Title: LINK 22 Capabilities
1(No Transcript)
2 INTERNATIONAL DATA LINK
SYMPOSIUM 2003 NEWBURY, 30 SEP TO 2 OCT 2003
LINK 22 Capabilities Data Link Processor
Dipl. Ing. Heinz Marsau-RierlSenior Project
Manager Data Link Systems / NILETelefon 49
421 457 3707Fax 49 421 457 2038E-Mail
Marsau_at_stn-atlas.de
The following sheets are property of Atlas
Elektronik GmbH Bremen Germany Reproduction,
utilization, or disclosure to third parties in
any form whatsoever, is not permitted without
written consent of the proprietor.
3Outline
- Company Profile
- ATLAS Data Link Experience
- Advantages and Key Aspects of the national Link
22 Development - Areas of Development in the Link 22 System
- Development Realisation DLP
- Relevant Specifications
- Main Areas of DLP Functionality / Performance
- Planed Link 22 Activities in the ISS Phase
- Conclusion / Results of the national Procedure
- Demonstration of a Link 22 System Chain (incl. a
DLP Link 22) in a simulated NILE Network /
Scenario
4History of the Company
2003 ATLAS ELEKTRONIK GmbH
100 BAE SYSTEMS
Rheinmetall
BAE SYSTEMS
1997 STN ATLAS Elektronik GmbH
1994 STN ATLAS Elektronik GmbH
1992 STN Systemtechnik Nord GmbH
1991 Atlas Elektronik GmbH
1990 DMT Marinetechnik GmbH
1990 MSG - Marine- und Sondertechnik GmbH
Bremer Vulkan Verbund
1983 Krupp Atlas Elektronik GmbH
1989 TST-Telefunken Systemtechnik GmbH
1989 MBB-UM
1966 Fried. Krupp GmbH
KRUPP
DASA Deutsche Aerospace
1911 Atlas Werke
1981 MBB - Messerschmitt- Bölkow-Blohm GmbH
1883 AEG - Allgemeine Elektrizitätsgesellschaft
AG (founded as DEG - Deutsche Edison
Gesellschaft)
1964 VFW - Vereinigte Flugtechnische Werke
1902 Norddeutsche Maschinen- und Armaturfabrik
GmbH
1924 Focke Wulf
5Market Segments
Submarine Systems
Mine Warfare Systems
Surface Ship Systems
Systems Services and Support
Paramilitary / Commercial Market
Vessel Traffic Systems /Coastal Surveillance
AUVs
Hydrographic Systems
6Surface Ship Systems
Integrated Navigation
Navigation Radars
Tactical NavigationSystems-WECDIS
Hull Mounted Sonar Systems
Activated Towed Array Sonars ACTAS
Combat Systems COSYS
7ATLAS Experience
Projects in Data Link
- LINK-11 Integration FPB S143
- LINK-11 Specification and Integration for S143A
FPB / F122 Frigate(AEG-, RS-, RC-Equipment)
incl. Integration -Software - LINK-11 Integration Belgian Frigate(AEG HF Tx/Rx
-, RC - Equipm. ) incl. L 11 Interface Sim.
Software - Study HF- Components / LINK-11- Remote Control
- CRO - Baltic Sea - JMCIS Joint Maritime Command Information System
F124 Integration - MULUS Multi Link Subsystem Studies
- Link 11 Integration into Submarines ( e.g. SAURO
Italy ) - Link Y Integration into OPV Royal Malaysian Navy
8ATLAS Experience
Contracts Project NILE
? Scope of Work System Analysis, Simulations
(protocol, network), Engineering
Work, Development, Consulting MOD Concept
phase ? Analysis 4,8 KB/S HF- Communication1985
? Follow on study LINK-11-Improvement HF ?
Automatic channel selection, propagation
analysis in HF band Definition phase ? ECM -
Resistance in HF- Communication from 1987 ?
