Title: Integer Programming
1Integer Programming
Optimisation Methods
2Lecture Outline
- 1 Introduction
- 2 Integer Programming
- 3 Modeling with 0-1 (Binary) Variables
- 4 Goal Programming
- 5 Nonlinear Programming
3Introduction
- Integer programming is the extension of LP that
solves problems requiring integer solutions. - Goal programming is the extension of LP that
permits more than one objective to be stated. - Nonlinear programming is the case in which
objectives or constraints are nonlinear. - All three above mathematical programming models
are used when some of the basic assumptions of LP
are made more or less restrictive.
4Summary Linear Programming Extensions
- Integer Programming
- Linear, integer solutions
- Goal Programming
- Linear, multiple objectives
- Nonlinear Programming
- Nonlinear objective and/or constraints
5Integer Programming
- Solution values must be whole numbers in integer
programming . - There are three types of integer programs
- pure integer programming
- mixed-integer programming and
- 01 integer programming.
6Integer Programming
- The Pure Integer Programming problems are cases
in which all variables are required to have
integer values. - The Mixed-Integer Programming problems are cases
in which some, but not all, of the decision
variables are required to have integer values. - The ZeroOne Integer Programming problems are
special cases in which all the decision variables
must have integer solution values of 0 or 1.
79.3 The Branch-and-Bound Method for Solving Pure
Integer Programming Problems
- In practice, most IPs are solved by some versions
of the branch-and-bound procedure.
Branch-and-bound methods implicitly enumerate all
possible solutions to an IP. - By solving a single subproblem, many possible
solutions may be eliminated from consideration. - Subproblems are generated by branching on an
appropriately chosen fractional-valued variable.
8 - Suppose that in a given subproblem (call it old
subproblem), assumes a fractional value between
the integers i and i1. Then the two newly
generated subproblems are - New Subproblem 1 Old subproblem Constraint
- New Subproblem 2 Old subproblem Constraint
- Key aspects of the branch-and-bound method for
solving pure IPs - If it is unnecessary to branch on a subproblem,
we say that it is fathomed.
9 - These three situations (for a max problem) result
in a subproblem being fathomed - The subproblem is infeasible, thus it cannot
yield the optimal solution to the IP. - The subproblem yield an optimal solution in which
all variables have integer values. If this
optimal solution has a better z-value than any
previously obtained solution that is feasible in
the IP, than it becomes a candidate solution, and
its z-value becomes the current lower bound (LB)
on the optimal z-value for the IP. - The optimal z-value for the subproblem does not
exceed (in a max problem) the current LB, so it
may be eliminated from consideration. - A subproblem may be eliminated from consideration
in these situations - The subproblem is infeasible.
- The LB is at least as large as the z-value for
the subproblem
10 - Two general approaches are used to determine
which subproblem should be solved next. - The most widely used is LIFO.
- LIFO leads us down one side of the
branch-and-bound tree and quickly find a
candidate solution and then we backtrack our way
up to the top of the other side - The LIFO approach is often called backtracking.
- The second commonly used approach is
jumptracking. - When branching on a node, the jumptracking method
solves all the problems created by branching.
11 - When solving IP problems using Solver you can
adjust a Solver tolerance setting. - The setting is found under the Options.
- For example a tolerance value of .20 causes the
Solver to stop when a feasible solution is found
that has an objective function value within 20
of the optimal solution.
12Harrison Electric Company
- The Company produces two products popular with
home renovators old-fashioned chandeliers and
ceiling fans. - Both the chandeliers and fans require a two-step
production process involving wiring and assembly. - It takes about 2 hours to wire each chandelier
and 3 hours to wire a ceiling fan. Final assembly
of the chandeliers and fans requires 6 and 5
hours, respectively. - The production capability is such that only 12
hours of wiring time and 30 hours of assembly
time are available.
13Harrison Electric Company
If each chandelier produced nets the firm 7 and
each fan 6, Harrisons production mix decision
can be formulated using LP as follows
maximize profit 7X1 6X2
subject to 2X1 3X2 12 (wiring hours) 6X1
5X2 30 (assembly hours) X1, X2 0
(nonnegative) X1 number of chandeliers
produced X2 number of ceiling fans produced
14Harrison Electric Company
With only two variables and two constraints, the
graphical LP approach to generate the optimal
solution is given below
6X1 5X2 30
Possible Integer Solution
Optimal LP Solution (X1 33/4, X2 11/2,
Profit 35.25
2X1 3X2 12
15Integer Solution to Harrison Electric Co.
Optimal solution
Solution if rounding off
16Integer Programming
- Rounding off is one way to reach integer solution
values, but it often does not yield the best
solution. - An important concept to understand is that an
integer programming solution can never be better
than the solution to the same LP problem. - The integer problem is usually worse in terms of
higher cost or lower profit.
