Transcript and Presenter's Notes

Title: DOE Undelivered Orders UDO Remediation Progress Update


1
DOE Undelivered Orders (UDO) Remediation Progress
Update
Superusers/Financial Statement Workshop March 20
22, 2007
  • Rick Loyd, Director, Office of Finance and
    Oversight

2
KPMG DOE Audit Report stated
  • Accounting for obligations and undelivered orders
  • Found significant deficiencies in the
    Departments internal controls over the timely
    recording of the obligation and de-obligation of
    funds.
  • The identified deficiencies precluded the
    Department from ensuring the accuracy, validity,
    and completeness of obligations and undelivered
    orders.
  • The Department should enhance established
    controls to ensure that
  • obligations are recorded in a timely manner
  • correct all remaining conversion errors
  • resolve and correct negative undelivered order
    balances
  • ensure that obligated funds are promptly
    de-obligated when those funds are no longer needed

3
DOE UDO Corrective Action Plan
  • Near Term Corrective Actions (Q2)
  • Phase 1 UDO Review gt 500k
  • Negative UDO/Blank CID Correction
  • Correction Guide for Legacy UDO Issues
  • Automatic De-obligation of Travel and Training
    Obligations
  • Checklist Implementation
  • Mid Term Corrective Actions (Q3 Q4)
  • Phase 2 UDO Review lt 500K
  • Improve UDO Guidance/STARS Reports
  • New GL to PO Reconciliation Discoverer Report
  • CDR Report Revisions
  • Stale Balance Reports
  • 2108 Review Certification Guidance
  • Communicate and Partner with Programs and
    Procurement Officials (Ongoing)

4
Solid Progress To Date
  • Near Term Corrective Actions (Q2)
  • UDO Review by Value gt 500k
  • 99 complete, 1172 CIDs reviewed, net obligation
    3.7 million
  • Negative UDO/Blank CID Correction
  • 96 complete, 396 CIDs corrected, net obligation
    12.9 million
  • Automatic De-obligation of Travel Obligations
  • Completed Jan 25. 2821 CIDs de-obligated for
    1.4 million
  • Automatic De-obligation Training Obligations
  • Completed Feb 15. 1625 CIDs de-obligated for
    800 thousand
  • Checklist Implemented
  • KPMG Audit review of UDO and Abnormal Balances
    began Feb. 26
  • 8 sites to be reviewed varying sample sizes
  • Audit work completed at 2 sites no audit
    findings

5
Phase 2 Review Population
The Population
Allottees CIDs
  • Phase 2 Review encompasses the 9/30/2006 UDO
    population not addressed by the Phase 1 review
  • Excluding those CIDs subject to the new automated
    deobligation process (travel and training UDO
    balances less than 5,000)
  • Excludes CIDs for which the UDO balance has been
    liquidated during FY 2007
  • A listing of the current Phase 2 population was
    e-mailed to each allottee

6
Phase 2 Review Methodology
  • The Phase 2 review will only require a
    reconciliation of the current cumulative
    obligation balance, and not the 9/30/2006 balance
    as was required for Phase 1.
  • The Phase 2 review will not include a stale
    balance review for all CIDs in the review
    population, as was the case with the Phase 1
    review. Instead, offices will perform the stale
    balance procedures in this SOP only for those
    CIDs identified on the Stale Balance Report.

7
Phase 2 Review Methodology (Continued)
  • Field CFOs should use a risk-based approach to
    ensure those CIDs with the most likelihood of
    having errors impacting the 2108 and financial
    statements are reviewed and corrected prior to
    June 30th.
  • Differences identified by the GL to PO
    reconciliation procedures would be one example of
    identifying those CIDs with a higher risk of data
    errors. Another risk-based strategy would be to
    review the CIDs with the largest balances first,
    or those that are more likely to lack supporting
    documentation.
  • It is expected that all UDOs identified below
    will be reconciled to source documents, and
    corrections made if necessary, by September 30,
    2007.
  • The Correction Guide for Legacy UDO Issues
    provides information and tools to assist field
    offices in identifying and resolving differences
    most likely to be encountered.
  • Reconciliation of the STARS GL undelivered order
    balance to the office's procurement system may be
    substituted for actual source document
    verification if the cumulative obligation
    balances in both systems for the CID are the
    same.

8
Phase 2 Reporting and Documentation
  • Field CFOs will report the summary results of the
    progress of their Phase 2 reviews on the 5th
    workday of each month. The summary information
    to be provided includes the
  • Number and dollar value of UDOs reconciled to
    source documents
  • Number and dollar of UDOs to be
    reviewed/corrected
  • The monthly summary information should be
    e-mailed to Bill Johnson at william.johnson_at_hq.doe
    .gov
  • Documentation of the Phase 2 reconciliations
    should be maintained locally to provide audit
    evidence that the reconciliations were performed.

9
Questions/Comments?
  • Field CFO comments due next week on Phase 2
    requirements, as well as the rest of the revised
    Obligation Review and 2108 Certification Guide