2006 California Bridge Construction Forum - PowerPoint PPT Presentation

1 / 18
About This Presentation
Title:

2006 California Bridge Construction Forum

Description:

Purpose of Forum. Share information & concerns. Collect ... Overview of Past Forums. 2001 Forums. 2002 Forums. 2003 cancelled, travel restrictions. 2005 Forum ... – PowerPoint PPT presentation

Number of Views:42
Avg rating:3.0/5.0
Slides: 19
Provided by: non8134
Learn more at: https://dot.ca.gov
Category:

less

Transcript and Presenter's Notes

Title: 2006 California Bridge Construction Forum


1
2006 California Bridge Construction Forum
  • Opening Remarks
  • Dolores Valls, Chief, Statewide Operations
  • Offices of Structure Construction

2
Overview
  • Special Thanks
  • Purpose of Forum
  • Overview of Past Forums
  • 2006 Expectations

3
Special Thanks
  • CT/ Industry Joint Agenda Committee
  • Duff Joseph, Erreca Inc.
  • Craig Huss, Griffith Company
  • Robert (Rusty) Crain, ACM District 4 N/E
  • Mike Beauchamp, ACM Districts 8 9
  • Mike Halverson, Facilitator

4
Purpose of Forum
  • Share information concerns
  • Collect ideas and suggestions
  • Improve practices and relationships
  • Were here to communicate!

5
Overview of Past Forums
  • 2001 Forums
  • 2002 Forums
  • 2003 cancelled, travel restrictions
  • 2005 Forum

6
2001 Bridge Construction Forum
  • Process established
  • Joint Committee of Industry/ OSC Managers
  • Survey sent out
  • 4 workshops from popular response areas

7
2001 Workshops Topics
  • Falsework practices
  • Flyash/ bridge deck cracking
  • Training OSC staff
  • Support/ Authority of OSC staff

8
2001 Forum Action Items
  • FALSEWORK PRACTICES
  • F/W Academy on-line training
  • Preapproved Standard F/W details
  • F/W Welding Spec. Change
  • Revised spec. for demands gt 1000 per eighth in.
    requires F/W designer to specify welding code

9
2001 Action Items
  • FLYASH/ BRIDGE DECK CRACKING
  • Improve distribution of flyash knowledge
  • METS outreaches with Industry
  • Translab tour
  • Std. Spec. Changes
  • Eliminate method specs for curing

10
2001 Forum Action Items
  • TRAINING OSC Staff
  • Improve Contractor/State working relationship
  • OSC committed to Partnering and Forums
  • Train Inexperienced staff
  • Senior Specialist positions
  • On-line training modules

11
2002 Forums Topics
  • Innovations for Acceleration
  • Quality Control Quality Assurance
  • Welding
  • Bridge Surveying practices

12
2002 Action Items
  • INNOVATIONS for Acceleration
  • Design for acceleration
  • CRIP spec revisions (structure type changes)
  • Delayed notice to proceed
  • Pre-approved shoring plans (RR approval)
  • QC/QA
  • More QC provisions in specs.

13
2002 Forums Action Items
  • WELDING
  • Revised Welding specs.
  • Deleted submittal of AWS welding code books
  • No CWI requirements for resistance welding
  • WQCP Templates
  • Statewide Welding training

14
2002 Forums Action Items
  • Bridge Construction SURVEYING
  • New OSC Practices Guidelines
  • Statewide training
  • Revised Department Survey Manual

15
2005 Forum Topic Falsework Construction Safety
  • Falsework Erection and Removal
  • Falsework Grading and Jacking
  • Column Cage Construction Guying Plans

16
2005 Forum Action Items
  • Column Cage Research
  • Developed Research proposal
  • Call for submissions (12/05)
  • Proposals due 2/06
  • Produce a Falsework Safety Video
  • Completed filming
  • Showing clips at current training classes

17
2005 Action Items
  • Updates to Falsework Manual
  • Guidelines for Erection, Grading/Jacking, and
    Removal plans
  • Establish a CT/ Industry Team
  • First meeting held
  • Quarterly meetings

18
2006 Forum Expectations
  • New Action Items for Improvements
  • Management Panel for open discussion
  • Feedback on value of Forums
Write a Comment
User Comments (0)
About PowerShow.com