North 27th Street Adaptive Signal Control Technology Project - PowerPoint PPT Presentation

1 / 10
About This Presentation
Title:

North 27th Street Adaptive Signal Control Technology Project

Description:

North 27th Street Adaptive Signal Control Technology Project Randy Hoskins, P.E. City of Lincoln Assistant City Engineer Fletcher Ave Superior St Adams St Holdrege St ... – PowerPoint PPT presentation

Number of Views:114
Avg rating:3.0/5.0
Slides: 11
Provided by: LonnieB9
Category:

less

Transcript and Presenter's Notes

Title: North 27th Street Adaptive Signal Control Technology Project


1
North 27th Street Adaptive Signal Control
Technology Project
  • Randy Hoskins, P.E.
  • City of Lincoln
  • Assistant City Engineer

2
  • 5-Mile Corridor
  • 17 Intersections
  • 2M Project Cost
  • 90 Federal
  • 10 Local
  • Improve
  • Safety
  • Operations
  • Mobility
  • Partnership with UNL

Fletcher Ave
Superior St
N. 27th St
Adams St
Holdrege St
O Street
3
Safety Improvement
  • 1,148 Crashes in a 3 year period
  • 73 million cost to community
  • 10 reduction in crashes (conservative)
  • Benefit to Cost ratio 171 ( efficiency
    savings)

4
Efficiency
  • 17,000 - 36,000 vehicles per average day
  • Currently running 7 timing plans per day
  • Heavy seasonal shopping traffic
  • Husker event traffic
  • I-80 detour route

5
  • Normal Process
  • ASCT - Automated Process

6
N. 27th Street Adaptive Signal Control
Technology Corridor
No modifications to timing
Delay
Incremental re-timing (every 3 to 5 years)
Complaints
Traffic Adaptive
Time (years)
7
Project Upgrades
  • Traffic signal controllers and cabinets
  • Fiber-optic conduit and cable
  • Vehicle detection equipment
  • Adaptive signal equipment

8
The Beauty of ASCT
  • No longer tied to dials
  • Smart system
  • Adapts to existing
  • conditions
  • Greater flexibility

9
UNL Involvement
  • Existing project in corridor traffic sensors
  • Real-time data collection
  • Sensors, cameras, traffic signal controllers
  • Connections to UNL traffic lab
  • Before/after data and studies
  • Real-world, hands-on
  • opportunities for students

10
Project Schedule
  • Updates to ITS architecture
  • Project design
  • Construction - Fall 2014