17Branch and Bound Method
- Branch and Bound breaks the feasible solution
region into sub-problems until an optimal
solution is found. - There are Six Steps in Solving Integer
Programming Maximization Problems by Branch and
Bound. - The steps are given over the next several slides.
18Branch and Bound Method The Six Steps
- Solve the original problem using LP.
- If the answer satisfies the integer constraints,
it is done. - If not, this value provides an initial upper
bound. - Find any feasible solution that meets the integer
constraints for use as a lower bound. - Usually, rounding down each variable will
accomplish this.
19Branch and Bound Method Steps
- Branch on one variable from Step 1 that does not
have an integer value. - Split the problem into two sub-problems based on
integer values that are immediately above and
below the non-integer value. - For example, if X2 3.75 was in the final LP
solution, introduce the constraint X2 4 in the
first sub-problem and X2 3 in the second
sub-problem. - Create nodes at the top of these new branches by
solving the new problems.
20Branch and Bound Method Steps
- 5.
- If a branch yields a solution to the LP problem
that is not feasible, terminate the branch. - If a branch yields a solution to the LP problem
that is feasible, but not an integer solution, go
to step 6.
21Branch and Bound Method Steps
- 5. (continued)
- If the branch yields a feasible integer solution,
examine the value of the objective function. - If this value equals the upper bound, an optimal
solution has been reached. - If it is not equal to the upper bound, but
exceeds the lower bound, set it as the new lower
bound and go to step 6. - Finally, if it is less than the lower bound,
terminate this branch.
22Branch and Bound Method Steps
- Examine both branches again and set the upper
bound equal to the maximum value of the objective
function at all final nodes. - If the upper bound equals the lower bound, stop.
- If not, go back to step 3.
Minimization problems involve reversing the roles
of the upper and lower bounds.
23Harrison Electric Co
Figure 11.1 shows graphically that the optimal,
non-integer solution is X1 3.75
chandeliers X2 1.5 ceiling fans
profit 35.25
- Since X1 and X2 are not integers, this solution
is not valid. - The profit value of 35.25 will serve as an
initial upper bound. - Note that rounding down gives X1 3, X2 1,
profit 27, which is feasible and can be used
as a lower bound.
24Integer Solution Creating Sub-problems
- The problem is now divided into two sub-problems
A and B. - Consider branching on either variable that does
not have an integer solution pick X1 this time.
25Optimal Solution for Sub-problems
Optimal solutions are Sub-problem A X1 4 X2
1.2, profit35.20 Sub-problem B X13, X22,
profit33.00 (see figure on next slide)
- Stop searching on the Subproblem B branch because
it has an all-integer feasible solution. - The 33 profit becomes the lower bound.
- Subproblem As branch is searched further since
it has a non-integer solution. - The second upper bound becomes 35.20, replacing
35.25 from the first node.
26Optimal Solution for Sub-problem
27Sub-problems C and D
Subproblem As branching yields Subproblems C and
D.
28Sub-problems C and D (continued)
- Subproblem C has no feasible solution at all
because the first two constraints are violated if
the X1 4 and X2 2 constraints are observed. - Terminate this branch and do not consider its
solution. - Subproblem Ds optimal solution is
- X1 4 , X2 1, profit 35.16.
- This non-integer solution yields a new upper
bound of 35.16, replacing the original 35.20. - Subproblems C and D, as well as the final
branches for the problem, are shown in the figure
on the next slide.
29Harrison Electrics FullBranch and Bound
Solution
30Subproblems E and F
- Finally, create subproblems E and F and solve for
X1 and X2 with the added constraints X1 4 and
X1 5. The subproblems and their solutions are
31Subproblems E and F (continued)
32Goal Programming
- Firms usually have more than one goal. For
example, - maximizing total profit,
- maximizing market share,
- maintaining full employment,
- providing quality ecological management,
- minimizing noise level in the neighborhood, and
- meeting numerous other non-economic goals.
- It is not possible for LP to have multiple goals
unless they are all measured in the same units
(such as dollars), - a highly unusual situation.
- An important technique that has been developed to
supplement LP is called goal programming.
33Goal Programming (continued)
- Goal programming satisfices,
- as opposed to LP, which tries to optimize.
- Satisfice means coming as close as possible to
reaching goals. - The objective function is the main difference
between goal programming and LP. - In goal programming, the purpose is to minimize
deviational variables, - which are the only terms in the objective
function.
34Example of Goal Programming
Harrison Electric Revisited
- Goals Harrisons management wants to
- achieve, each equal in priority
- Goal 1 to produce as much profit above 30 as
possible during the production period. - Goal 2 to fully utilize the available wiring
department hours. - Goal 3 to avoid overtime in the assembly
department. - Goal 4 to meet a contract requirement to produce
at least seven ceiling fans.
