Title: Now is this a high risk job?
1Now is this a high risk job?
JSA
2HIGH RISK JOBS RED CODE
THE FOLLOWING IS A HIGH RISK TASK FOR WHICH A
JSA FORM MUST BE FILLED OUT PRIOR TO COMMENCEMENT
OF WORKS.
ASBESTOS OR LEAD -Jobs that require us to work
with asbestos or lead
WORKING WITH ASBESTOS, OR UNDERTAKING A JOB WHERE
THERE IS A LIKELIHOOD THAT ASBESTOS IS PRESENT IS
A HIGH RISK TASK FOR WHICH A JSA FORM MUST BE
FILLED OUT PRIOR TO COMMENCEMENT OF WORK.
3HIGH RISK JOBS RED CODE
THE FOLLOWING IS A LIST OF OTHER HIGH RISK TASKS
FOR WHICH A JSA FORM MUST BE FILLED OUT PRIOR TO
COMMENCEMENT OF WORKS.
WORKING AT HEIGHTS -Jobs that require being more
than 2 metres high (from the ground to your
feet)
WORKING NEAR POWER LINES -Jobs that require us to
work closer than 6 metres to a main power line
on the street. And Closer than 2 metres to a
private power line to a private house.
GAS LINES -Jobs that require us to work near gas
lines, or with gas lines. Natural or LPG
DEMOLITION -Jobs that require us to carry out
demolition works, stripping walls Pull off roofs,
excavate concrete.
4Job Safety Analysis worksheet
Date
Jsa no.
Company name
Site name
Permit to work requirement
Yes
No
Contractor
Approved by
Activity
Activity
Hazards
Risk control measures
Who is responsible
List the tasks required to perform the activity
in the sequence they are carried out.
Against each task list the hazard that could
cause injury when the task is performed
List the control measures required to eliminate
or minimize the risk of injury arising from the
identified hazard.
Write the name of the person responsible
(supervisor or above) to implement the control
measure identified.
Remember Each JSA must be site specific. Include
all workers in the development of the JSA
5The following is a guide only and for compiling
your JSA, each jobs JSA must be completed on its
own merits.
6 REMOVING AC SHEET (less than 10m2 and to take
less than one hour) Working with asbestos, or
undertaking a job where there is a likelihood
that asbestos is present is a high risk task for
which a JSA form must be filled out prior to
commencement of work
7Job Safety Analysis worksheet
Date
Jsa no.
OFFICE TO ADVISE
Company name
DATE WORK BEGINS
KELLY PLUMBING
Site name
Permit to work requirement
Yes
No
INSERT JOB NAME
Contractor
Approved by
PHIL KELLY TO SIGN
INSERT YOUR NAME
Activity
REMOVING AC SHEET
8Job Safety Analysis worksheet
Risk control measures
Activity
Hazards
Against each task list the hazard that could
cause injury when the task is performed
List the control measures required to eliminate
or minimize the risk of injury arising from the
identified hazard.
List the tasks required to perform the activity
in the sequence they are carried out.
1 Identify material as AC sheet
Asbestos containing material
Complete asbestos risk assessment
- Site records
- Visual inspection
- Deem to be ACM (from knowledge experience)
2 Asbestos risk assessment must be
completed prior to work commencing
GUIDE ONLY
9Job Safety Analysis worksheet
Risk control measures
Activity
Hazards
Against each task list the hazard that could
cause injury when the task is performed
List the control measures required to eliminate
or minimize the risk of injury arising from the
identified hazard.
List the tasks required to perform the activity
in the sequence they are carried out.
3 Access material to be removed
- Remove AC sheet
- NB time cannot exceed one hour or 10m2
- completed asbestos risk assessment
- restrict access to work area
- put all necessary equipment in place that is
required for work - don PPE (P2 mask and disposable coveralls)
- wet down ACM
- take care to minimise breakage
Exposure to airborne asbestos fibres Creation of
visible asbestos debris
- prepare for removal
- remove AC sheet
- bag/wrap sheet
- dispose of sheet
GUIDE ONLY
10Job Safety Analysis worksheet
Risk control measures
Activity
Hazards
Against each task list the hazard that could
cause injury when the task is performed
List the control measures required to eliminate
or minimize the risk of injury arising from the
identified hazard.
