Environment management procedure THAI TOKO ENGINEERING CO.,LTD. Environment management procedure Thai toko have 5 procedure method for environment management system ... – PowerPoint PPT presentation

Number of Views:170
Avg rating:3.0/5.0
Slides: 19
Provided by: xxx293
Category:

less

Transcript and Presenter's Notes

Title: THAI TOKO ENGINEERING CO.,LTD.


1
THAI TOKO ENGINEERING CO.,LTD.
  • Environment management procedure

2
Environment management procedure
  • Thai toko have 5 procedure method for environment
    management system
  • Environment policy ( ????????????????????? )
  • Planning ( ????????? )
  • Implement and operation ( ???????????? )
  • Checking and corrective action (
    ?????????????????? )
  • Management review ( ????????????????????? )

3
Environment management procedure
4
Environment management procedure
  • Environment policy
  • comply with Thai regulation
  • control pollution, reduce environment impacts,
    encourage energy saving
  • use standard for waste reducing
  • always review and appraisal environment
    management system for improvement system
  • environment management is duty of all staff
  • encourage and build a good mind for environment
    management to staff , sub contactor.

5
Environment management procedure
  • Planning ( Objective and target )
  • Objective and target for our company is
    environment impacts reducing
  • reduce air pollution
  • reduce water pollution
  • reduce sound pollution
  • We use any practice for our target
  • reject ( Avoid the use , avoid pollution )
  • reduce ( Reduce waste from operation processing
    and reduce natural resource usage )
  • reuse ( Reuse waste by recycle processing )
  • repair ( Always maintain equipment for a long
    time usage )

6
Environment management procedure
  • Implement and operation
  • 3.1 Organization chart

7
Environment management procedure
  • Implement and operation
  • 3.2 Duties and responsibilities
  • A. Division manager, Section manager,
    Assistant manger
  • responsibilities for
  • over all environment management system
  • initial set up new environment management policy
  • planning system
  • checking and management review

8
Environment management procedure
  • Implement and operation
  • 3.2 Duties and responsibilities
  • B. Project manager
  • responsibilities for
  • environment management system for project
    construction
  • quality control on environment management plan
  • checking and review plan to support customer
    policy
  • recommend operation and plan to staff and sub
    contactor

9
Environment management procedure
  • Implement and operation
  • 3.2 Duties and responsibilities
  • C. Site manger, engineer , supervisor
  • responsibilities for
  • morning talk meeting with staff and sub contactor
  • training and inform plan for operation
  • solve the environment problem
  • site checking
  • corrective action

10
Environment management procedure
  • Implement and operation
  • 3.2 Duties and responsibilities
  • D. Sub contactor
  • responsibilities for
  • morning talk meeting
  • follow up operation plan
  • machine checking and maintenance
  • inform the problem to site manager ,site engineer
  • Inform dangerous chemical data for using to site
    manager , site engineer
  • corrective action from engineer checking

11
Environment management procedure
  • Implement and operation
  • 3.3 Operation for site construction
  • A. reducing environmental impact of dust
    pollution
  • reduce welding process , cut process
  • sprinkle water on excavation process area and
    construction area 2 time per day
  • provide ventilation fan or vacuum to reduce the
    dust diffusion
  • site cleaning every day
  • provide scraps location
  • wheel cleaning before back from site construction

12
Environment management procedure
  • Implement and operation
  • 3.3 Operation for site construction
  • B. reducing environmental impact of noise
    pollution
  • Day working only for loudly job ( if need ,will
    have standard to control )
  • Checking the machine is in good condition, not
    exceed noise standards
  • Follow the maintenance tools and equipment manual
    continued
  • C. reducing environmental impact of wastewater
  • have toilet enough to support staff and worker
  • have preliminary waste water treatment system
    for toilet
  • have preliminary grease filter system for kitchen

13
Environment management procedure
  • Implement and operation
  • 3.3 Operation for site construction
  • D. reducing environmental impact of garbage
  • Sort of waste material as to the color receiver
  • Green bins for decompose
    waste that can not be
    recycled such as toilet paper fraction
  • Red bins for hazardous waste such as
    contaminated chemical clothes,
    Fluorescent Lamp, Color cans, and
    battery.

14
Environment management procedure
  • Implement and operation
  • 3.3 Operation for site construction
  • D. reducing environmental impact of garbage
  • Blue bin for general waste
    that can not be recycled such as plastic
    bag, foam
  • Yellow bins for recycling waste such as
    metal cans, plastic water glass, bottle
    glass

15
Environment management procedure
  • Implement and operation
  • 3.3 Operation for site construction
  • D. reducing environmental impact of garbage
  • providing support garbage container with enough
    construction workers
  • not leaving garbage in the drainage and sewer
    water
  • not leave any remnants from work place in the
    disallowed area
  • not burn any garbage in construction area
  • providing workers responsible for collecting
    garbage in the proper area
  • trying to order materials to fit with the size of
    the closest size
  • collect materials properly to decrease the
    fragment of before-use-materials

16
Environment management procedure
  • Implement and operation
  • 3.3 Operation for site construction
  • E. reducing environmental impact of dangerous
    chemical
  • Leading the hazardous chemicals to use , must
    notify the site manager before every time
  • Arranged hazardous materials locations or storage
    any toxic, hazardous, inflammable or explosives
    materials for security , leakage and
    contamination
  • training staff and worker for chemical using
  • study labels of any hazardous or poison materials
    before use
  • have prevention method when occur accident from
    chemical using

17
Environment management procedure
  • 4. Checking and corrective action
  • Monitoring and measurement in the activities
    which cause environmental impact
  • Corrective and preventive action in what is not
    follows the bound.
  • Monitoring the effectiveness of the corrective
    action and prevention
  • Management review
  • Review environmental management system by senior
    executives of the organization
  • continuous updates to ensure effective
    environmental management of organizations.

18
Environment management procedure
Write a Comment
User Comments (0)
About PowerShow.com