35Example of Goal Programming
Harrison Electric Revisited
Need a clear definition of deviational variables,
such as
d1 underachievement of the profit target d1
overachievement of the profit target d2 idle
time in the wiring dept. (underused) d2
overtime in the wiring dept. (overused) d3
idle time in the assembly dept. (underused) d3
overtime in the wiring dept. (overused) d4
underachievement of the ceiling fan goal d4
overachievement of the ceiling fan goal
36Ranking Goals with Priority Levels
- A key idea in goal programming is that one
goal is more important than another. Priorities
are assigned to each deviational variable.
Priority 1 is infinitely more important than
Priority 2, which is infinitely more important
than the next goal, and so on.
37Analysis of First Goal
38Analysis of First and Second Goals
39Analysis of All Four Priority Goals
40Goal Programming Versus Linear Programming
- Multiple goals (instead of one goal)
- Deviational variables minimized (instead of
maximizing profit or minimizing cost of LP) - Satisficing (instead of optimizing)
- Deviational variables are real (and replace slack
variables)
419.2 Formulating Integer Programming Problems
- Practical solutions can be formulated as IPs.
- The basics of formulating an IP model
42Example 1 Capital Budgeting IP
- Stockco is considering four investments
- Each investment
- Yields a determined NPV
- Requires a certain cash flow at the present time
- Currently Stockco has 14,000 available for
investment. - Formulate an IP whose solution will tell Stockco
how to maximize the NPV obtained from the four
investments.
43Example 1 Solution
- Begin by defining a variable for each decision
that Stockco must make. - The NPV obtained by Stockco is Total NPV
obtained by Stocko 16x1 22x2 12x3 8x4 - Stockcos objective function is max z 16x1
22x2 12x3 8x4 - Stockco faces the constraint that at most 14,000
can be invested. - Stockcos 0-1 IP is
max z 16x1 22x2 12x3 8x4 s.t. 5x1
7x2 4x3 3x4 14 xj 0 or 1 (j 1,2,3,4)
44 Set Covering as an IP
- In a set-covering problem, each member of a given
set must be covered by an acceptable member of
some set. - The objective of a set-covering problem is to
minimize the number of elements in set 2 that are
required to cover all the elements in set 1.
45 Piece-wise linear functions as IP
- 0-1 variables can be used to model optimization
problems involving piecewise linear functions. - A piecewise linear function consists of several
straight line segments. - The graph of the piecewise linear function is
made of straight-line segments. - The points where the slope of the piecewise
linear function changes are called the break
points of the function. - A piecewise linear function is not a linear
function so linear programming cannot be used to
solve the optimization problem.
46 Piece-wise linear functions as IP
- By using 0-1 variables, however, a piecewise
linear function can be represented in a linear
form. Suppose the piecewise linear function f (x)
has break points .
47 Piece-wise linear functions as IP
- Suppose the piecewise linear function f (x) has
break points . - Step 1 Wherever f (x) occurs in the optimization
problem, replace f (x) by
. - Step 2 Add the following constraints to the
problem
48 Piece-wise linear functions as IP
- If a piecewise linear function f(x) involved in a
formulation has the property that the slope of
the f(x) becomes less favorable to the decision
maker as x increases, then the tedious IP
formulation is unnecessary. - LINDO can be used to solve pure and mixed IPs.
- In addition to the optimal solution, the LINDO
output also includes shadow prices and reduced
costs. - LINGO and the Excel Solver can also be used to
solve IPs.
499.4 The Branch-and-Bound Method for Solving Mixed
Integer Programming Problems
- In mixed IP, some variables are required to be
integers and others are allowed to be either
integer or non-integers. - To solve a mixed IP by the branch-and-bound
method, modify the method by branching only on
variables that are required to be integers. - For a solution to a subproblem to be a candidate
solution, it need only assign integer values to
those variables that are required to be integers
509.5 Solving Knapsack Problems by the
Branch-and-Bound Method
- A knapsack problem is an IP with a single
constraint. - A knapsack problem in which each variable must be
equal to 0 or 1 may be written as - When knapsack problems are solved by the
branch-and-bound method, two aspects of the
method greatly simplify. - Due to each variable equaling 0 or 1, branching
on xi will yield in xi 0 and an xi 1 branch. - The LP relaxation may be solved by inspection.
max z c1x1 c2x2 cnxn s.t. a1x1
a2x2 anxn b x1 0 or 1 (i
1, 2, , n)
519.6 Solving Combinatorial Optimization Problems
by the Branch-and-Bound Method
- A combinatorial optimization problem is any
optimization problem that has a finite number of
feasible solutions. - A branch-and-bound approach is often the most
efficient way to solve them. - Examples of combinatorial optimization problems
- Ten jobs must be processed on a single machine.
