Project Management Certificate Program Defining Project Schedule - PowerPoint PPT Presentation

1 / 26
About This Presentation
Title:

Project Management Certificate Program Defining Project Schedule

Description:

Project Management Certificate Program Defining Project Schedule Supplemental Slides * Professional Development CenterProfessional Development Center Spring ... – PowerPoint PPT presentation

Number of Views:190
Avg rating:3.0/5.0
Slides: 27
Provided by: BobNo3
Category:

less

Transcript and Presenter's Notes

Title: Project Management Certificate Program Defining Project Schedule


1
Project Management Certificate ProgramDefining
Project Schedule
  • Supplemental Slides

2
Resource Breakdown Structure
Time Management Resource Estimating
  • A catalogue of the resources available for
    assignment to project activities
  • Used to link Work Packages in the Work Breakdown
    Structure to organizational components performing
    project work
  • Shows
  • Where resources are located
  • How much might be available

3
Example - RBS
Time Management Resource Estimating
4
Scheduling Terms
Time Management Resource Estimating
  • Duration
  • The number of work periods scheduled for task
    performance (days, weeks, etc)
  • Effort
  • The amount of work required for task completion
  • E.g. staff-hours, person-days, etc
  • Resource Intensity
  • Effort divided by Duration
  • Example four workers at a time to complete the
    scheduled task
  • Rate Quantity per unit time (dollars/hour)

Note Effort rarely equals Duration
5
Activity Duration Estimating
Time Management Duration Estimating
  • Estimating the number of work periods needed to
    complete all activities.
  • Factors
  • Resource requirements
  • Resource capabilities
  • Resource availability
  • Methods
  • Analogous estimates
  • Parametric estimates
  • Three point estimates (PERT)

6
Basis for Duration Estimates
Time Management Duration Estimating
  • Duration includes the actual amount of time
    worked on a task elapsed time
  • Effort in the number of work hours required to
    complete a task
  • Consider the following
  • resource capability, availability cost
  • elapsed time
  • alternatives

Note Effort rarely equals Duration
7
PERT
Time Management Duration Estimating
  • Program Evaluation Review Technique (PERT)
  • Similar to Critical Path Method (CPM)
  • Based on precedence network
  • Used to account for uncertainty in activity
    duration estimates

O 4M P 6
Expected Activity Duration (D)
  • Optimistic (O)
  • Most Likely (M)
  • Pessimistic (P)

8
Resource Leveling
Time Management The Schedule
  • Reducing workload to normal levels.
  • Approaches
  • Modify the schedule by manually redefining,
    moving, or otherwise changing task definitions,
    durations, and/or relationships.
  • Use resource leveling capabilities in software
    packages.

9
Project Schedule
Time Management The Schedule
10
Resource Loading
Time Management The Schedule
11
Project Workload
Time Management The Schedule
12
Resource Leveling
Time Management The Schedule
13
Resource Leveling
Time Management The Schedule
14
Resource Leveling
Time Management The Schedule
15
Schedule Compression
Time Management The Schedule
  • Resource leveling usually results in schedule
    extension.
  • Schedule compression can be used both to level
    workload and to compress schedule
  • Techniques
  • Fast Tracking
  • Crashing
  • Reduce Project Scope

16
Fast Tracking
Time Management The Schedule
  • Revise the precedence network to convert
    sequential tasks into parallel tasks.
  • Change precedence relationships to overlap task
    execution.

17
Crashing
Time Management The Schedule
  • Three approaches to reducing project schedule
    duration
  • Reduce project scope by eliminating tasks or
    reducing task durations.
  • Work overtime and accept additional costs.
  • Allocate additional resources in a way that
    minimizes additional costs.

18
Project Management Certificate ProgramDefining
Project ScheduleCritical Path
  • Supplemental Materials

19
Critical Path
Project Schedule Critical Path
  • The sequence of schedule activities that
    determines the duration of the project
  • In other words .
  • the longest path through the activity network
  • the path with zero slack (float)
  • earliest completion date for a project
  • monitor it closely take corrective action

Note Critical Path can change over time
20
Key Terms
Project Schedule Critical Path
  • Forward Pass defines the earliest date each
    activity can start and finish, thereby
    determining project duration
  • Backward Pass defines the latest date each
    activity can start and finish without delaying
    project completion

21
More Terms
Project Schedule Critical Path
  • Total Slack (Float) amount of time an activity
    can be delayed without delaying project
    completion
  • Free Slack (Float) amount of time an activity
    may be delayed without delaying the completion of
    another activity

Note Float Slack
22
Precedence Diagramming Method (PDM)
Project Schedule Critical Path
Forward Pass - Add Start End dates Duration
Activity on Node diagram (AON)
23
Precedence Diagramming Method (PDM)
Project Schedule Critical Path
Determine Earliest Finish Date
12/27
24
Precedence Diagramming Method (PDM)
Project Schedule Critical Path
Backward Pass ? Late Start Finish Dates
12/27
Next Step Calculate Slack (Float)
25
Precedence Diagramming Method (PDM)
Project Schedule Critical Path
Calculate Slack (Float) Difference between Early
Late Start Dates
12/27
Critical Path Zero (0) Slack
26
Critical Path Zero Slack/Float
Project Schedule Critical Path
12/01 7 12/07
12/26 2 12/27
12/12 12 12/23
12/08 4 12/11
Task A
Task B
Task C
Task D
12/01 0 12/07
12/10 2 12/13
12/14 2 12/25
12/26 0 12/27
12/27
12/08 12 12/19
12/20 6 12/25
Task I
Task J
Start
Finish
12/20 0 12/26
12/08 0 12/19
12/01 10 12/10
12/11 4 12/14
12/20 3 12/22
12/15 5 12/19
Task E
Task F
Task G
Task H
12/25 5 12/27
12/20 5 12/24
12/16 5 12/19
12/06 5 12/15
ES DUR EF
Task
LS FLT LF