  • NRS stipulates controls
  • e.g. PPE, Supervised/Controlled Areas.

6
Example - Zauliyah
  • Measurements for Tank T7402
  • Ground 5 µSv/hour (450 - 500 cps) exterior wall
  • At 50 cm above ground 2.0 µSv/hr exterior wall
  • At 1.0 m above ground 1.5 µSv/hr (125 cps)
    exterior wall
  • At 1.5 m above ground 20 cps exterior wall
  • Inside tank in centre approx. 15 - 20 µSv/hr
  • Workers 4 hrs per day inside cleaning 80
    µSv/day
  • 80 uSv/day x 14 (days) 1120 µSv/2 weeks inside
    tank
  • gt 1 mSv/2 weeks

7
NORM Radiological Survey v 24372
8
Example of NORM Survey Report Certificate No
24372
9
Monitoring of Personnel
  • Action Limit 1 µSv/hour
  • Record on NORM Radiological Survey
  • Attached to PTW
  • RPT estimates workers daily dose
  • gt 8 µSv/day record into a database
  • Risk assessment - Tank cleaners and sludge farm
    operators required to wear TLD Badge

10
Bahja NORM Storage facility
400 m
Entrance
Concrete pad 100 m x 50 m
Rest Room Toilet
400 m
gate
2 Pits Sludge Storage 100m10m1m depth
Tubulars 50m x 25m
Drum storage 50m x 25m
Scrap metal 50m x 25m
11
NORM Survey Proposal
  • Reservoir to Min Al Fahal (MAF)
  • Oil/water/gas ? wells ? manifold/gathering
    station
  • ? Main pumping station (MPS) ? MAF tanks
  • Survey Proposal
  • Survey backwards from MPS (dehydration tanks) ?
    Gathering Stations (separators) ? well heads
  • Fields declared
  • Green (NORM Free)
  • Yellow (NORM Suspected)
  • Red (Known NORM)
  • Work back as to which geology, depth, water
    chemistry, E.O.R. programs are likely to produce
    NORM

12
Further discussion
  1. Does PDO need dedicated Interior based RPS?
  2. How do other organisations consistently identify
    contaminated plant/areas? Do you use a PTW system
    or other?
  3. Are surveys a useful tool? Do you utilise a
    similar method or other than proposed?
Write a Comment
User Comments (0)
About PowerShow.com