It is known how long it takes to complete each
job and the time at which each job must be
completed. What ordering of the jobs minimizes
the total delay of the 10 jobs?
52 - A salesperson must visit each of the 10 cities
before returning to his home. What ordering of
the cities minimizes the total distance the
salesperson must travel before returning home?
This problem is called the traveling sales person
problem (TSP). - In each of these problems, many possible
solutions must be considered.
53 - When using branch-and-bound methods to solve TSPs
with many cities, large amounts of computer time
is needed. - Heuristic methods, or heuristics, can be used to
quickly lead to a good solution. - Heuristics is a method used to solve a problem by
trial and error when an algorithm approach is
impractical. - Two types of heuristic methods can be used to
solve TSP nearest neighbor method and
cheapest-insertion method.
54 - Nearest Neighbor Method
- Begin at any city and then visit the nearest
city. - Then go to the unvisited city closest to the city
we have most recently visited. - Continue in this fashion until a tour is
obtained. After applying this procedure beginning
at each city, take the best tour found. - Cheapest Insertion Method (CIM)
- Begin at any city and find its closest neighbor.
- Then create a subtour joining those two cities.
- Next, replace an arc in the subtour (say, arc (i,
j) by the combinations of two arcs---(i, k) and
(k, j), where k is not in the current
subtour---that will increase the length of the
subtour by the smallest (or cheapest) amount. - Continue with this procedure until a tour is
obtained. After applying this procedure beginning
with each city, we take the best tour found.
55 - Three methods to evaluate heuristics
- Performance guarantees
- Gives a worse-case bound on how far away from
optimality a tour constructed by the heuristic
can be - Probabilistic analysis
- A heuristic is evaluated by assuming that the
location of cities follows some known probability
distribution - Empirical analysis
- Heuristics are compared to the optimal solution
for a number of problems for which the optimal
tour is known
56 - An IP formulation can be used to solve a TSP but
can become unwieldy and inefficient for large
TSPs. - LINGO can be used to solve the IP of a TSP.
minimize s.t.
- cij distance from city i to city j
- xij 1 if tour visits i then j, and 0 otherwise
(binary) - ti arbitrary real numbers we need to solve for
579.7 Implicit Enumeration
- The method of implicit enumeration is often used
to solve 0-1 IPs. Many IP problems can be
converted to 0-1 IP problems. - Implicit enumeration uses the fact that each
variable must be equal to 0 or 1 to simplify both
the branching and bounding components of the
branch-and-bound process and to determine
efficiently when a node is infeasible. - The tree used in the implicit enumeration method
is similar to those used to solve 0-1 knapsack
problems. - Some nodes have variable that are specified
called fixed variables.
58 - All variables whose values are unspecified at a
node are called free variables. - For any node, a specification of the values of
all the free variables is called a completion of
the node. - Three main ideas used in implicit enumeration
- Suppose we are at any node with fixed variables,
is there an easy way to find a good completion of
the node that is feasible in the original 0-1
TSP? - Even if the best completion of a node is not
feasible, the best completion gives us a bound on
the best objective function value that can be
obtained via feasible completion of the node.
This bound can be used to eliminate a node from
consideration.
59 - At any node, is there an easy way to determine if
all completions of the node are infeasible? - In general, check whether a node has a feasible
completion by looking at each constraint and
assigning each free variable the best value for
satisfying the constraint.
609.8 Cutting Plane Algorithm
- An alternative method to the branch-and-bound
method is the cutting plane algorithm. - Summary of the cutting plane algorithm
- Step 1 Find the optimal tableau for the IPs
programming relaxation. If all variables in the
optimal solution assume integer values, we have
found an optimal solution to the IP otherwise,
proceed to step2. - Step 2 Pick a constraint in the LP relaxation
optimal tableau whose right-hand side has the
fractional part closest to 1/2. This constraint
will be used to generate a cut. - Step 2a For the constraint identified in step 2,
write its right-hand side and each variables
coefficient in the form x f, where 0 lt f lt 1.
61 9.8 Cutting Plane Algorithm
- Step 2b Rewrite the constraint used to generate
the cut as - All terms with integer coefficients all terms
with fractional coefficientsThen the cut is - All terms with fractional coefficients lt 0
- Step 3 Use the simplex to find the optimal
solution to the LP relaxation, with the cut as an
additional constraint. - If all variables assume integer values in the
optimal solution, we have found an optimal
solution to the IP. - Otherwise, pick the constraint with the most
fractional right-hand side and use it to generate
another cut, which is added to the tableau. - We continue this process until we obtain a
solution in which all variables are integers.
This will be an optimal solution to the IP.
62 9.8 Cutting Plane Algorithm
- A cut generated by the method above has the
following properties - Any feasible point for the IP will satisfy the
cut - The current optimal solution to the LP relaxation
will not satisfy the cut