VII California Team Meeting
  • June 5, 2008
  • MTC

2
Agenda Items
  • SAFE TRIP-21 - roles for participants.
  • Awarded to Caltrans
  • Discussion of SAFE TRIP-21 Approach
  • Ramifications
  • POC Testing
  • SDN progress and plans
  • Dumbarton Bridge/VII Tolling plans and progress
  • CICAS intersections plans and progress
  • Progress on Lane Positioning
  • HA-NDGPS and other

3
SAFE-TRIP 21
4
From USDOT (RITA)
  • "A cooperative agreement was awarded to
    California Department of Transportation
    (Caltrans) who within the availability of funds
    provided the best value to the Government in
    meeting the goals, objectives and requirements of
    Safe Trip-21."

5
Discussion of SAFE TRIP-21 Approach
  • Ramifications on
  • Our Region Research Questions Addressed
  • VII California Testbed
  • Broadened in visibility, extent, multi-band
    capability, duration and application users
  • Vehicle OEM Laboratories
  • Our Activities

6
RSE Installations
  • 30 locations (20 intersections, 10 freeway
    sites)
  • Original goal was to do it in two months starting
    in June, new starting date is June/July
  • Emphasis will be on expanding the existing
    testbed by populating it with more RSEs
  • Some of existing RSEs will be retrofitted
  • Locations outside the current testbed will be
    considered
  • Used latest version of MCNU, new GPS, and new
    WiFi
  • California / ECR was retrofitted this past
    Saturday (more later)

7
RSE Installations (cont.)
  • Installations will be done by a subcontractor
    (not Caltrans)
  • Sole source justification submitted
  • Subcontractor has extensive experience working
    for Caltrans and PATH
  • Subcontractor will obtain all the required
    permits to work on Caltrans Right-of-Way
  • Subcontractor is ready to start pending
  • Contract Progress
  • MCNU availability Hardware (including Power
    Supplies) Software issues need to be solved
    before installation
  •  

8
RSE Installations (cont.)
  • The recommended list of first 5 new
    installations
  • 1. Marsh Road US 101
  • 2. University  US101
  • 3. Matadero ECR
  • 4. Cambridge ECR
  • 5. Embarcadero ECR
  • The above list is based on the following
    Stanford Margeurite Shuttle route (as a possible
    probe), location of existing RSEs, proximity to
    current VII California Test Bed, and site surveys
  •  

9
California / ECR Intersection
10
California / ECR Intersection
11
California / ECR Intersection
  • Done on 5-31-2008 by Caltrans Maintenance and
    PATH
  • It is working
  • It will be used to serve as a test RSE for the
    next 30 installations with new MCNUs

12
POC Testing
13
VII CA SDN Network Access Point
  • Server equipment delivered
  • DS3 line installed
  • Cisco network equipment delivered
  • Securent license ordered May 13
  • Notified Cisco April 24
  • Received vendor (ATT) quote May 9
  • Promised ship date in late May
  • Checkpoint Firewall
  • Original order in April
  • Confusion with vendor led to original delivery
    date quoted as May 12
  • Vendor promised June 4 ship date

14
VII Tolling Status
  • RSE installed
  • LTP (Lane Transaction Processor) being shipped
  • Mark IV providing support for LTP
  • Changes will be made to support MTC Tolling
    application
  • Application design and development underway

15
Dumbarton RSE Installation

MCNU and the NEMA enclosure Space available to
place LTP
Local Transaction Processor Not yet installed
16
Dumbarton RSE

The Dumbarton RSE Installation The MCNU has
been installed for supporting the tolling
application Build number 1.73232 - Consistent
with the requirement Waiting for backhaul
connection
17
Checklist for LTP-RSE
Responsibilities PATH RSE connected to
backhaul and remote access verified LTP
attached to RSE If LTP to use separate
backhaul, connection and remote access verified
This requires setting IP address on LTP
according to the user manual MARK IV
Remotely access RSE and LTP and configure them
for application usage Install current POC
application as interim means to verify operation
18
OBE for Tolling Application
VII Parvus OBE bench tested A3s being
installed with the VII Parvus OBEs Update
positioning bundle to 1.7.1.1 (?)? After
installation we need to check - connectivity
with the RSE at Dumbarton - GPS alignment
verification
19
Savari On Board Unit GPS Testing
Savari OBU GPS Testing GPS tests done in South
Bay, near US101 utilizing the VIICA test-bed
RSU5. Red dots indicate test vehicle trajectory
and the green dot is the RSU, overlaid on Google
Map. Fairly accurate match with the road was
verified.
20
CICAS Intersections
21
Progress on Lane Positioning (HA-NDGPS and Other)
22
UCR HA-NDGPS Implementationand DGPS Evaluation
  • Objective Create a HA-NDGPS correction
    equivalent base station and evaluate in
    comparison with alternative DGPS architectures
  • L1/L2 CP-DGPS base station with conversion
    software to High Accuracy signal
  • Broadcast high accuracy signal over DSRC
    architecture
  • Evaluate CP-DGPS performance characteristics with
    alternative methods
  • Tasks
  • Obtain Hardware/Software
  • Trimble 5700, NTRIP, GRIM, HA2RCTM, rover
    receivers
  • Set up initial test architectures at UC Riverside
    - POC
  • Deploy HA-NDGPS and suitable architecture for VII
    - FOT
  • Evaluate and compare HA-NDGPS and alternate
    positioning architectures
  • Document DSRC DGPS implementation requirements


23
Base Station Implementation
  • Installation Friday June 6, 2008
  • Test location Mercedes-Benz RD NA
  • Roof mounted geodetic antenna
  • Dedicated IP address
  • Network and facility support
  • Trimble 5700 L1/L2 Receiver
  • NTRIP Server
  • Broadcast Code/Carrier corrections via NTRIP -
    RTCM 2.3/3.0
  • HA-NDGPS message sent via NTRIP


24
HA-NDGPS Integrated with RSE DSRC
CE-CERT UC Riverside Future Site?
FOT Sites
MB RDNA Palo Alto

FOT Participants
25
Testing Initial NTRIP Corrections Utilizing
Existing Palo Alto CORS Site
Installation and operational instructions
available mike_at_cert.ucr.edu also on
VIICalifornia.org? Install NTRIP Client on
vehicle based computer (DSRC computer or
auxiliary) Stream RTCM 2.3 corrections to
on-board GPS Participants needed for June testing
http//pboweb.unavco.org

26
Technocom DGPS Message
  • Technocom DSRC u-blox Antaris 3/4 GPS chipset

ANTARIS TIM-Lx GPS Modules System Integration
Manual/ Reference Design http//www.u-blox.com/cus
tomersupport/gps.g3/TIM-Lx_Sys_Int_Manual(GPS.G3-M
S3-01001).pdf

27
Next Steps
  • Finalize POC test architectures at UC Riverside
  • Complete initial comparison testing under
    controlled conditions
  • Test NTRIP architecture VII FOT (mid June)
  • Test NTRIP integrated base station (June)
  • NTRIP/HANDGPS architecture field test (mid July)
  • Test and evaluate DGPS alternatives
  • CORS-NTRIP architecture sub-meter positioning
    verification
  • DSRC RTCM correction signal transmission
    verification
  • Cellular RTCM correction signal transmission
    verification
  • WAAS correction DGPS performance evaluation
  • Aided DGPS solutions (dead reckoning, INS, etc.)
  • GPS signal integrity (i.e., drop outs) testing in
    adverse environments


28
Planned Schedule