Title: James Thomson C. Eng
1 A New Approach to Constructing Underground
Stations
- James Thomson C. Eng
- Jacked Structures SA
- www.jackedstructures.com
2Jacked Installations for Large Structures
- Some Early Projects
- Modular installation of foundations, abutments
and piers - Box Jacking
3Modular Concept
4Wandsworth- 1969
5The Box Jacking Concept
6Brent Cross -1974
7New Concepts
- The Jacked Arch
- The Jacked Deck
8The Jacked Arch Concept
9The Jacked Deck Concept
10Cliffsend Underpass
- A 20m wide 126m long road underpass below rail
tracks - Client East Kent CC
- Contractor Volker Fitzpatrick Hochtief JV
11Cliffsend Underpass
Tender Scheme
a
a
Volker Fitzpatrick Hochtief JV
12Cliffsend Underpass
Final Scheme
Volker Fitzpatrick Hochtief JV
13Cliffsend Road Underpass Aerial View
14Cliffsend Road Underpass Jacked Deck Face
Excvation
15Cliffsend Road UnderpassDeck Jacking Installation
16Underground Metro Stations
- Installation by Jacked Arch and Jacked Deck
Methods
17Metro Stations-Arch Configurations
Top Box with Piles
Modular foundations and Walls
18Metro StationsArch Configurations
Foundation Box
Foundation Tunnel
19 Four Platform Arrangement
20 Alternative Four Platform Arrangement
21Jacked Deck Concepts
22An underground station piled abutments from a
high level box and a jacked arch
23Application of Jacked Deck to Launch Boxes
- Typically
- 22m -24 m span
- Around 200m long
- Depth varying from 6m-10m
-
24 Advantages of the Jacked Arch and Deck Approach
- By breaking down the process into elements
reduces the exposed soil face - Minimises jacking forces and reaction
arrangements. - Continuous support of the excavation with a full
structural lining - Surface settlement is minimal
- Use of precast units allows higher quality
construction
25 Advantages of the Jacked Arch and Deck Approach
- A wide range of geometry and configurations
- Installation to very close line and level
tolerances - Methods are applicable to both shallow
- and deep structures
- Provides greater clear spans over much
- longer drive lengths.
- Small launch platform area