Speedwell Weather Topic Weather Station
Installation
2
Goal To ensure 100 accuracy of settlement
data Common causes of inaccuracy - Observer
failure - Equipment failure (observing or
transmission) - Vandalism - Observation
tampering Preventing inaccuracy - Observer
failure -gt duplicate systems (independent
observers, equipment) - Equipment failure
(observing or transmission) -gt backup systems /
duplicate systems - Vandalism -gt secure sites
(physical obstacles) - Observation tampering -gt
smart observing techniques / duplicate
systems The accuracy of settlement data for
financial contracts is not a luxury, it is a
necessity
3
  • Speedwell Weather
  • 10 years of experience in the weather risk
    markets
  • Extensive client list
  • Global leader for weather risk analysis products
  • Weather Derivatives pricing software
  • Data products (feeds / history) - Recalibrated,
    cleaned, and settlement data
  • Forecast products
  • Extensive experience with what clients need to be
    comfortable with a deal
  • Independent 3rd party confirmation of
    observations
  • Readily accessible observations for tracking a
    deal and settlement
  • Transparency of methodology
  • Expert team of professionals dedicated to meeting
    the needs of the weather market
  • Stephen Doherty Director
  • Dr. Michael Moreno Chief software architect /
    Quant developer
  • Phil Hayes Head of data and forecast products

4
  • Speedwell Weather Settlement Data Experience
  • Providing settlement services for numerous
    companies involved in OTC weather trading
  • Providing settlement data for the Chicago
    Mercantile Exchange (CME)
  • David Whitehead Project Lead
  • David has extensive experience with the
    installation of weather stations and processing
    of settlement data for weather risk contracts.
    With a Masters degree in Meteorology coupled with
    10 years of experience in weather risk
    management he has extensive practical experience
    and market knowledge. Davids experience
    includes project management for the installation
    of weather stations in Malawi, Africa as part of
    a World Bank Weather Risk program. His
    participation involved all aspects of the work
    from equipment recommendation / selection,
    working with local authorities on land
    acquisition and physical station installation,
    processing of observations, and the creation of
    the final settlement data.
  • In addition to Davids work on the Malawi project
    he has been involved
  • with a similar project in Ethiopia (World Bank)
    , Chile, and other smaller scale
  • OTC weather transactions. David and the
    Speedwell team have
  • provided significant insight into the creation
    of settlement data for
  • the CMEs latest set of weather contracts.

5
  • Weather Station Installation / Settlement Data
    (overview)
  • Clarify project goals
  • Equipment selection
  • Equipment procurement
  • Land rights acquisition
  • Additional materials procurement
  • Obtain local labor / site preparation / station
    installation
  • Data processing
  • Site maintenance
  • Settlement data
  • Site decommissioning?

6
  • Weather Station Installation / Settlement Data
    (key considerations)
  • Equipment selection
  • Determining the correct instrumentation for a
    project must be made
  • with full understanding of the intended use and
    site of the
  • instrument. The World Meteorological
    Organization (WMO)
  • instrumentation.
  • Considerations
  • Are there meteorologically unique observing
    obstacles?
  • - snowfall can be difficult to observe, extreme
    cold
  • Does the data quality (QC) control process
    require certain observation types?
  • - advanced QC techniques make use of the
    interrelationship between multiple variables
  • Is there a high risk of theft?
  • - instrumentation can be installed on an elevated
    platform, unique fasteners, fencing, razor wire
  • What is the expected life span of the
    instruments?
  • - temporary installation is different from
    permanent, if the instruments are permanent who
    assumes control?, does the assuming agency
    have a preferred instrument type?
  • What resources are available?
  • - Electrical power? GSM cell service?

7
  • Weather Station Installation / Settlement Data
    (key considerations)
  • Equipment procurement
  • purchase
  • construction most systems are not off the
    shelf, typical timing 3-5 weeks
  • shipment stations are typically shipped as
    cargo (slow)
  • customs can be a major obstacle helpful to
    work with someone domestically
  • transport moving stations parts into a remote
    area requires certain logistics
  • Land rights acquisition (external to SWD
    participation)
  • important to obtain the legal right to install
    instrumentation
  • specifics concerning the cost of the lease, who
    owns the lease, length of lease, must all be
    considered

8
  • Weather Station Installation / Settlement Data
    (key considerations)
  • Additional materials
  • Many materials are best obtained domestically
    reduces costs and logistics
  • Fencing type required
  • Concrete cement, sand, water, mixer, frame
  • Locks
  • SIM card
  • Site preparation / station installation
  • Labor local individuals who speak the language
    and know where to obtain materials are best
  • task - grading of land
  • task - pour concrete slab
  • task - install fencing
  • task install station

9
  • Weather Station Installation / Settlement Data
    (key considerations)
  • Data processing
  • Confirm the transmission and receiving of
    observations
  • Site maintenance
  • It should be assumed that the site will have
    problems (especially in winter conditions)
  • Maintenance options
  • Local assistance (trained observer, equipment
    manufacturer)
  • International assistance positioned locally
  • International assistance on a need basis
  • Typical concerns
  • Freezing of instrumentation
  • Debris (dust, dirt, leaves)
  • Insect infiltration
  • General failure
  • Replacement sensors must be kept on hand

10
  • Weather Station Installation / Settlement Data
    (key considerations)
  • Settlement Data
  • Goal to ensure 100 accuracy of the observations
  • Step 1 verify the validity of the observations
    from the installed stations
  • surrounding station approach
  • external observations (satellite observations,
    RADAR)
  • comparison against climatology derived from time
    series of neighboring stations
  • review of the interrelationship between observed
    variables
  • precipitation -gt lower solar radiation (clouds)
  • precipitation -gt temperature drop and relative
    humidity increase
  • liquid precipitation -gt occurs with warmer
    temperatures
  • Step 2 verify the observations for the primary
    stations / fill missing observations
  • review the relationship between stations (primary
    vs. installed)
  • determine the probability of differences between
    observations
  • create estimate values for missing observations
  • Clarify project goals
  • Equipment selection
  • Equipment procurement
  • Land rights acquisition
  • Additional materials
  • Site / station installation
  • Data processing
  • Site maintenance
  • Settlement data
  • Site decommissioning?

11
  • Equipment Recommendations
  • Manufacturers of instrumentation
  • All Weather, Inc.
  • focused on aviation systems
  • Campbell Scientific, Inc.
  • good reputation
  • cold weather specific instrument packs
  • Casella CEL
  • used for World Bank project
  • highly recommended (Dave W)
  • lacking cold weather
  • Coastal Environmental Systems
  • focused on systems for the U.S. government
  • Davis Instruments Corp.
  • inexpensive solutions for private use
  • Vaisala
  • one of the largest suppliers of weather
    instruments
  • specifically designed cold weather instrument
    packs

Note the ability to observe liquid equivalent
precipitation is a unique variable type not
supported by all vendors
Campbell Scientific Cold Region Research
Write a Comment
User Comments (0)
About PowerShow.com