Team Xerox Progress Report - PowerPoint PPT Presentation

1 / 22
About This Presentation
Title:

Team Xerox Progress Report

Description:

Team Xerox Progress Report Mechanical Engineering Design Team Jeff Carpenter Charlie Morris David Postel Jeremy Ryatt Electrical and Computer Engineering Design Team – PowerPoint PPT presentation

Number of Views:94
Avg rating:3.0/5.0
Slides: 23
Provided by: JeremyR156
Learn more at: http://web.cecs.pdx.edu
Category:
Tags: progress | report | team | xerox

less

Transcript and Presenter's Notes

Title: Team Xerox Progress Report


1
Team Xerox Progress Report
  • Mechanical Engineering Design Team
  • Jeff Carpenter
  • Charlie Morris
  • David Postel
  • Jeremy Ryatt
  • Electrical and Computer Engineering Design Team
  • Reuben Bellika
  • Viet Bui
  • PSU Faculty Advisor
  • Mark Weislogel, PhD
  • Xerox Industry Advisor
  • Trevor Snyder, PhD

2
Overview
  • Summary
  • DODVS Frame
  • Optic Mounting Assembly
  • Optics and Lighting
  • BTM Frame
  • BTM Automation
  • Current Progress
  • QA Session

3
Summary
  • Objective produce a imaging system that is
    capable of capturing ink drops on the drum and on
    the paper at identical locations
  • Current System clumsy to use, vibrates
    excessively, and the optical system fails to meet
    the desired image quality
  • There is no specific imaging system that compares
    the drum images to paper images

4
Summary
5
Summary
  • Oil is transferred from the maintenance roller to
    the drum before ink is transferred by the print
    head
  • Ink transfer from drum to paper as the paper
    feeds between the transfix roller and drum

6
DODVS Frame
7
DODVS Frame
8
DODVS Frame
9
DODVS Frame
10
DODVS Frame
11
DODVS Frame
12
DODVS Final Frame Design
  • Uses 3x6 inch T-Slot vertical supports
  • ½ inch thick aluminum base and top plate
  • Added gussets increase natural frequency

13
DODVS Frame
14
Optic Mounting Assembly
  • Current system is heavy and cumbersome

15
Optic Mounting
  • New system rotates camera to side with one easy
    step.

16
Optic Mounting (cont)
17
Optics
  • Existing camera and optic components will be
    reused to reduce cost
  • A second camera and optics will be purchased
  • New optics system will have a magnification range
    of 3x to 21x

18
Lighting
  • Metal Halide lighting is best option, but may be
    cost prohibitive
  • Splitting current light source may be adequate

19
BTM Frame
  • Same 3x6 inch T-Slot material
  • Same ½ inch thick base and top plate
  • Reuses DODVS camera brackets
  • Features cover plates to hide messy electronics
    and wires.

20
BTM Automation
  • XY Stage donated by Xerox, messy but it will
    work.
  • Manual cranks will be added for a manual override
    feature
  • EEs are currently working on motor driver
    operation and integration.

21
Current Progress
  • DODVS and BTM frame designs are entering detail
    design stage, final drawings will be complete in
    a few weeks
  • Final decisions on optics and lighting will be
    made this weekend, and ordered next week
  • Manufacturing of the frame assemblies begin in 4
    weeks
  • On track for June 1st completion date

22