17 : Revaluing Construction Project Management - PowerPoint PPT Presentation

1 / 10
About This Presentation
Title:

17 : Revaluing Construction Project Management

Description:

17 : Revaluing Construction Project Management building should be fun after all Ian Blake, Project Director, Schal. Revaluing CPM revaluing construction project ... – PowerPoint PPT presentation

Number of Views:250
Avg rating:3.0/5.0
Slides: 11
Provided by: GrahamW150
Category:

less

Transcript and Presenter's Notes

Title: 17 : Revaluing Construction Project Management


1
17 Revaluing Construction Project Management
building should be fun after all Ian Blake,
Project Director, Schal.
2
Revaluing CPM
  • revaluing construction project management
  • design-led construction project management
  • performance-driven construction project
    management
  • systems thinking
  • professionalism and bureaucracy

3
Revaluing CPM
  • asset not artefacts
  • adding value for clients
  • value in the project chain
  • profits, reputation, and learning
  • culture and self-esteem
  • valuation of the industry
  • a poor image

4
Alignment of Incentives
  • governability
  • designers and the client
  • vertical governance
  • horizontal governance
  • empowerment

5
A Design-led CPM
  • why lead with design?
  • the role of product integrity
  • project managers and design
  • enabling the solution of the briefing problem
  • enabling the solution of the design problem

6
A Performance-driven CPM
  • riding the project life-cycle
  • process integrity and process capability
  • the role of measurement
  • developing process capability
  • last planner
  • TQM
  • standardisation and pre-assembly
  • integrated PMIS and extranets
  • investing in constructability

7
Systems Thinking
  • the whole and the parts
  • a tectonic approach
  • the river structure and process
  • the discipline
  • a systems dynamic
  • from lecture 6.

8
The Dynamic of Adversarial Relations and
Over-Engineering
competitive tendering
client
trim margins
audit control
adversarial relations
opportunistic behaviour
complete specification
avoid litigation
over- engineer
responsibility for design
client
9
Bureaucracy and Professionalism
  • the problem of complex organisations
  • two ways of organising in the modern world
  • bureaucracy
  • professionalism
  • lean construction and neo-bureaucracy
  • project management and professionalism
  • revisiting tame and wicked problems

10
Professionalism and Bureaucracy in CPM
mission uncertainty
high
low
incremental adaptation
push the envelope
specification
mission emphasis
bright idea
iconic architecture
conception
Write a Comment
User Comments (0)
About PowerShow.com