List the tasks required to perform the activity
in the sequence they are carried out.
- wet wipe all surfaces in contact with ACM
- Visual inspection no ACM debris
- double bag or wrapped in 200?m plastic
- label as per EPA requirements
- seal as soon as practicable
- transport to licensed waste disposal site
- NO visible debris at site at completion of work
5 Install new sheet
GUIDE ONLY
11 WORKING AT HEIGHTS -many jobs where asbestos
may be present can also require being more than 2
metres high (measured from the ground to your
feet)
12AUTHORISED ROOF WORKS ACCORDING TO THE PITCH
FLAT ROOF UP TO 5 DEGREES
UP TO 25 DEGREES
25 TO 30 DEGREES
30 DEGREES AND OVER
Complete your JSA and you are authorised to sign
it off
NO GO
Complete your JSA and you are authorised to sign
it off
Complete your JSA and PHIL KELLY/Manager must
sign the job off
13PRE ROOF CHECKLIST
Do you have your PPE Gear (Personal Protective
Equipment) ?
Are you authorised to work at that height ?
Do you have your safety harness on board ?
Does a guard rail need to be assembled ?
Do you need any scaffolds, mobile lifts, boom
equipment
DONT GET LEFT HIGH DRY, THINK ABOUT YOUR JOB
BEFORE YOU START!
14Job Safety Analysis worksheet
Risk control measures
Activity
Hazards
Against each task list the hazard that could
cause injury when the task is performed
List the control measures required to eliminate
or minimize the risk of injury arising from the
identified hazard.
List the tasks required to perform the activity
in the sequence they are carried out.
- Dont go above 3 metres in height above the
ground
Getting on the roof
- Using an extension ladder
- Tie the ladder off top and bottom
- Wear your protective boots with grip (see your
PPE)
- Have 3 points of contact on the ladder at all
times
- Feet of the ladder in good order
- Make sure the ladder goes 900mm over the top of
the roof, unless through a manhole
GUIDE ONLY
DONT FORGET YOUR PPE
15Job Safety Analysis worksheet
Risk control measures
Activity
Hazards
Against each task list the hazard that could
cause injury when the task is performed
List the control measures required to eliminate
or minimize the risk of injury arising from the
identified hazard.
List the tasks required to perform the activity
in the sequence they are carried out.
Getting on the roof
- Converts to a low risk task
- Do not go any closer than 2 metres to the edge
DONT FORGET YOUR PPE
GUIDE ONLY
16Job Safety Analysis worksheet
Risk control measures
Activity
Hazards
Against each task list the hazard that could
cause injury when the task is performed
List the control measures required to eliminate
or minimize the risk of injury arising from the
identified hazard.
List the tasks required to perform the activity
in the sequence they are carried out.
Getting Materials on the roof
- 16kg and under use a bucket and a rope
- 16kg and over use a crane or the mobile forklight
- Or any other approved devices to carry equipment
DONT FORGET YOUR PPE
GUIDE ONLY
17Job Safety Analysis worksheet
Risk control measures
Activity
Hazards
Against each task list the hazard that could
cause injury when the task is performed
List the control measures required to eliminate
or minimize the risk of injury arising from the
identified hazard.
List the tasks required to perform the activity
in the sequence they are carried out.
- Wear your appropriate work boots with steel caps
at all times ((see your PPE)
Working on the roof
- Wear your roof harness if going closer then 2
metres to edge of roof and/or
- Use a guard rail if working closer then 2 metres
to the edge
- Take your time, dont run choose your foot holes
carefully
DONT FORGET YOUR PPE
GUIDE ONLY
18Job Safety Analysis worksheet
Risk control measures
Activity
Hazards
Against each task list the hazard that could
cause injury when the task is performed
List the control measures required to eliminate
or minimize the risk of injury arising from the
identified hazard.
List the tasks required to perform the activity
in the sequence they are carried out.
Getting off the roof
- Make sure your ladder is secured
- Disconnect your harness and make a slow decent
after all equipment is disconnect and all
materials are off the roof
- DISCONNECT YOUR HARNESS LAST
DONT FORGET YOUR PPE
GUIDE ONLY
19 END OF PRESENTATION Thankyou