Technical Investigations, LINK-11- Improvement
Definition phase DD-Subphase I ? Special
Investigations NILE Design from
1993 Development Subphase One (incl. OPNET
Sim.) DD Subphase II ? Predevelopment National
Asset Link 22from 1998 NNR-Kernel System
(National NILE Reference System)- ongoing ISS
Phase ? National Asset Link 22, Extension
Message Implementation DLPfrom 2003
9Link 22 - Capabilities
Areas of ongoing national NILE Development
Fixed Freq. HF Radio
NCE NILE Communications Equipment
Time-of-Day
ECCM HF Radio
SystemNetworkController(SNC)
SignalProcessorController(s)(SPC)
LINK-22CRYPTOLLC
Fixed Freq. UHF Radio
DLP
ModemsNet TimingRadio Control
ECCMUHF Radio
STANAG-5522
Protocols
CMS
CMS_SIM
DLP
SNC_SIM
10 ATLAS Link 22 Development
Procedure
- Starting early Investigations and Studies ( 1985
until Now ) - Scope of Work System Analysis, Simulations
(protocol, network), Engineering
Work,Development, Consulting MOD - Beginning Predevelopment DLP Link 22 Mid 1998
- Key aspects and advantages of the national NILE
program - Use of know how and results of the past NILE
studies / contracts - Use of existing specifications produced in NILE
DD Subphase I II - Parallel Development national / multinational
- Predevelopment DLP Demonstrator/NNRS (national)
- FAT 07/03 - SNC (multinational NILE PMO)
- NRS (multinational NILE PMO)
- MLTT Multi Link Test Tool (multinational NILE
PMO) - Being prepared for Kick Off of national SNC
Platform and LLC-Simulator Integration and
Assembly Link 22 chain - Consideration of future Multi Link Subsystem
requirements
11Link 22 - Capabilities
Predevelopment Kernel System - NNRS (DLP
Demonstrator )
- Development National NILE / Link 22 Reference
System (NNRS) -Kernel System, incl. Link
22-Data Link Processor Segment DLP (kernel
function, tactical message processing) Based
on - STANAG 5522
- Development specifications ( segment and
interface ) multinational NILE Development (SNC
and NRS) DD Subphase 2 - Set up NILE chain (Demonstrator) real Interfaces
adapted to CDS ( N -series interface) and NILE
Communication Equipment ( NCE ) ( IDD DLP _ SNC)
12Link 22 - Capabilities
Software Development
- Specification, Development and Integration in
accordance with MIL-STD-498 - Documentation Language English
- Programming Language is C
- Operating System is Windows NT /XP
- Object Oriented Programming
- Software is prepared for future Extension
13Link 22 - Capabilities
Main Specifications
STANAG 5522/ED1 Tactical Data Exchange Link 22
LGN 156-15-001 Interface Design Description
for the Data Final Link Processing Segment and
the System Network Controller for the
NATO Improved Link Eleven (NILE)
Program CP11205 CDE(IDS)84-19 Command and
Control Processor to Rev 8 Combat REV 8
Direction System Model 5 Interface Design
Specification (IDS) (U) DLP FRS Functional
Requirement Specification forVersion 1.0
the Data Link
Processing Segment of the
Link 22 (NILE) System
14Link 22 - Capabilities
DLP Main Areas of Functionality
(Super) Network Establishment L22 Message
Management Conversion N-Series lt-gt L22
15Link 22 - Capabilities
Functional Model of CDS Simulator
DLP
CDS_SIM
CDS_SIM Functionality
Interface
n-series
messages
N-series messages
- Generation dynamic
- tactical scenario
- Exchange of tactical and control data with CSCI
DLP - Data extraction
- Data analysis
- Process up to 100 tracks (local/remote)
16Link 22 - Capabilities
Functional Model of SNC Simulator
17Link 22 - Capabilities
DLP Link 22 Message Implementation
- The following subset of Link 22 messages
(according to STANAG 5522) will be processed by
the DLP - Surveillance Implementation e.g.
