ChaeSub LEE - PowerPoint PPT Presentation

1 / 14
About This Presentation
Title:

ChaeSub LEE

Description:

The 5th CJK NGN-WG Meeting. December 15~16, 2005, Bundang, ... TDM-MPLS network interworking User plane interworking Corrigendum 1. Q.7/13. Y.1413, Cor. ... – PowerPoint PPT presentation

Number of Views:27
Avg rating:3.0/5.0
Slides: 15
Provided by: industry2
Category:

less

Transcript and Presenter's Notes

Title: ChaeSub LEE


1
Future Work Plan and Further Key Issues in NGN
  • Chae-Sub LEE
  • TTA
  • Chae-sub.lee_at_ties.itu.int

2
Table of Contents
  • Further Key Issues on NGN
  • Future Work plan of NGN Standards
  • Action Plan on NGN Standards

3
Further Key Issues on NGN
Overall Considerations for future works
  • FGNGN closed at November 2005, further work
    could be continued through NGN-GSI with JRG
    activities
  • January NGN-GSI meeting could be the place to
    review and re-exam all FGNGN deliverables
  • This means that future work will be based on the
    results of FGNGN (and might be very similar
    subjects or areas)
  • General observations on direction of
    contributions
  • Western Europe Bring TISPAN and 3GPP results
  • Eastern Europe mainly Migration aspects
  • North American IMS based and some of
    application oriented subjects (IP TV,
    Management etc.)
  • Asia ???

4
Further Key Issues on NGN
  • PSTN/ISDN Emulation aspects SG13 Q7
  • NGN Signaling aspects (include SIP Profiling)
    SG11 and SG13
  • NGN QoS and control aspects (include RACF
    issues) SG11, 12 and 13 together
  • Mobility and FMC issues SG13 and 19 together
    (need encourage of FMC aspects and co-work
    between SG13 and 19)
  • Home Networking and gateways SG9, 13 and 16
    together
  • Network aspects of ID services/systems (include
    N-RFIDS) SG13 and 16 together at initial
    stage
  • NGN Security ascpects SG13 and SG17 together
  • NGN Business Models and its impacts SG13 and
    CJK internal use
  • NGN Testbed CJK internal use
  • Others

5
Future Work Plan on NGN Standards
6
One Step Forward in CJK NGN Activity
  • Future objectives of CJK NGN-WG - until today,
    CJK NGN-WG mainly focus on collaboration for
    ITU-T NGN activities - for the future, CJK
    NGN-WG will be moved to develop Standards
  • Future actual activities in CJK NGN-WG for
    developing standards - developing new/own CJK
    standards - identify missing issues and develop
    as standards - Enhance or update deliverables
    based on ITU-T results
  • Propose building Drafting Group in CJK NGN-WG
    based on ITU-T results - build Drafting Group
    based on ITU-T deliverables or draft
    recommendations - ToR of Drafting Group could
    be following 1) Enhancement of deliverables
    or draft recommendations from CJK point of view
    2) This activity could be based on
    documentation from ITU-T 3) Collect inputs
    from CJK members/experts, lead discussion and
    yield resulted enhancement and update of
    documentation 4) Take approval from CJK
    NGN-WG members through management 5) Prepare
    the results as input contributions to ITU-T
    6) These process will circulate until finish of
    the document

7
One Step Forward in CJK NGN Activity
Possible candidate areas (deliverables and draft
recommendations)
  • From FGNGN (deliverables) - WG 1
    Requirements and capabilities of NGN R1 - WG 2
    FRA, PIEA, CSF - WG 3 RACF, TR-msnniqos,
    TR-e2eqos.1, TR-enet, TR-ipaqos - WG 5
    Security Frameworks and guideline - WG 6
    Migration, Scenarios, Emulation and scenarios -
    WG 7 FPBN Requirements and capabilities
  • From Study Group 11 ???
  • From Study Group 13 - WP 1 Release 1 scope
    and requirements - WP 2

8
One Step Forward in CJK NGN Activity
- WP 3
9
One Step Forward in CJK NGN Activity
- WP 3
10
One Step Forward in CJK NGN Activity
- WP 3
11
One Step Forward in CJK NGN Activity
- WP 3
12
One Step Forward in CJK NGN Activity
- WP 3
13
One Step Forward in CJK NGN Activity
- WP 4
14
One Step Forward in CJK NGN Activity
- WP 4
Write a Comment
User Comments (0)
About PowerShow.com