Title: ANATOLIA WATERSHED REHABILITATION PROJECT
1ANATOLIA WATERSHED REHABILITATION PROJECT
- AGRICULTURAL POLLUTION CONTROL IN BLACKSEA
- Dr. Ömer Faruk Mutlu
- October 23 25, ANKARA
2TURKEY
- Total area 780.000 km2
- Population 72 million
- 34 of total population of Turkey live in rural
areas. - According to year 2001 agricultural census
results 71 of rural population in our country
have operations of agricultural activities.
3Agricultural Structure
Area (million ha) of agricultural area
Total Area 66.9
Agricultural Area 21.8
Cereals 15.2 69.9
Vegetables Flower 0.6 2.7
Permanent crops 2.4 11.0
Fallowing Lands 3.7 17.2
Irrigated Area 5.2 23.9
Natural meadow 14.6
Unused potential areas 1.9
4STOCKBREEDING NUMBER(Million) DISTRIBUTION NUMBER
Total Cattle 10.6 lt 1 year 2.6
lt 2 year 2.9
gt 2 year dairy cattle 4.6
Other cattle 0.5
Total Poultry 297 Broilers 238.1
Egg 58.8
Turkey 5.9
Duck 0.8
Goose 1.3
Total Sheep 25.3 Adults 12.6
Lamb 12.7
Goat 6.6
Donkey 0.3
Mule 0.1
Horse 0.2
5PROJECT AREA
6OBJECTIVE
- The Project will reduce, over the
long-term, the discharge of nutrients (nitrogen
and phosphorus) and other agricultural pollutants
into the surface and ground waters of Turkey and
the Black Sea through integrated land and water
management and ecologically sustainable use of
natural resources.
7OBJECTIVE
- increasing the use of environmentally
friendly agricultural practices and thereby
reducing nutrient discharge particularly from
agricultural sources to the Black Sea - strengthening national policy and local
regulatory capacity to meet European Union (EU)
standards for agricultural nutrient
pollution control
8Main Components of the Agricultural Pollution
Control in Blacksea
- Manure Management
- Nutrient Management
- Water and Soil Quality Monitoring
- Organic Farming
- Nitrate Directive Implementation
9MANURE MANAGEMENT
- By October 20, 2007, a total of 126 farm type
manure storage (for more than 10 cattle) and 77
household type manure stores (for up to 5 cattle)
have been completed. - Six large central manure storage and handling
facilities, Samsun, Amasya, Tokat and in Çorum
microcatchment have been completed. - Machinery (container carriers, solid manure
spreaders, manure mixers, liquid manure vacuum
tankers and loader tractors have been procured
and are in use.
10(No Transcript)
11(No Transcript)
12(No Transcript)
13(No Transcript)
14(No Transcript)
15 16 17 18 19 20 21 22 23(No Transcript)
24(No Transcript)
25(No Transcript)
26(No Transcript)
27(No Transcript)
28(No Transcript)
29BIOGAS
- Biogas introduction studies were launched.
- Within this scope 2 demonstration facilities are
under construction.
30BIOGAS
31BIOGAS
32NUTRIENT MANAGEMENT
- Soil Analysis
- Manure Analysis
- Manure Application Software
33SOIL AND MANURE ANALYSIS
- Project Provincial Teams were trained related to
Soil Sampling Techniques. - All needed chemical substances for analysis in
the scope of the Project was provided to Soil and
Fertilizer Research Institute. - Soil and manure analysis was launched and 400
soil and 20 manure analysis from the project
fields had been analyzed. - Soil and manure analysis will be accelerated
according to application of manure management.
34Soil sampling from the fields within the Project
Scope.
35(No Transcript)
36(No Transcript)
37Water and Soil Quality Monitoring
- The team has developed a detailed lab handbook
for procedures so that analysis procedures by all
labs are harmonized . - The labs are provided with necessary chemicals
and supplies, instrument capacity strengthened.
Both regional and provincial labs are taking
necessary samples and conducting water and soil
analysis. The data gathered so far will be used
to develop a baseline.
38Water and Soil Quality Monitoring
- Within project microcatchments, there are 33
points for surface water samples, 32 points for
ground water sampling and 2 points from natural
fountains. Water is being analyzed monthly and
quarterly for pH, temperature, dissolved oxygen,
turbidity , suspended solids , nitrate, TN, TP
and fecal coliform.
39Water Quality Monitoring Baseline
Ground water Nitrate Pollution results for
samples taken from Çorum microcatchment (Values
in mg/L)
40Water Quality Monitoring Baseline
Ground water Nitrate Pollution results for
samples taken from Amasya microcatchment (Values
in mg/L)
41Water Quality Monitoring Baseline
Ground water Nitrate Pollution results for
samples taken from Turhal microcatchment (Values
in mg/L)
42Water Quality Monitoring Baseline
Ground water Nitrate Pollution results for
samples taken from Samsun Ilyasli microcatchment
(Values in mg/L)
43Nitrate pollution monitoring sampling stations
(surface waters / ground waters) 548 ground
water, 1026 surface water and total 1574 sampling
stations.
Nitrat (yüzey sulari /yer alti sulari) izlemesi
örnekleme noktalari 548 yer alti,1026 yüzey,
toplam 1574
44ORGANIC FARMING
- With respect to organic farming, the project
organized training for 38 farmers and 32
provincial staff from the four project provinces
in Izmir where organic fruit production is well
established. -
- Subsequently three training sessions were
organized for training of the trainers on
organic farming. - An accredited control and certification services
company had been contracted to initially help in
organizing the organic fruit growing in the
project area and later in certification.
45ORGANIC FARMING
- 3 Organic walnut field had been established in 3
different microcatchments with 10 hectare, 1
hectare and 30 hectare dimensions. - In a microcatchment, 40 hectares walnut field
belong to 77 farmers, had been converted into
Organic Farming. - Interest to Organic Farming and related requests
to Project Management continuously increases.
46ORGANIC FARMING
An accredited certification company contracted
for organic Farming.
47ORGANIC FARMING
Works after harvest
48ORGANIC FARMING
First organic transition product
49TRAINING
- In the scope of the project, inner personnel
trainings and farmer trainings were carried out. - In Project provinces, project provincial teams
have been trained continuously. - Besides, trainings related to project were not
limited to the project provinces and
participation from other provinces was provided. - Until now, more than 800 farmers have been
informed about the project, nitrate pollution and
manure management. - In the coming months, farmer trainings will focus
on manure and nutrient management.
50TRAINING
- Training materials
- Laboratory analysis handbook
- Soil analysis handbook
- Nutrient Management
- Nutrient Management Plan
- Manure Application Software
- Manure
- Manure Management
- Compost management
- Determination and control of Agricultural
Pollution - Water pollution monitoring studies
- Soil sampling and evaluation of analysis results
- Soil sampling and evaluation of analysis results
- Biogas
- Climate change
51An instantaneous view from one of the continuous
farmer trainings
52FINANCE AND APPLICATION HISTORY
- AGRICULTURAL POLLUTION CONTROL (GEF GRANT)
- GEF (GRANT) 7.000.000
- PUBLIC CONTRIBUTION 2.560.000
- TOTAL 9.560.000
-
- CALENDAR
- PROJECT ACTIVITIES LAUNCHED IN JANUARY 2005
AND WILL BE FINISHED BY THE END OF 2012
53DISBURSEMENTS
GEF Grant (USD) Public contribution (USD)
2005 475.612 176.870 652.482
2006 1.050.278 304.018 1.354.296
2007 (until October) 1.004.450 354.523 1.358.973
Grand Total 2.530.340 835.411 3.365.751