ATS - PowerPoint PPT Presentation

About This Presentation
Title:

ATS

Description:

... not very accurate Produced printable timesheets Timekeeping History ATS Version 1 Visual Basic 6.0 SQL Server back end Issues User Interface Issues Database ... – PowerPoint PPT presentation

Number of Views:72
Avg rating:3.0/5.0
Slides: 16
Provided by: JoshB81
Category:
Tags: ats | basic | visual

less

Transcript and Presenter's Notes

Title: ATS


1
ATS
  • Automated Timekeeping System

2
What is ATS?
  • Timekeeping system for US Army Corps of Engineers
  • Management tool for Supervisors to track project
    funds

3
Why ATS?
  • Primary development drivers
  • Track Project charges
  • Provide printable timesheets
  • Secondary benefit
  • A single point of entry for timekeepers

4
How timekeeping works
  • Each employee has a timekeeper
  • Timekeeper receives a timesheet from each
    employee
  • Timekeeper checks it for corectness and it is
    signed by the supervisor and the employee
  • Timekeeper enters the information into CEFMS
    (Corps of Engineers Financial Management System)
  • Timekeeper deals with any issues regarding money
    and schedules (PT/FT)

5
Timekeeping history
  • First Paper timesheets filled by hand
  • Timekeeper has to go to each employee
    individually
  • No way to know if there will be enough money
    until crunch time
  • Timekeeper has to deal with everyones handwriting

6
Timekeeping History
  • ETS (Electronic Timekeeping System)
  • Access
  • Issues
  • Data Consistency
  • User Interface
  • Speed
  • Single point of entry for Timekeepers and users
  • Could track project charges somewhat, not very
    accurate
  • Produced printable timesheets

7
Timekeeping History
  • ATS Version 1
  • Visual Basic 6.0
  • SQL Server back end
  • Issues
  • User Interface Issues
  • Database Non-viable
  • Functional Difficulties
  • Still a single point of entry
  • Tracked Project charges more closely
  • Produced printable timesheets

8
Renewed requirements for ATS
  • Make it track project funds absolutely correctly
  • Allow users to retrieve information about
    previous pay periods
  • Improve User Interface Behavior

9
Development Hurdles
  • Database was non-viable to make these changes
  • Third-party controls sometimes has unexpected
    behavior
  • Constricted development team schedule

10
Before SQL Database
11
After SQL Database
12
ATS Screenshots
13
ATS Screenshots
14
ATS Screenshots
15
Questions?
Write a Comment
User Comments (0)
About PowerShow.com