- AIR POS, AIR CAS (F2, F5-0)
- SUR POS, SUR CAS (F3, F5-1)
- SUB POS, SUB CAS (F4-0. F4-1)
- PLI POS (F1-1)
- PLI IFF (F02.1-0)
18Link 22 - Capabilities
DLP N-Series Message Implementation
- The following subset of N-Series messages
(following CP 11205 CDE 84-19) will be processed
by the DLP e.g. - Air PPLI, Surface PPLI, Subsurface PPLI, Land
Point PPLI, Land Track PPLI - Air Track, Surface Track, Subsurface Track
- Area of Propability
- Track Management
New defined Messages
- Network Parameter (OPTASK Link)
- DLP Info
- Comm Control
19Link 22 - Capabilities
Conclusion / Results of the national Procedure
- CDS Simulator Development (Test Tool to verify
the DLP) - Generation of tactical scenarios
- Data Exchange between CDS-SIM and DLP via
N-Series Messages following CP11205
CDE(IDS)84-19 Rev 8 - Data Logging of all data passing CDS_SIM - DLP
Interface
- SNC Simulator Development (Test Tool to verify
the DLP) - Data Exchange between SNC_SIM and DLP via
Tactical Interface Msgs and CS
Messages in accordance to IDD DLP-SNC - Realization of SNC Functions
- Simulation of up to 4 NILE Networks (to
build a virtual Super Network) - Data Logging
- of all data passing SNC_SIM-DLP Interface
- of all data passing simulated Interfaces (NU1
to/from simulated NUs)
20Link 22 - Capabilities
Conclusion / Results of the national Procedure
- Realization of a CDS-DLP Link 22 Interface
(N-Series Message Format)
- Realization of a DLP-NCE Interface in
accordance to IDD DLP-SNC Final
- (Super) Network Establishment (SN and
individual networks) in
accordance to DLP FRS Version 1.0
- Link 22 Message Management in accordance to
DLP FRS Version 1.0 - Implementation of Link 22 Messages
- Transmission Rules and Update Rates (STANAG
5522) - TSR Management
- Mapping of Link 22 Messages to N-Series
Messages and vice versa - Factory Acceptance Test successfully
performed in July 2003 Federal Office of
the Bundeswehr Information Management/Info
Technology and German Navy
21Link 22 - Capabilities
National NILE Reference System
CDS-Sim
DLP
SNC-Sim
Database Track Store TSR Queue SRID
List References STANAG 5522 TR/UR
SN Directory
Conversion N-Series lt-gt L22 Link 22 Message
Handling External Management/ TSR
Handling
22Link 22 - Capabilities
ISS - Phase Follow on Development DLP Link 22
(national)
23Link 22 - Capabilities
24Link 22 - Capabilities
National NILE System Integration
Generic Interface DLP - CMS Interim Solution DLP
Link 22 CORBA I/F integration into F 123 SATIR
25Link 22 - Capabilities
Future MULTI - LINK - Solution
Link 22
Link 11
Link 16
MIDS - LVT
SPC
DTS
Applikations- Server
LLC
OO-Trackstore
KG40
SNC
Multi Link Proc. with Link 22-Extension
CORBA
CORBA
26Link 22 - Capabilities
Future Trials and Tests GE NavCCSysCom with real
Platform Reference Systems incl. MLTT
MLTT
e.g. Reference System F123
NU5
NU1
NU3
NU2
NU2
NN1 HF FF
e.g.Reference System F124
NU1
NU3
Interrupt Slot
NU4
NU1
27Link 22 - Capabilities
Demonstration Link 22 System
CDS-Sim
DLP
SNC-Sim
Database Track Store TSR Queue SRID
List References STANAG 5522 TR/UR
SN Directory
Conversion N-Series lt-gt L22 Link 22 Message
Handling External Management/ TSR
Handling
28Link 22 - Capabilities
Link 22 System Demonstration
29Link 22 - Capabilities
Scenario Example for the Demonstration
NN1
NU1 Multi Network Node
NU4
NU5
NU1
NU4
NU5
NN2
NU1
NU5
PI Slot
NU1
NU4
30Link 22 - Solution
- Link 22 Products
- Data Link Processor Hardware / Software
- SNC I/F Simulator
- Link 22 Engineering
- Studies
- Data Link System Simulation
- Development
- Integration of Data Link Systems
Contact ATLAS Elektronik GmbHDipl. Ing. Heinz
Marsau-RierlSenior Project Manager
NILETelefon 49 421 457 3707Fax 49 421
457 2038Mobile 49 171 766 57 72E-Mail
Marsau_at_stn-atlas.de
Fixed Freq. HF Radio
NILE UNIT
ECCM HF Radio
SystemNetworkController
SignalProcessorController(s)(SPC)
LINK-22CRYPTOLLC
Fixed Freq. UHF Radio
DLP Link 22
CMS
ECCMUHF Radio