Title: ChaeSub LEE
1Future Work Plan and Further Key Issues in NGN
- Chae-Sub LEE
- TTA
- Chae-sub.lee_at_ties.itu.int
2Table of Contents
- Further Key Issues on NGN
- Future Work plan of NGN Standards
- Action Plan on NGN Standards
3Further Key Issues on NGN
Overall Considerations for future works
- FGNGN closed at November 2005, further work
could be continued through NGN-GSI with JRG
activities - January NGN-GSI meeting could be the place to
review and re-exam all FGNGN deliverables - This means that future work will be based on the
results of FGNGN (and might be very similar
subjects or areas) - General observations on direction of
contributions
- Western Europe Bring TISPAN and 3GPP results
- Eastern Europe mainly Migration aspects
- North American IMS based and some of
application oriented subjects (IP TV,
Management etc.) - Asia ???
4Further Key Issues on NGN
- PSTN/ISDN Emulation aspects SG13 Q7
- NGN Signaling aspects (include SIP Profiling)
SG11 and SG13 - NGN QoS and control aspects (include RACF
issues) SG11, 12 and 13 together - Mobility and FMC issues SG13 and 19 together
(need encourage of FMC aspects and co-work
between SG13 and 19) - Home Networking and gateways SG9, 13 and 16
together - Network aspects of ID services/systems (include
N-RFIDS) SG13 and 16 together at initial
stage - NGN Security ascpects SG13 and SG17 together
- NGN Business Models and its impacts SG13 and
CJK internal use - NGN Testbed CJK internal use
- Others
5Future Work Plan on NGN Standards
6One Step Forward in CJK NGN Activity
- Future objectives of CJK NGN-WG - until today,
CJK NGN-WG mainly focus on collaboration for
ITU-T NGN activities - for the future, CJK
NGN-WG will be moved to develop Standards - Future actual activities in CJK NGN-WG for
developing standards - developing new/own CJK
standards - identify missing issues and develop
as standards - Enhance or update deliverables
based on ITU-T results - Propose building Drafting Group in CJK NGN-WG
based on ITU-T results - build Drafting Group
based on ITU-T deliverables or draft
recommendations - ToR of Drafting Group could
be following 1) Enhancement of deliverables
or draft recommendations from CJK point of view
2) This activity could be based on
documentation from ITU-T 3) Collect inputs
from CJK members/experts, lead discussion and
yield resulted enhancement and update of
documentation 4) Take approval from CJK
NGN-WG members through management 5) Prepare
the results as input contributions to ITU-T
6) These process will circulate until finish of
the document
7One Step Forward in CJK NGN Activity
Possible candidate areas (deliverables and draft
recommendations)
- From FGNGN (deliverables) - WG 1
Requirements and capabilities of NGN R1 - WG 2
FRA, PIEA, CSF - WG 3 RACF, TR-msnniqos,
TR-e2eqos.1, TR-enet, TR-ipaqos - WG 5
Security Frameworks and guideline - WG 6
Migration, Scenarios, Emulation and scenarios -
WG 7 FPBN Requirements and capabilities - From Study Group 11 ???
- From Study Group 13 - WP 1 Release 1 scope
and requirements - WP 2
8One Step Forward in CJK NGN Activity
- WP 3
9One Step Forward in CJK NGN Activity
- WP 3
10One Step Forward in CJK NGN Activity
- WP 3
11One Step Forward in CJK NGN Activity
- WP 3
12One Step Forward in CJK NGN Activity
- WP 3
13One Step Forward in CJK NGN Activity
- WP 4
14One Step Forward in CJK NGN Activity
- WP 4