SUBGRADE STABILITY and LIME TREATMENT
APPLICATIONS at OMP
Marshall Thompson, P.E. Professor Emeritus
CE University of IL _at_ U-C
2
(No Transcript)
3
(No Transcript)
4
(No Transcript)
5
(No Transcript)
6
(No Transcript)
7
SUBGRADE SOIL PROPERTIES STRENGTH (CBR/QU)
MODULUS RUTTING RESISTANCE
8
(No Transcript)
9
(No Transcript)
10
0.5-INCH RUT / CBR - 6
0.5 INCH / CBR -6
11
(No Transcript)
12
SOIL COMPACTION
13
MATERIAL COMPACTION
14
MATERIAL COMPACTION
15
(No Transcript)
16
(No Transcript)
17
(No Transcript)
18
(No Transcript)
19
MOISTURE DENSITY - CBR
  • UofIL / IDOT PROCEDURE
  • COMPACT MOLD
  • CBR ON FINISHED MOLD

20
(No Transcript)
21
(No Transcript)
22
(No Transcript)
23
(No Transcript)
24
(No Transcript)
25
(No Transcript)
26
(No Transcript)
27
(No Transcript)
28
(No Transcript)
29
(No Transcript)
30
(No Transcript)
31
(No Transcript)
32
(No Transcript)
33
(No Transcript)
34
IMPROVED MATERIAL COVER REQUIREMENTS
35
CE CONE PENETROMETER
36
CBR CI / 40
37
(No Transcript)
38
LOG (CBR) 0.84 1.26 LOG (PR) PR Penetration
Ratio (inches/blow)
39
Automated Dynamic Cone Penetrometer (ADCP)
University of Illinois ADCP with its data
acquisition system
40
(No Transcript)
41
(No Transcript)
42
(No Transcript)
43
(No Transcript)
44
(No Transcript)
45
(No Transcript)
46
(No Transcript)
47
(No Transcript)
48
(No Transcript)
49
(No Transcript)
50
(No Transcript)
51
MOISTURE DENSITY CONTROL DIFFICULTIES
  • DRYING EFFORTS ???
  • DRYING DAY ???
  • (TEMP / ET)
  • DRYING DAYS ??

52
MOISTURE CONTROL IS TEMPORARY SOLUTION!!!!!
53
EQUILIBRIUM CONDITIONS
54
(No Transcript)
55
LIME PRODUCTS
56
LIME PRODUCTION (RAW MATERIALS)
CALCITE CaCO3 DOLOMITE Ca CO3 . MgCO3
57
(No Transcript)
58
(No Transcript)
59
QUICKLIME (QL) FINES
SOME QL PARTICLE SIZES ARE ltlt SMALL FOR
HYDRATION PRODUCT QL FINES
60
LIME KILN DUST (LKD)
FINELY-DIVIDED DUST FROM THE KILN STACKS
61
LKD COMPOSITION Some Kilns (15-20)
QL INERT MATERIAL
INERT MATERIAL (50-70) SiO2 Al2O3 Calcite
/ Dolomite
62
(No Transcript)
63
(No Transcript)
64
(No Transcript)
65
CATION EXCHANGE FLOCCULATION AGGLOMERATION
RAPID REACTION !!!!!
ALL FINE-GRAINED SOILS WITH SIGNIFICANT CLAY!!
66
(No Transcript)
67
NOT ALL FINE-GRAINED SOILS ARE LIME REACTIVE
!!!!
68
UNDESIRABLE !!!!!!
69
IMMEDIATE EFFECTS
70
A-6 (11)
71
(No Transcript)
72
FLANAGAN-B 36 CLAY PI 21 HOSMER-B 30
CLAY PI-22
73
(No Transcript)
74
(No Transcript)
75
(No Transcript)
76
(No Transcript)
77
CURING EFFECTS
78
CURING _at_ 72F
79
(No Transcript)
80
(No Transcript)
81
(No Transcript)
82
(No Transcript)
83
CHECK MT. CARMEL SAND GRAVEL
VIDEO (CONSTRUCTION PROCESS)
84
(No Transcript)
85
  • OMP SOIL SAMPLES
  • 61 BUCKETS
  • CLAY RANKING
  • (CHECK PI / CARBONATES)
  • VISUAL INSPECTION
  • SELECTED BUCKETS
  • (FOUR GROUPS)

86
Grouping Of Soils
Boring No. Bucket No. Depth Soil Description Clay LL PI Silt
GROUP 1 GROUP 1 GROUP 1 GROUP 1 GROUP 1 GROUP 1 GROUP 1 GROUP 1
MT 14 20 5'-10' Gray SILTY CLAY with Sand 17.6 22 6 54.8
MT 16 17 1'-5' Brown and Gray SANDY LEAN CLAY 19.2 30 17 35.4
MT 4 43 1'-4' Gray LEAN CLAY with sand 22.1 24 8 52.4
MT 3 54 29'-33' Gray SANDY LEAN CLAY 22.1 30 11 39.7
GROUP 2 GROUP 2 GROUP 2 GROUP 2 GROUP 2 GROUP 2 GROUP 2 GROUP 2
MT 3 52 6'-10' Gray SANDY LEAN CLAY 22.8 25 8 44.5
MT 3 51 2'-6' Gray LEAN CLAY with sand 23.5 27 12 49.9
MT 4 44 8'-12' Gray SANDY LEAN CLAY 23.7 24 8 42.9
MT 5 50 33'-36' Gray SANDY LEAN CLAY 25.3 28 10 41.6
87
Boring No. Bucket No. Depth Soil Description Clay LL PI Silt
GROUP 3 GROUP 3 GROUP 3 GROUP 3 GROUP 3 GROUP 3 GROUP 3 GROUP 3
MT 5 47 1'-5' Gray LEAN CLAY with sand 29 33 13 43.2
MT 15 32 1'-5' Gray LEAN CLAY with Sand 29.2 24 9 41.4
MT 10 36 1'-5' Gray LEAN CLAY with Sand 29.4 24 11 39.3
MT 13 3 16'-20' Gray LEAN CLAY with sand 29.7 32 17 50
GROUP 4 GROUP 4 GROUP 4 GROUP 4 GROUP 4 GROUP 4 GROUP 4 GROUP 4
MT 17 24 18'-21' Brown and Gray LEAN CLAY with Sand 39.4 41 24 39.7
MT 8 16 30'-34' Brown and Gray LEAN CLAY with Sand 39.7 38 19 43.3
MT 12 12 30'-35' Brown and Gray LEAN CLAY with Sand 41.9 46 26 42.6
MT 6 27 6'-10' Brown and Gray LEAN CLAY with Sand 43.7 44 18 38
88
  • LIME LAB TESTING PROGRAM
  • M-D-CBR (0 5 LIME)
  • QU (0 5 LIME)
  • (48-HOURS _at_ 12OF)
  • RESILIENT MODULUS (0 5 LIME)
  • LIME TYPE EFFECT
  • LIME EFFECT

89
LIME PRODUCTS TYPE QUICKLIME FINES LIME KILN
DUST (LKD) SOURCE BUFFINGTON, IN SOUTH CHICAGO,
IL
90
Moisture-Density Results for Group 2 Soils
91
CBR Results for Group 2 Soils
92
BEST OPTION LIME TREATMENT
Write a Comment